ENTITY ID CODE NAME STATUS TYPE DESCRIPTION PURPOSE START DATE END DATE CURRENCY AMOUNT
11 RA\DEV\2015-16\02 CONSTRUCTION OF THE NJAKWA – LIVINGSTONIA ROAD
implementation
construction The Njakwa – Livingstonia Road project has a total length of 78.5Km 6.0 PROJECT BENEFITS The project has many benefits to the people along the road and to the country as a whole. Some of the benefits will include; 6.1 Road Maintenance costs With the new construction from gravel to bituminous surfaced standard, the road will operate in an all-weather condition. Ultimately, emergency maintenance works during the rainy season and costs will be reduced as concentration will be on routine maintenance activities such as drainage structures cleaning, line marking, grass cutting and patching of any potholes that may occur. 6.2 Vehicle Operating and Passenger Travel costs Vehicle operating costs savings constitute the most important benefit attributable to the project. This will have direct reduction on maintenance cost of the vehicles, reduced fuel consumption and travel time. 6.3 Agriculture The area where the road passes is an agricultural rich area for mainly tobacco, coffee, maize and bananas. The upgrading of the road will ease problems of transporting farm inputs and produce to and from various markets. 6.4 Environmental and Health The upgrading of the road will reduce the occurrence of dust and mud along the project area and thereby improving sanitation which means reduction in the spread of diseases which are airborne or waterborne. This will reduce the cost of medicines which would have been required to treat the people affected. The upgrading of the road will allow the communities good access to health facilities in town. 6.5 Employment Creation and Business Boosting The people around the area of the road project are also benefitting by getting employed in various road activities by the Contractor. During project implementation and after, a lot of businesses will mushroom along the project road and the communities will be empowered economically. 6.6 Boosting Mining The road will provide an all weather access to places of notable activities of national and economic importance like Kaziwiziwi coal mine and other undeveloped potential mining areas. 6.7 Tourism The road passes through a historical Livingstonia mission which has other establishments such as the University of Livingstonia. The road also passes through tourist attraction areas of Manchewe falls before descending the beautiful meandering Golodi escarpments to meet the M01 road at Chitimba. 2016-11-01 2020-05-01 MWK 39815658687.27
14 DZDC/GESD/W/2021-22 - LOT 1 Completion of Bema Dispensary
implementation
construction The works involve the completion of 1No dispensary, construction of 2No staff houses, provision of running water and all associated plumbing works To improve health service delivery in the district 2021-11-01 2022-03-01 MWK 85000000.00
13 001 Upgrading of M12 to Ludzi Road
completed
construction Upgrading to bituminous standard 6km Ease of transport to main district headquaters 2019-08-22 2020-04-30 MWK 1300000000.00
20 RA/DEV/14/08 UPGRADING OF THYOLO-THEKERANI-MUONA-MAKHANGA ROAD
implementation
construction The 83 km long project road is in the Southern Region of Malawi and traverses the districts of Thyolo and Nsanje. The project road branches off from the Limbe – Thyolo – Muloza (M02) road at Nambala Wani in Thyolo district and extends southwards passing through Muona trading centre and ending at Makhanga trading centre in Nsanje district. The project road is joined by the East Bank (S152) road at Muona trading centre before joining the (M01) road at Bangula trading centre. The project has many benefits to the people along the road and to the country as a whole. Some of the benefits include; 6.1 Boosting Agriculture The road passes through tea estates which is one of the major forex earners for Malawi. Upgrading this road will ensure that there is ease of access to markets for farm produce. 6.2 Direct employment during construction There is direct employment during construction which has a direct bearing on poverty reduction as many people including women are benefiting directly from the project, as some of them are being employed whereas some benefit through buying and selling of agriculture produce from their gardens. 6.3 Reduction in Vehicle Operating Costs Reconstruction and Upgrading of the road will result in reduction of vehicle operating costs which constitutes the major benefit attributable to such new projects. 6.4 Reduction in Travel Time The project will help reduce travel time from the agricultural rich Nsanje district towards the commercial city of Blantyre. 2016-08-15 2019-08-14 MWK 27317366355.36
23 MW-RA-51975-CW-RFB MALAWI SECOND AGRICULTURESECTOR WIDW APPROACH
completed
construction Upgrading of Junction M001(Chinyamula to Mphepozinai (10km) to Low Volume Seal Roads (LVR) Standards in Ntcheu District To help improve transportation of Farm Inputs and Farm Products 2019-08-05 2020-11-30 MWK 908000000.00
22 RA\DEV\2017-18\04 UPGRADING OF THE NTCHEU-TSANGANO-NENO ROAD LOT 1 (FIRST 21 KILOMETERS)
implementation
construction The Ntcheu-Tsangano-Neno-Mwanza Road is 140 Kms long. It starts from junction with M01 at Biriwiri (commonly known as Tsangano Turn-Off) passing through some trading centres like Kambilonjo, Doviko, Tsangano and connects with M06 at junction to Mwanza. This project involves the upgrading works from earth to bitumen standard of approximately 140 km of road section from Biriwiri to Mwanza. The project will be executed in a phased approach with the the first covering a distance of 21km from Biriwiri to Kambilonjo. The contract commenced on 3rd of April 2018 and will be completed on 3rd April 2019 .1 Direct employment during construction The people around the area of the road project will benefit by getting employed in various road activities by the Contractor. During project implementation and after, a lot of businesses will mushroom along the project road and the communities will be empowered economically. .2 Reduction in Vehicle Operating Costs Upgrading of the road will result in reduction of vehicle operating costs which constitutes the major benefit attributable to such new projects. .3 Reduction in Travel Time and Cost The project will help reduce travel time from the agricultural areas between Ntcheu and Tsangano. Passengers will now be paying less and spending less time on travel. Availability of buses and minibuses will greatly improve. .4 Road Maintenance costs With the upgrading of this road to bitumen standard, maintenance costs of the road will be reduced greatly. Currently, funds are supposed to be allocated annually to carry out grading and other maintenance works on drainage. .5 Agriculture The area where the road passes is an agricultural area for mainly Irish potatoes and maize. The upgrading of the road will ease problems of transporting farm inputs and produce to and from various markets. .6 Environmental and Health The upgrading will reduce the occurrence of dust and mud along the project area and thereby improving sanitation which means reduction in the spread of diseases which are airborne or waterborne. This will reduce the cost of medicines which would have been required to treat the people affected. The upgrading of the road will allow the communities good access to health facilities in town especially for referral cases. 2018-04-03 2019-04-03 MWK 9680744481.55
26 08/2018 Construction of Weighbridge Station at Dwangwa in Nkhata-kota
implementation
construction Construction of Weigh Bridge Station, Staff Houses and External Works To control axle load 2018-09-17 2022-06-15 MWK 650107064.02
28 RA/DEV/2019-20/12 UPGRADING OF NSANAMA-NAYUCHI ROAD (MOZAMBIQUE BORDER) -T393
implementation
construction The Nsanama-Nayuchi/Mozambique Border Road section is approximately 44 km long with very sandy soils. The road starts at Nsanama and ends at Nayuchi on the Mozambique border. It passes through two trading centres, namely Mbanila and Namanja. The scope of works under this project is the upgrading of 10km of road section from Nsanama to Nkhande Bridge towards Nayuchi.The works will include construction of a 6.7m wide carriageway and 1.5m wide sealed shoulders on each side of the road. The pavement layers will be constructed from natural gravels with 50mm Asphalt Concrete surfacing. The project will have many benefits to the people along the road and to the country as a whole. Some of the benefits will include; 1. Road Maintenance costs With the new road construction from earth to bituminous surfaced standard, the road will operate in an all-weather condition. Ultimately, emergency maintenance works during the rainy season and costs will be reduced as concentration will be on routine maintenance activities such as drainage structures cleaning, line marking, grass cutting and patching of any potholes that may develop. The road has been raised to prevent over flooding / overtopping during rainy season which will make travel safety all year round. 2 Vehicle Operating and Passenger Travel costs Vehicle operating costs savings constitute the most important benefit attributable to the project. This will have direct reduction on maintenance cost of the vehicles, reduced fuel consumption and travel time. 3 Agriculture The area where the road passes is an agricultural area for mainly sorghum. The improvement of the road will ease problems of transporting farm inputs and produce to and from various markets. 4 Employment Creation and Business Boosting The people around the area of the road project will also benefit by getting employed in various road activities by the Contractor. During project implementation and after, a lot of businesses will be enhanced along the project road and the communities will be empowered economically. 5 Inter-Border Trade It is hoped that the improvement of the road will enhance movement of goods between the two countries of Mozambique and Malawi, thereby boosting trade. 6 Reduction of travel time The construction of the road will help reduce the travel time thereby increasing the people productive time to work and businesses. 2021-04-23 2022-02-22 MWK 5361576130.35
31 KADC/DDF/2020-21/06 Construction of Iponga Guardian Shelter
implementation
construction Construction of Shelter with male and female rooms, kitchen and washing facilities This is to allow guardians give extra care for their wards/patients while receiving treatment at a Health Facility 2021-10-02 2021-12-31 MWK 14421739.50
37 BDC/IPDC/RFQ/GESD/2021-2022/02 CONSTRUCTION OF LIVIRIVI EPA OFFICE BLOCK
implementation
construction Building of Livirivi EPA office block where there is going to be a staff room, common room. to provide a better working condition 2021-11-15 2022-03-15 MWK 33935887.56
39 NNDC/GESD PROJ/21-22/01 Lot 1 Namzanga Classroom Block Construction
implementation
construction Construction of a classroom block at Namzanga Primary School To improve learning space for school 2021-07-01 2022-03-31 MWK 35000000.00
43 ZDC/NTONYA/RFQ/CDF/05/2021 Bridge Upgrading
completed
construction Upgrading of a 5 span Timber Bridge to Concrete Status on Thondwe River accessibility improvement 2021-06-21 2021-10-11 MWK 23800000.00
45 RA/DEV/2020-21/01 Rehabilitation and Widening of the (M1) Road from Kamuzu International Airport (KIA) Turn-Off to Kasungu being LOT 1 of the four LOTS comprising the entire project
implementation
rehabilitation The rehabilitation and widening of the M1 road section from the turnoff to Kamuzu International Airport (KIA) to Kasungu referred to as Section 1 (or LOT 1 of the procurement procedure) of the project. The total length of the section is 102 km. The primary economic function of the road is the long-distance transportation of import goods for Malawi from the port of Dar es Salaam. Fuel is the main product handled but the road also provides for the import of goods to the mining activities along the road corridor, and the export of agricultural products, in particular tobacco. The road is a major route from Lilongwe to the north and carries significant local traffic serving district administrative centers and trading centers along its route. The Ml through Malawi offers the shortest import/export route to Dar es Salaam for Zambia's agriculturally important Eastern Province. 2022-06-29 2024-12-15 EUR 41955796.40
46 RA/DEV/2020-21/02 Rehabilitation and Widening of the (M1) Road from Kasungu to Jenda (85.5km) being LOT 2 of the four LOTS
implementation
rehabilitation The rehabilitation and widening of the M 1 road section from Kasungu to Jenda referred to as Section 2 (or LOT 2 of the procurement procedure) of the project. The total length of the section is 85.5 km. The primary economic function of the road is the long-distance transportation of import goods for Malawi from the port of Dar es Salaam. Fuel is the main product handled but the road also provides for the import of goods to the mining activities along the road corridor, and the export of agricultural products, in particular tobacco. The road is a major route from Lilongwe to the north and carries significant local traffic serving district administrative centres and trading centers along its route. The Ml through Malawi offers the shortest import/export route to Dar es Salaam for Zambia's agriculturally important Eastern Province. Various forms of traffic make use of the project road. This includes heavy and light duty goods vehicles, buses, pickups, minibuses, passenger cars and non-motorised traffic (mainly bicycles and pedestrians). There are large volumes of non-motorised traffic, with many trading centres and towns along the route. 2022-06-29 2023-09-22 EUR 32275046.54
48 RA/DEV/2020-2021/03 Rehabilitation and Widening of the (M1) Road from Jenda to Mzimba Turn Off being LOT 3 of the four LOTS comprising the entire project
implementation
rehabilitation The rehabilitation and widening of the M1 road section from Jenda to Mzimba referred to as Section 3 (or LOT 3 of the procurement procedure) of the project. The total length of the section is 46.5 km. The primary economic function of the road is the long-distance transportation of import goods for Malawi from the port of Dar es Salaam. Fuel is the main product handled but the road also provides for the import of goods to the mining activities along the road corridor, and the export of agricultural products, in particular tobacco. The road is a major route from Lilongwe to the north and carries significant local traffic serving district administrative centers and trading centers along its route. The Ml through Malawi offers the shortest import/export route to Dar es Salaam for Zambia's agriculturally important Eastern Province. Various forms of traffic make use of the project road. This includes heavy and light duty goods vehicles, buses, pickups, minibuses, passenger cars and non-motorised traffic (mainly bicycles and pedestrians). There are large volumes of non-motorised traffic, with many trading centres and towns along the route. 2022-06-29 2023-09-29 EUR 11506175.75
47 RA/DEV/2020-2021/04 Rehabilitation and Widening of the (M1) Road from Kacheche to Chiweta being LOT 4 of the four LOTS comprising the entire project
implementation
rehabilitation The rehabilitation and widening of the M1 road section from Kacheche to Chiweta referred to as Section 4 (or LOT 4 of the procurement procedure) of the project. The total length of the section is 66.5 km. The primary economic function of the road is the long-distance transportation of import goods for Malawi from the port of Dar es Salaam. Fuel is the main product handled but the road also provides for the import of goods to the mining activities along the road corridor, and the export of agricultural products, in particular tobacco. The road is a major route from Lilongwe to the north and carries significant local traffic serving district administrative centers and trading centers along its route. The Ml through Malawi offers the shortest import/export route to Dar es Salaam for Zambia's agriculturally important Eastern Province. Various forms of traffic make use of the project road. This includes heavy and light duty goods vehicles, buses, pickups, minibuses, passenger cars and non-motorised traffic (mainly bicycles and pedestrians). There are large volumes of non-motorised traffic, with many trading centres and towns along the route. 2022-06-29 2024-06-29 EUR 31887078.30
50 ROADS/LCC/// UPGRADING OF CITY ROADS TO BITUMEN STANDARD- AREA 25C
implementation
construction Construction of Area 25C road to bitumen standard to ensure roads are safe, cleaner and less congested 2021-07-15 2022-08-17 MWK 1900000.00
55 MIM2202 Construction of Perimeter Fence
preparation
construction Project involves construction of brick walled perimeter fence at the MIM Campus ,Kanengo-Lilongwe Enhance campus security and ensure that there is a cordial coexistence between staff, students and surrounding communities 2022-10-02 2023-12-30 USN 10000.00
17 LCC/STRLIGHT/002/IPDC/03/21 Installation of Solar Powered Street Lights at Area 18 Interchange
completed
construction Installation of Solar Powered Street lights at area 18 interchange Make roads safer, cleaner and less congested 2021-07-15 2021-09-16 MWK 97689606.00
61 LUANAR/IPDC/CONSTRUCTION/001 CONSTRUCTION OF A GATEWAY ADMINISTRATION BLOCK
implementation
construction The main aim of the project is to Construct the Offices for the LUANAR The offices are to be used by the University offices 2013-08-01 2022-08-26 MWK 100000000.00
63 LUANAR/IPDC/CONSTRUCTION/002 construction of ODeL area 47 builing
completion
construction construction of offices and classrooms To widen the ODeL teaching mechanism 2022-08-12 2022-08-26 MWK 4500000000.00
66 BWB/W/21 Construction of Independent Power Plant (IPP) for Blantyre Water Board
preparation
construction The project aims to ensure provision of affordable and continuous water supply services through construction of 30MW Independent Power Plant. The project is being financed by EXIM Bank of India. To reduce water production costs, and ensure un-interrupted water supply 2023-09-30 2025-03-31 USD 72000000.00
72 BWB/W/22 Construction of New Water Source on Shire River and associated infrastructure for Blantyre Water Board
preparation
construction Construction of new intake at Mandiwa on Shire River, construction of transmission mains, construction of treatment works at Walkers Ferry and Service Reservoirs. The project is being financed by EXIM Bank of India. To increase water production capacity to keep pace with the growing demand on water in the city of Blantyre and surrounding areas, projected at 230,000 cubic meters per day by the year 2040 2023-01-01 2026-11-30 USD 78000000.00
85 MoD/W/004/2021 REHABILITATION AND MAINTENANCE OF WATER SUPPLY SYSTEM AT COBBE BARRACKS IN ZOMBA
implementation
rehabilitation REHABILITATION OF WATER SUPPLY DISTRIBUTION NETWORK, INSTALLATION OF PREPAID WATER METERS AND PLUMBING FITTINGS AT COBBE BARRACKS IN ZOMBA Improvement of water supply and reduction of non-revenue water at Cobbe Barracks 2022-04-11 2023-04-11 MWK 1677652941.40
97 ZCC Namiwawa Road Dualisation
implementation
construction Dual carriage of 800m tarmac and solar street lighting installation. Increase surface area for Trade and Reduction in heavy congestion in Central Business District. 2022-02-18 2022-08-18 MWK 1200000000.00
95 EGC 122/ICB/RFP/FY2022-23 The Rehabilitation/Modernisation Of Spillway And Intake Equipment Of Nkula B Hydropower Plant In Malawi
identification
rehabilitation CONSULTANCY SERVICES THE REFURBISHMENT & MODERNISATION OF SPILLWAY AND INTAKE EQUIPMENT OF NKULA B HYDROPOWER PLANT IN MALAWI Spillway and Intake Gates for Nkula B Power Plant were commissioned in 1979. The gates and associated equipment have outlived their useful life, leading to frequent breakdowns. As such, the equipment is due for refurbishment and modernization. 2022-11-01 2023-05-01 USD 200000.00
6 24/2019 Construction of Aquatic Complex
implementation
construction Swimming Pools and Ancillary Works To provide international swimming competition and recreation 2021-06-01 2022-08-05 MWK 8212029659.69
78 18/2020 construction of security houses for malawi police
implementation
construction houses for senior and junior staff provide housing to security officers 2022-03-21 2023-04-29 MWK 3866876304.68
111 LCC/IPDC193/03/21 REHABILITATION OF AREA 49 OLD GULLIVER ROAD
completion
rehabilitation Rehabilitation of area 49 old gulliver road 2.1km to Asphalt standard Helping to ease transportation of goods and services and facilitate and improve health and social economic growth in urban areas 2021-10-18 2022-03-18 MWK 937906142.25
114 LCC/IPDC193/03/21 UPGRADING OF AREA 25C/DZENZA ROAD
completion
construction Upgrading of area 25C dzenza to bituminous standard by dika construction and being supervised by PJK & P consulting services approximately 3.8km This development will help to ease transportation of goods and services and facilities and improve health and social-economic growth in urban areas. 2021-10-18 2022-03-18 MWK 1668599501.25
118 001/GESD/53085/10/21/701 Construction of Santhe Community Ground
implementation
construction Construction of perimeter fence, covered stand and football pitch To provide social entertainment to the community in kasungu 2021-12-01 2023-04-01 MWK 300000000.00
119 NRWB/KA Karonga Town Water Supply Project
implementation
construction Northern Region Water Board is implementing Karonga Town Water Supply Project in Karonga Town and surrounding areas. The project is financed by Arab Bank for Economic Development in Africa (BADEA), OPEC Fund for International Development (OFID) and the Malawi Government (GoM) at a total cost of MK19.5billion (USD26.7 million). The aim of the project is to contribute to the economic development of Malawi by improving the health and livelihoods of the residents of Karonga Town and surrounding areas through rehabilitation and expansion of the existing water supply system in order to provide reliable and sustainable potable water services. The number of beneficiaries will be 184,000 by year 2035. 2019-08-23 2024-10-30 USD 26700000.00
117 NRWB/NB Nkhata Bay Town Water Supply and Sanitation Project
implementation
construction Nkhata Bay Town Water Supply and Sanitation Project (NTWSSP), is being implemented by Northern Region Water Board (NRWB) and co-financed by African Development Bank (AfDB), OPEC Fund for International Development (OPEC Fund) and the Malawi Government (GoM) at a total cost of US$30.55 million (US$ 15.1 million from AfDB, US$12 million from OFID and US$3.45 million from GoM). The project will improve the health and livelihoods of the residents of Nkhata Bay Town and surrounding areas through access to potable and sustainable water supply and improved sanitation services. This will impact positively to 105,000 beneficiaries of Nkhata Bay Town and surrounding areas whose population by year 2040. The project was declared effective on 4th March 2019 having fulfilled the conditions precedent. The project completion date is 31st December 2022 with 30th June 2023 as date of last disbursement. 2019-07-01 2024-06-30 USD 30550000.00
121 KSCDF2022 Construction of Kapiri Stadium
implementation
construction Adding some structures to Kapiri community ground To enable the community ground host some local sports events 2022-06-12 2022-10-12 MWK 50000000.00
131 ZDC/GESD/DDF/W/2021/2022/2 Katsonga Girls Hostel fence
completion
construction A fence for Katsonga girls hostel for security 2022-01-01 2022-05-30 MWK 40612245.10
135 TD-OX/ZCC/21/172/LLW-MW/003 Construction and Rehabilitation of Drainage Channels in Sadzi Ward
completion
construction new drainage channels and rehabilitating old existing channels which were damaged by heavy rains cyclones To provide proper channels of water run off to minimize disasters during rainy season. 2021-10-08 2022-03-27 MWK 56281150.00
98 ZCC/ Upgrading of Mpoto road from earth to Bituminous road with asphalt finish
implementation
construction Construction of a 3.5 Kilometer road with asphalt finish, with Decongestion of traffic in Zomba City 2022-03-14 2022-07-28 MWK 1209664562.00
142 GESD/05G/1 Construction of a Chief's Conference hall and 2 VIP toilets at Msinja Headquarters
completed
construction construction of a chief's office block that has a conference hall, clerk's office and a Chief's office together with 2 VIP Toilets outside to provide a formal meeting place for the Senior Chief and his subjects 2021-11-14 2022-02-12 MWK 25500000.00
146 GESD/04G/2 Construction of an OPD block at Chitsime Health Centre
completed
construction construction of an Outpatient department office block to improve health care provision services 2022-02-16 2022-05-17 MWK 45000000.00
56 GESD/01G/1 Construction of classroom block at Phirilanjuzi Primary school
completed
construction This project involves construction of a two roomed classroom block at Phirilanjuzi Primary school in Traditional authority Masumbankhunda This project aims at reducing the high pupil to classroom ratio 2021-11-14 2022-02-12 MWK 25000000.00
136 GESD/01G/2 Construction of a Classroom block at Mwenda primary school
completed
construction Construction of a two roomed classroom block at Mwenda primary school at T/A Chadza reduction of the high pupil to classroom ratio 2022-01-20 2022-04-20 MWK 25000000.00
138 GESD/03G/4 Construction of a concrete deck foot bridge at Mbabvi foot bridge
completed
construction construction of a concrete deck foot bridge at Mbabvi river in T/A njewa to improve quality of mobility of people during rainy season 2021-11-14 2022-02-12 MWK 25000000.00
144 GESD/O6G/2 Construction of A vendor's Market shed at Namitete Market
completed
construction Construction of a vendor's market shed to provide a suitable trading place for local suppliers and consumers 2021-11-14 2022-02-12 MWK 34500000.00
147 GESD/O3G/2 Construction of a box culvert at Kasanda River
completed
construction Construction of a box culvert at Kasanda river and other associated works to improve mobility of people and vehicles during wet season 2021-11-14 2022-02-12 MWK 25859250.00
148 DDF/04D Construction of a fence and 2 VIP toilets at Kabudula Community Hospital
completed
construction construction of a fence and 2 VIP Toilets To ensure the safety of the people in the guardian shelter 2021-11-14 2022-02-12 MWK 25000000.00
149 GESD/05G/2 Construction of an office block for a Police unit at Mkoma school in T/A Chimutu
completed
construction construction of an office block and 2 VIP Toilets to make police services easily accessible to those in the area 2021-11-14 2022-02-12 MWK 25500000.00
150 LCC/IPDC/196/03/21 Construction of mtandire to Airwing Road- Lot 4
implementation
construction Construction/upgrading of 6km Road that starts from mtandire - Airwing to bituminious standard. The works are carried out by FNC/Meshos JV and are supervised by L Gravam Consulting Services. To provide ease transportation of goods and services and improve the living starndard of people aswel as promoting socio-economic growth. 2022-05-13 2022-11-09 MWK 3056571967.63
139 GESD/02G/2 Construction of a staff house at Matapila Health Centre
completed
construction construction of a staff house at Matapila Health Centre in traditional authority Mazengera to help with the accommodation of heath care personnel so as to reduce time taken to reach duty station 2022-01-12 2022-04-12 MWK 26500000.00
123 MCC/WORKS/21/07/01 LOT 3 UPGRADING OF DUNDUZU-NKHORONGO TO CHOMA TURN-OFF ROAD
implementation
construction Upgrading from earth road to bitumen standard To ease mobility challenges and spur economic developments through businesses and transportation of agricultural produce. 2022-07-15 2024-07-15 MWK 3035607394.50
154 GESD/02G/1 Construction of a staff house at Mngoni health centre
completed
construction Construction of a staff house to help with the accommodation of heath care personnel so as to reduce time taken to reach duty station 2021-11-14 2022-02-12 MWK 26500000.00
156 DDF/03D/4 Construction of a traditional court at Mpenu Headquarters T/A Mazengera
completed
construction Construction of a traditional court and two VIP Toilets to provide a proper place for traditional court cases to be heard and judged 2021-11-15 2022-02-13 MWK 25000000.00
158 MCC/W/CO/20/08/01 CONSTRUCTION OF MZUZU CITY COUNCIL CIVIC OFFICE COMPLEX
implementation
construction Construction of ground plus two storey buildings to accomodate all departments at Mzuzu City Council with conference rooms To improve office space as a motivation for staff. At the end this will be one stop centre for servicing the city. 2022-06-01 2024-06-01 MWK 12193720226.37
157 MCC/WORKS/BRG/21/07/01 LOT 2 SONDA-DUNDUZU ROAD
implementation
construction UPGRADING FROM EARTH ROAD TO BITUMEN STANDARD TO EASE MOBILITY CHALLENGES AND SPUR ECONOMIC DEVELOPMENT -BUSSINESSES AND AGRICULTURAL PRODUCE 2022-06-01 2025-06-01 MWK 5856857874.98
162 LCC/1/pw construction of kawale foot bridge under ward development fund.
completed
construction construction of kawale foot bridge under ward development fund. between kawale 1 and kawale 2 to allow people to cross the bridge safely 2022-03-18 2022-05-20 MWK 6986005.79
163 LCC/1/pw masaf culvert installation under constituency development fund
completed
construction masaf culvert installation under constituency development fund in area 49 improve drainage in lilongwe city, for easy crossing of cars and people 2022-06-04 2022-08-16 MWK 18603347.00
164 LCC/1/pw Rehabilitation of old town bus deport under roads fund Administration
completion
rehabilitation Rehabilitation of old town bus deport under roads fund Administration improving good roads access to the people in lilongwe city. 2021-10-11 2022-09-12 MWK 1024317687.25
166 LCC/1/pw lilongwe water and sanitation project under world bank
implementation
construction Lilongwe water and sanitation project under world bank, we are currently construction 1000 toilets in lilongwe city. To improve sanitation and sewage system in lilongwe city. 2021-08-14 2022-09-30 MWK 2458871970.00
167 LCC/1/pw Maintenance of Mtandire Mosque Road under ward development fund.
completed
construction Maintenance of Mtandire Mosque Road improvement of drainage in Lilongwe city 2022-07-14 2022-08-13 MWK 3499200.00
168 MoD/W/004/2021 EXTENSION OF MANGOCHI POTABLE WATER SUPPLY
implementation
expansion Mangochi water supply extension that covers Lakeshore areas from Mpondasi (Bishop's House) to Mtakataka Turn Off Supplying potable water to all lakeshore trading centres that include Namiasi, Maldeco, Makawa, Mtakataka Turn-Off and all Holiday resorts along the lake 2021-02-01 2023-04-11 USD 14400000.00
169 ZCC/GOV/RD/ENG/2021-22/23 Upgrading of Sadzi Sadzi THA Road to Last Night
implementation
construction Upgrading 1.8 km to asphalt finishes Provide access to traders and reduce stray of water run off into households. 2021-12-18 2022-05-17 MWK 801611277.75
171 MoD/W/004/2021 FEASIBILITY STUDIES AND DETAILED DESIGNS FOR AN ADDITIONAL WATER SOURCE FOR ZOMBA CITY AND SURROUNDING AREAS
identification
replacement Carrying out feasibility studies and detailed designs for an additional water source for Zomba City and surrounding areas To have an alternative source of water for Zomba City and surrounding areas 2021-02-01 2023-04-11 USD 1193566.20
100 13/2019 Construction of Inkosi ya Makosi M'mbelwa University
preparation
construction A learning and teaching facility provide a learning facility to the nation 2016-08-22 2023-08-21 MWK 53208000000.00
172 32 Construction of mkwakwata police post
preparation
construction Construction of mkwakwata police post To add public infrastructure 2022-08-01 2022-08-10 MWK 888888888888.88
12 17/2017 Construction of Blantyre Police
implementation
construction Construction of Police offices and Associated Works To improve security services to the nation 2019-04-15 2022-12-15 MWK 533907504.13
145 44 Construction of mkanga concrete deck bridge,single span 8m long
preparation
construction Construction of mkanga concrete deck brigde,single span 8m long To ease transportation challenges and accessibility to markets,school and hospital 2022-08-03 2022-08-16 MWK 150659580000.00
176 CKDC/GESD/NCB/2021-22/03 Construction of Kanzimbi health post
completed
construction Health facility good health for community 2021-12-09 2022-03-31 MWK 414571.35
177 TD-OX/ZCC/21/172/LLW-MW/007/A Construction of Single Lane Bridge along Likangala River
implementation
construction Single Concrete Deck Bridge The Bridge has been constructed along as part of evacuation route reaching Multipurpose Evacuation Centre in Chambo ward 2021-10-08 2022-03-27 MWK 75573550.00
178 001 maintenance of EPA hall
implementation
construction maintenance of EPA hall To maintain EPA hall 2022-08-01 2022-08-17 MWK 999999999999.99
179 DDF/01D/2 Construction of a Classroom block at Kakolo Primary school
completed
construction Construction of a two roomed classroom block to reduce the high pupil to classroom ratio 2021-12-29 2022-03-29 MWK 25000000.00
180 34 Lingoni Primary School
completion
construction Construction of 1 two roomed classroom block at T.A. Mposa Machinga South Constituency Chamba Ward To increase the number of classroom blocks at the institution thereby increasing pupil classroom ratio 2021-09-04 2022-03-23 MWK 26000000.00
70 MBS/IPC/BE495/2013 Development of a Robust Standardization, Quality Assurance, Accreditation and Metrology (SQAM) Infrastructure in Malawi
implementation
construction Construction of Office and Laboratory Complex To build capacity in regulating requirements of the Malawi Bureau of Standards (MBS) by improving testing requirements and thereby contribute to the improvement of export trade, economic improvement and welfare of Malawians 2016-02-01 2018-01-31 MWK 18690052500.00
181 MBS/SWE/SH/01 CONSTRUCTION OF STAFF HOUSES AT SONGWE
identification
construction CONSTRUCTION OF THREE TWO-BEDROOM STAFF HOUSES AT SONGWE TO ACCOMODATE MBS STAFF WORKING AT SONGWE BORDER 2022-12-01 2023-06-30 MWK 200000000.00
38 MJDC-IPDC-20/21-DDF-W-3-DDF Construction of Nthiramanja Police Unit
completed
construction Construction of a police Unit, with two holding cells, with Substation's office to improve security 2021-06-01 2021-08-31 MWK 50000.00
184 CC/ADM/01/CW/12/2020 Expansion of Chancellor College Construction of Administration Office Block
implementation
expansion Construction of administration block The purpose is to enhance quality and efficiency in the University of Malawi 2021-08-20 2023-08-21 MWK 8961824573.92
185 06 Mkazimasika 4 bridge construction
completion
construction Bridge construction contract ref no 091/MHG/CDF/Machinga South East/Mkazimasika 4 bridge/06/2021 To ease accessibility to markets,hospital and school 2021-06-25 2021-08-20 MWK 4979400.00
165 LCC/1/pw Upgrading of penyenye to mtaya road via mtsinje under government fund.
implementation
construction Upgrading of penyenye to mtaya road via mtsinje under government fund. Improving road network in lilongwe city 2021-12-03 2022-09-12 MWK 3500000000.00
187 DDF2021 Kawere Fish Ponds
implementation
construction Construction of 20 No fish Ponds and associated works which include Solar powere borehole Fencing, lighting at T/A Kawere in Mchinji District Fish farming promotion in Mchinji Dkistrioct 2022-01-16 2022-04-30 MWK 48346667.50
188 ZCC/RF/RD/ENG/2021-22/06 Upgrading of Sogoja Road in Zomba City
implementation
construction 3km Road with 200mm crush run, asphalt 35mm compacted Thickness, drainage both sides, supply, delivery and installation of streetlights and concrete poles. To increase city revenue base so as to ensure service delivery is absolute provided. 2022-03-30 2022-09-26 MWK 1376931486.00
189 MJDC-IPDC-21/22-W-6-GESD Construction of Access Roads at Mulanje New Lines
completed
construction Construction of Access Roads at Mulanje New Lines in Mulanje Central Constituency to improve urban housing development to achieve the councils reform strategy 2022-01-17 2022-04-20 MWK 53325000.00
191 MUBAS/PSIP/RFP/02/2022 Construction Of MUBAS Administration, Research, Teaching And Learning Complex And Associated External Works
preparation
construction Construction Of MUBAS Administration, Research, Teaching And Learning Complex And Associated External Works To construct a MUBAS Administration block, Research, Teaching And Learning Complex And Associated External Works 2022-06-25 2027-06-14 MWK 80000000000.00
193 MUBAS/PSIP/SCIENCEBLOCKREHAB/2022 Rehabilitation of the Science Block
preparation
rehabilitation Rehabilitation of the Science Block To rehabilitate the science block which houses key laboratories for physics, chemistry, biology and electrical engineering. 2023-01-02 2023-03-31 MWK 1200000000.00
195 MJDC-IPDC-21/22-W-2-GESD Rehabilitation of Tchelekere Irrigation Scheme
implementation
rehabilitation Rehabilitation of Tchelekere Irrigation Scheme in Mulanje-Limbuli Constituency to improve food security 2022-01-17 2022-04-20 MWK 50000000.00
196 MJDC-IPDC-21/22-W-5-GESD Rehabilitation of Mulanje District Hospital paying ward
completed
rehabilitation Rehabilitation of a paying ward to improve health service delivery 2021-12-21 2022-03-21 MWK 7000000.00
198 MJDC-IPDC-21/22-W-4-GESD Construction of Ndanga maternity Wing
completed
construction Construction of Ndanga Maternity Wing to improve maternal health 2021-12-21 2022-04-26 MWK 80000000.00
44 RA/DEV/2020-21/06 THE CAPACITY IMPROVEMENT OF THE KENYATTA ROAD TO MULTI CARRIAGEWAY (6 LANES)
implementation
expansion Pursuant to the Malawi Growth and Development Strategy (MGDS III), 2018 and the Transport Master Plan, 2018, the Malawi Vision 2063, 2021 which are recent policy documents that articulates issues related to both economic growth and development in the Transport Sector, the Government of the Republic of Malawi is expanding the Kenyatta road from a single carriageway to a multi carriageway (6 lanes) in the City of Lilongwe. Reduction in Travel Time Once the project is completed it will reduce travel time between Lilongwe Old Town and City Centre. Currently it takes about 1 hour to travel between the two places and the journey would take less than 10 minutes. Reduction in vehicle Operating Costs Due to reduced travel time, vehicle operating costs would be greatly reduced in terms of wear and tear and usage of fuel. Enhanced Road Safety for all road users With the introduction of a dedicated lane for cyclists and a separate pedestrian walkway road safety for all road users will be enhanced and will result in the reduction of accidents between motorised and non-motorised traffic. Direct employment during construction Many people will be employed during the implementation of the project. 2021-09-15 2023-03-15 MWK 19042052151.71
200 RA/DEV/2020-21/05 Capacity Improvement of Mzimba Street
implementation
expansion Expanding the capacity of the Mzimba Street from two to four lanes . The works will also include construction of a partial Cloverleaf Interchange replacing the current roundabout at Kamuzu Central Hospital/ Petroda Filling Station. Then the expansion works will proceed to Lilongwe Bridge, just after passing the Kamuzu Central Hospital and Central Medical Stores Trust. Reduction in Travel Time 2022-04-01 2023-03-27 MWK 9878866404.25
201 RA/M7/U51 Upgrading of Ntchisi - Malomo road
implementation
construction The Ntchisi - Malomo (M7/UD51) road project starts from Malomo Trading Centre where the first 3kilometers of the road was upgraded from earth to bitumen standard under Maintenance Programme of Roads the Authority. The road goes southward passing through a gentle terrain towards Ntchisi town in Ntchisi district. UPGRADING OF A 10 KM SECTION ON NTCHISI – MALOMO (M7/UD51) ROAD. The project will have many benefits to the people along the road and to the country as a whole. 2021-08-01 2022-05-02 MWK 4173351450.99
202 RA (T378) UPGRADING OF A 10 KM SECTION ON MONKEY BAY – CAPE MACLEAR (T378) ROAD
implementation
expansion The Monkey Bay Cape Maclear (T378) road starts at Cape Maclear junction on the Monkey Bay road and continues west-northward passing through mountainous areas to Cape Maclear Tourist area and Lake Malawi National park in Mangochi district. Vehicle operating costs savings constitute the most important benefit attributable to the project. This will have direct reduction on maintenance cost of the vehicles, reduced fuel consumption and travel time. 2021-11-01 2022-07-31 MWK 3563898954.27
203 RA/DEV/ Dedza One Stop Border Post
completion
construction The project involves construction of a new border facility at Dedza. The following facilities will be constructed at the new Dedza border facility; Main Passenger terminal and Port health building, Office Block for MRA, MBS and other agencies, Bus inspection shed, warehouse, Scanner shed, Voltage regulator room for scanner equipment, Animal and plant/ Agriculture products clearance building, Cargo Inspection shed, Transformer and electrical equipment house, Generator house, Solar equipment house, Gate houses, parking areas and roads and Permanent fence The construction of the border will lead to an improvement in the processing of imports and exports at the border crossing between Malawi and Mozambique which will see a reduction in truck and passenger wait time at the border once the facility becomes a One Stop Border Post. 2021-03-07 2022-03-07 USD 9569684.58
204 RA/DEV/2 Mwanza One Stop Border Post
implementation
construction The project is located at the border with Mozambique in Mwanza. The works involve expansion of the existing border facility at Mwanza Border Post by constructing the following additional structures; main Passenger terminal and Port health building, Office Block for MRA, MBS and other agencies, Bus parking and inspection shed, New electrical and transformer room, Generator room, Parking areas, access roads and perimeter fence. The construction of the border will lead to an improvement in the processing of imports and exports at the border crossing between Malawi and Mozambique which will see a reduction in truck and passenger wait time at the border once the facility becomes a One Stop Border Post. 2021-03-07 2022-07-31 MWK 3178360156.45
205 RA/DEV/2018-19/04 B. UPGRADING OF MZIMBA-MZARANGWE ROAD
implementation
construction The current project involves upgrading 45 Km of the road which include 15.4Km of the M022 road section from Mzimba Boma (M009/M022 Junction) to the M022/M001 Junction and 30Km section of the S107 from Mtangatanga Turn Off (M022/S107 junction) up to Mtantha trading center. The two road sections will be upgraded from earth to bitumen. The project will have many benefits to the people along the road and to the country as a whole. Some of the benefits will include; 6.1 Shorter Route The road will provide a shorter route for travellers between Lilongwe and Mzuzu who would like to pass through Mzimba Boma. 6.2 Road Maintenance costs With the upgrading of this road to bitumen standard, road maintenance costs will be greatly reduced greatly. 6.3 Vehicle Operating and Passenger Travel costs Vehicle operating costs savings constitute the most important benefit attributable to the project. This will have direct reduction on maintenance cost of the vehicles, reduced fuel consumption and travel time. Passengers will now be paying less and spending less time on travel. Availability of buses and minibuses will greatly improve transportation of passengers. 6.4 Agriculture The area where the road passes is an agricultural area for mainly tobacco, maize and groundnuts. The upgrading of the road will ease problems of transporting farm inputs and produce to and from various markets. 6.5 Environmental and Health The upgrading will reduce the occurrence of dust and mud along the project area and thereby improving sanitation that means reduction in the spread of diseases, which are airborne or waterborne. This will reduce the cost of medicines, which would have been required to treat the people affected. The upgrading of the road will allow the communities good access to health facilities in town especially for referral cases. 6.6 Employment Creation and Business Boosting The people around the area of the road project will also benefit by being employed in various road activities by the Contractor. During project implementation and after, many businesses will mushroom along the project road and the communities will be empowered economically. 2019-04-11 2022-06-09 MWK 10959872880.03
206 002 Construction of market shed at Mulipa market shed in Machinga Central East
implementation
construction Construction of market shed with concrete benches To ease space for vendors to display their merchandise 2022-07-28 2022-08-30 MWK 36852450.00
215 NOCMA/ICB/S/MECHANICAL/2021/1 DESIGN AND INSTALLATION OF FUEL TANKS
preparation
expansion Tanks provide storage of product at strategic fuel reserves according to the recommended storage amounts set in line with SADC requirements To construct additional tanks at Mzuzu, Lilongwe and Blantyre to increase fuel storage capacity 2022-09-22 2024-04-30 MWK 18000000000.00
170 ZCC/GOV/RD/ENG/2021-22/02 Upgrading of Namiwawa Road Extension
implementation
rehabilitation Rehabilitation and upgrading of Namiwawa road, and expansion of the carriage to include pedestrian walkways, and drainage structures. Provision of access to traders, and citizenry. 2022-05-30 2022-09-26 MWK 1250107327.50
218 RA/DEV CAPACITY IMPROVEMENT OF CROSSROADS ROUNDABOUT TO KANENGO ROAD PROJECT
preparation
expansion The Government of Malawi signed a grant agreement for the capacity improvement of part of the M1 road from Cross roads round about up to Kanengo junction with Chendawaka which is 10 kilometers long. The road will be constructed to dual carriageway. Each lane will be 3.4m wide with a cycle track of 1.5 and a pedestrian track of 1.5m. Street lighting will be in the middle of the road in the 1500 mm wide median arching in two directions. Reduction of Traffic Congestion is expected upon completion of the project. The road will complement the capacity of the interchange 2020-12-28 2023-12-27 CNY 177250000.00
225 LCC/CDF/11/21/BOREHOLES/LLCW DRILLING OF EIGHT BOREHOLES IN LILONGWE CITY WEST CONSTITUENCY
completed
construction Drilling of eight boreholes in lilongwe city west constituency Providing safe water to the community and easy accessibility of water to the community. 2022-06-22 2022-11-24 MWK 29028616.48
226 LCC/CDF/08/22/BOREHOLES/LLCSW DRILLING OF SIX BOREHOLES IN LILONGWE CITY SOUTH WEST UNDER CDF
completed
construction Drilling of six boreholes in lilongwe south west Providing safe water and easy accessibility of safe water to the community 2022-11-30 2023-01-29 MWK 26600673.00
51 LCC/IPDC044/08/21 Draiange Improvement on katete-Dimba Road in area 24-Lot 3
completed
construction Improvement of Dranage on katete-Dimba in are 24 Drainage improvement in the city 2022-04-27 2022-08-24 MWK 59712883.13
152 LCC/WDF/04/22/DRAINAGE/KABWABWA Construction of drainage in kabwabwa ward under ward development fund in lilongwe city centre constituency s
completed
construction Drainage improvement in kabwabwa ward mainly involve installation of 900 and 600mm culvert rings Improve drainage system 2022-06-30 2022-08-31 MWK 1868951.25
54 LCC/CDF-LLCity west CONSTRUCTION OF BOX CULVERT AT MSAMBETA SCHOOL IN STATEHOUSE WARD UNDER CDF PROJECT
completed
construction CONSTRUCTION OF BOX CULVERT AT MSAMBETA SCHOOL IN STATEHOUSE WARD UNDER CDF PROJECT Drainage improvement in the city 2022-04-27 2022-07-25 MWK 23009787.50
76 LCC/CDF/11/21/BOREHOLES/LLCW DRILLING OF EIGHT BOREHOLES IN LILONGWE CITY WEST WARD UNDER CDF PROJECT
completed
construction Drilling of eight boreholes in lilongwe city west ward under CPF project Improving peoples health by supplying portable water to the community at a cheaper price, which will be readily available at the point of need. 2022-07-29 2022-10-27 MWK 29028616.48
77 LCC/IPDC/193/03/21(Lot 1a Kauma) UPGRADING/REHABILITATION OF SELECTED LILONGWE CITY ROADS AT AREA 12- KAUMA
completed
rehabilitation Rehabilitation of roads in area 12 (Mwambo road) and Kauma Improve Transportation 2021-10-18 2022-03-17 MWK 1328175946.35
73 LCC/CDF/01/22/ZION BRIDGE/ CHINSAPO 1 CONSTRUCTION OF BOX CULVERT AT ZION BRIDGE IN CHINSAPO 1 UNDER CONSTITUENCY DEVELOPMENT FUND (CDF) IN LILONGWE CITY WEST CONSTITUENCY
completed
construction A box culvert is being constructed at Zion Drainage improvement 2022-06-20 2022-09-18 MWK 18499590.00
115 NRWB/MNWEP Malawi NRWB Water Efficiency Project- Mzuzu, Ekwendeni and Chintheche
implementation
construction The Northern Region Water Board (NRWB) is implementing the Malawi NRWB Water Efficiency Project in Mzuzu City, Ekwendeni Town and Chintheche Town. The project is financed by the European Investment Bank (EIB) at an estimated cost of MK19.6 billion (€24.6million). The aim of the project is to contribute to the economic development of Malawi by improving the health and livelihoods of the residents of Mzuzu City, Chintheche Town and Ekwendeni Town through rehabilitation and expansion of the existing water supply systems in order to provide reliable and sustainable potable water services by increasing capacity of Ekwendeni treatment and by increasing storage capacity in Mzuzu City. The project will in addition roll out prepaid water meters and implement water demand management strategies to control water loss. The project will impact positively 55,400 beneficiaries in Ekwendeni, 21,300 in Chintheche and 345,450 beneficiaries in Mzuzu City by year 2035. 2017-07-04 2024-04-30 EUR 24600000.00
133 ZDC/GESD/DDF/W/2021/2022/3 Nasawa police unit
completed
construction Police unit fully constructed and handed over to community for security 2022-01-01 2022-04-30 MWK 59909205.75
214 NOCMA/NCB/W/BT/2018/1 CONSTRUCTION AND INSTALLATION OF RAIL SIDING PUMP HOUSE AND ASSOCIATED EQUIPMENT AT LILONGWE AND BLANTYRE DEPOTS
implementation
construction Construction of Rail Siding facility at Blantyre Depot located at Matindi area and Lilongwe depot located at Area 51 Construction of Rail Siding facility at Lilongwe and Blantyre Depots to enable NOCMA to offload product using Rail wagons 2018-12-31 2022-11-15 MWK 4012176750.50
8 MW-LWSP-26088-CS-QCBS LILONGWE WATER AND SANITATION PROJECT (LWSP)
implementation
construction The project scope consists of four components: 1-water distribution network rehabilitation and expansion and Non-Revenue Water reduction; 2-Priority sanitation improvements; 3-Technical assistance; 4-Institutional capacity strengthening. The project is to increase access to improved water services and safely managed sanitation. It is expected the project will benefit half a million residents in Lilongwe city. 2018-03-26 2024-12-30 USD 147500000.00
60 MW/SADC/GESD/60601 MNEMA HEALTH CENTRE
completion
construction Construction of Maternity block, Incinerator and Ash pit, Water supply system The project is trying to address issues of maternal deaths hence reduce mortality rate in the locality. 2022-01-21 2022-04-30 MWK 134921676.11
132 ZDC/GESD/DDF/W/2021/2022/4 Namadidi health post
completed
construction health post for Namadidi community to provide health services to the people of the community 2022-01-01 2022-03-31 MWK 43256987.94
74 LCC/CDF/02/22/ROOF REPAIR/KAUMA SCHOOL ROOF REPAIR AT KAUMA SCHOOL UNDER CONSTITUENCY DEVELOPMENT FUND IN LILONGWE CITY CENTRE CONSTITUENCY
completed
rehabilitation Repairing roof of a school block Improve learning conditions for students 2022-06-02 2022-08-01 MWK 4022745.00
155 LCC/CDF/04/22/CONCRETE BRIDGE/CHATATA WARD Construction of concrete bridge in chatata-ngona ward under CDF in lilongwe City centre constituency-first phase
completed
construction Construction of 30m 2 span concrete bridge in chatata ward by infra dev contractors Ease transportation of goods and services 2022-08-26 2022-10-27 MWK 43555600.00
159 LCC/IPDC/06/22/MAINTENANCE/COLLAPSED FENCE/LUMBADZI MARKET Construction of collapsed brick fence at lumbazi marker under local revenue
completed
rehabilitation Construction of collapsed brick fence at lumbazi marker under local revenue Improve safety in the market place 2022-08-26 2022-10-27 MWK 2813562.50
160 LCC/1/ construction of box culvert at Chankhandwe under constituency development fund
completed
construction Construction of Box culvert at Chankhandwe improvement of road infrastructure in the city for easy access to students, women and the residents of Chinsapo and Bwemba areas 2022-03-21 2022-07-21 MWK 17748200.03
33 KADC/DDF/W/2020-2021/01 - LOT 1 Construction of Staff House at Mwenilondo Health Centre
completed
construction The works involve construction of a 3 bed room house with flush toilet, kitchen and stores apartments The purpose is to provide housing accommodation to Health Worker working at the Health facility. 2021-10-15 2022-01-13 MWK 2194735050.00
129 001 Construction of Staff Houses at Nthalire Health Centre
completed
construction Two staff houses were constructed at Nthalire Health Centre with GESD funds To improve the housing condition of health staff 2021-12-22 2022-03-31 MWK 40000000.00
126 DDF001 REHABILITATION OF DC'S OFFICE
completed
rehabilitation GENERAL MAINTENANCE WORK IMPROVE WORKPLANCE ENVIRONMENT 2022-07-18 2022-09-01 MWK 35000000.00
127 KADC/DDF/GESD/NYUNGWE ADC OFFICE/2021-22/003 Nyungwe ADC Office
completed
construction Construction of One office block and one double VIP toilet Provide conducive environment for planning and reviewing development project 2022-01-28 2022-04-28 MWK 18892292.00
128 GESD001 LIVINGSTONIA POLICE UNIT AND ASSOCIATED WORKS
completed
construction CONSTRUCTION WORKS OF POLICE UNIT AND DOUBLE LATRINE TOILET ENHANCEMENT OF SECURITY MEASURES 2021-12-16 2022-06-30 MWK 42920821.13
194 MJDC-IPDC-21/22-W-3-GESD Construction of market Toilets
completed
construction Construction of 2 holes market toilets at various markets in Mulanje to improve sanitation in the markets 2022-01-17 2022-04-20 MWK 26093166.75
71 P178914 Malawi Emergency Power Restoration Project
implementation
rehabilitation Restoration of the damaged infrastructure affected by Tropical Storm Ana including both transmission (132kV & 66kV) and distribution (33kV, 11kV and 400V lines) networks where a number of power line components have been affected. These include steel towers, wooden poles and structures, transformers, conductors and insulators among others. The project will help productive and efficient income-generating activities (less time spent on fetching traditional sources of energy and clean water) and enhanced access to information/communication (through phone, radio, television, and so on). The project will also improve quality of public service delivery through both existing connections and increased electricity connections, especially of public facilities such as schools and health centers. 2022-10-14 2024-10-15 USD 15300000.00
93 C87-10-18 Expansion of Chancellor College School of Economics
completed
expansion construction of school of economics To enhance quality of economic graduates while and increasing access to University education 2019-07-01 2022-08-21 MWK 3554802243.07
83 P178914 Malawi Energy Power Restoration Project: Kapichira Dam Rehabilitation and Strengthening
implementation
rehabilitation Malawi Energy Restoration Project is an emergency project that is aimed at rehabilitating the Kapichira dam to enable power generation. The Malawi Government with loan of $44.4 million from the World Bank intents to implement this project as a matter of emergency. The project aims to restore power generation at Kapichira Powerstation. Kapichira Dam was destroyed by Cycle Ana during the January 2022 floods 2022-07-01 2027-06-16 USD 44400000.00
94 BDC/RFQ/IPDC/GESD/2021-2022/03 SEMI-DETTACHED COMMERCIAL SHOPS
completed
construction CONSTRUCTION OF SEMI-DETTACHED COMMERCIAL SHOPS IMPROVING REVENUE GENERATION 2021-12-13 2022-03-30 MWK 21505036.35
88 ZADC/GESD/DDF/W/2021/2022/1 Chanda Health Post
completed
construction Construction of a Health Post at Chanda To provide Health Services to the community. 2022-02-01 2022-05-30 MWK 49322206.40
91 BDC/RFQ/IPDC/GESD/2021-2022/04 CHIDZANJA MARKET SLAUGHTER HOUSE
completed
construction CONSTRUCTION OF SLAUGHTER HOUSE AND A VIP PIT LATRINE IMPROVING REVENUE GENERATION 2021-12-13 2022-03-30 MWK 15826942.95
40 ea83b5f1 CONTRUCTION OF NDAKWERA CDSS CLASSROOM BLOCK
completed
construction CONSTRUCTION OF NDAKWERA CDSS CLASSROOM BLOCK IMPROVE QUALITY EDUCATION SERVICE DELIVERY 2022-03-03 2022-06-01 MWK 32011425.00
197 MJDC-IPDC-21/22-W-1-GESD Construction of Chimwamesi Bridge
implementation
construction Construction of Chimwamesi Bridge to ease mobility challenges 2021-12-21 2022-05-22 MWK 65000000.00
84 BDC/RFQ/IPDC/GESD/2021-2022/05 KACHENGA MARKET SHED
completed
construction CONSTRUCTION OF MARKET SHED IMPROVING REVENUE COLLECTION THROUGH SAFE AND GOOD MARKETING INFRASTRUCTURE 2021-12-13 2022-03-30 MWK 16251564.00
141 74fdbc11 Constrution of Nkhate health post
completed
construction construction of Nkhate health post Improve quality primary health care service delivery 2021-02-01 2022-02-01 MWK 32861212.50
140 7b5460c6 Construction of Nambesa primary school
completed
construction construction of Nambesa primary school, class block. Improve quality education service delivery 2021-06-01 2022-03-15 MWK 32813039.81
80 BDC/RFQ/IPDC/GESD/2021-2022/06 MBERA RESOURCE CENTRE
completed
construction CONSTRUCTION OF MBERA RESOUCE CENTRE CLASS ROOM BLOCK AND 2 VIP PITLATRINE TOILETS IMPROVING ACCESS TO INFORMATION 2021-12-13 2022-03-30 MWK 27931635.00
81 BDC/RFQ/IPDC/GESD/2021-2022/01 CHIMATIRO MATERNITY WING
completion
construction CONSTRUCTION OF CHIMATIRO MATERNITY WING, SEPTIC TANK, PLACENTA PIT AND WATER TANK IMPROVING ACCESS TO MATERNAL HEALTH 2021-12-13 2022-04-30 MWK 44155453.17
99 NCB-MUST-S-2022/23-160 Extension and Alteration of the Teaching Hospital at Malawi University of Science and Technology (MUST)
implementation
expansion The proposed works shall include the construction of a three-storey structure to match the existing number of floors for the existing building, purposefully designed to work and function as a hospital, with special consideration to all technical requirement for a Hospital Building to make sure it is accessible by all groups of people regardless of their physical ability. Ideally, the teaching hospital extension shall be used for the following purposes but not limited to the same, as such the consultant shall do their own research to enhance a functional approach for the facility. The floor matrix combination is that one desired by the client as annotated by Ground floor (GF), First floor (FF) and Second Floor SF). If, however, there is a strong design challenge to the preferred floor matrix as proposed by the client, the consultant shall liaise with the client and propose an alternative combination. -Restore the University’s facilities outlook -Operationalise the teaching hospital as learning facility -offer specialized critical medical care to the public - Increase income generating capacity for the University -Reduce medical tourism for specialized medical services 2022-07-01 2025-06-30 MWK 4500000000.00
134 WORLDBANK/SAVE/MUST/LT/2022 Construction of a 500 Seater Lecture Threatre
implementation
construction A single Building with two large rooms each with a seating capacity of at least 250 students which will be used for teaching and learning and conferencing for larger groups of students and other stakeholders. The Lecture theatre design will be based on that of the auditorium, designed for an audience and performer relationship, providing students/spectators with excellent visibility of the main stage or platform. The lecture theatres shall be installed with tiered seating, enabling those sitting right at the back to be able to see and hear what is happening at the front. The Lecture Theatres shall be used for the following Purposes i. Teaching and presenting ii. Performances iii. Staff meetings iv. Drama classes v. Interactive learning and discussion 2022-07-01 2025-06-19 USD 2650000.00
96 NCB-MUST-W-2020/21-130 Construction of a Mini-Industrial Park
implementation
construction The Malawi University of Science and Technology received an equipment grant from the Chinese Government and the African development Bank (ADB); part of the equipment from ADB had been delivered while the University awaits delivery of the equipment from China in the course of the year. The University intends to apply some of the equipment towards the processing of: water, dairy, leather and ceramic products for training and income generating activities. It is imperative for the University to have necessary infrastructure ready to accommodate the equipment. The Mini-Industrial Park project is designed for this purpose on top of being a Teaching and Learning, research and Development and Income generating facility for the University -Improve students’ practical experience -Increase income generating capacity for the University -Facilitate research and Development for Malawi -Accelerate innovative productive development for Malawi 2021-03-25 2022-12-24 MWK 938601057.01
82 NCB-MUST-W-2021/22-135 Construction of a Purpose Built Science Laboratory Complex
implementation
construction The Purpose Built Science Laboratory is one of the Major Projects for the Malawi University of Science and Technology, at a construction cost of MK 14.3 Billion, it is a flagship project for the University meant to accommodate all Laboratory, workshop, research, teaching and Diagnostic needs for the University. This projects complements the University's status as a Science and Technology University, a cornerstone for the Very existence of MUST. -Facilitate quality Teaching and Learning for the MUST -Enhance vital medical research for the Country -Increase brand visibility and footprint for MUST at regional level - Increase income generating capacity for the University 1922-06-18 2025-06-17 MWK 14298344928.00
213 BTDC/BT/CDF/338/2022 Chaweta primary school electrical installation
completed
construction installation of electricity in classrooms and staff houses improve service delivery 2022-07-22 2022-09-22 MWK 18000000.00
211 W/DDF/NORTH/05/2022 Kamwiri health post
implementation
construction construction of health post improve health services 2022-07-15 2021-09-30 MWK 18000000.00
124 KADC/DDF/GESD/MUKOLE CL/2021-22/002 MUKOLE JUNIOR PRIMARY SCHOOL
completed
construction Construction of one double classroom block, one double VIP toilet and procurement of desks Provide conducive teaching and learning environment for both teachers and learners 2022-01-28 2022-04-28 MWK 30000000.00
137 P158805 Shire Valley Transformation Programme-1 (Construction of the Intake and First 6km of the Main Canal)
implementation
construction Construction of the intake at Kapichira Dam and the first 6kms of the main canal Promotion of irrigation services to smallholder farmers and other farmers in the Shire Valley. 43,370 hectares to be irrigated through the project. 2020-04-13 2024-09-30 USD 31679094.92
25 RA/DEV/2019-20/10 Upgrading of Kapiri - Mkanda
implementation
construction This project involves the construction to bitumen standard of approximately 10km of road section from Mkanda towards Kapiri. The Road will be upgraded to an all-weather bitumen standard road with a cross section of 6.8m carriageway and 1.5m shoulders with an asphalt concrete surfacing. The project will have many benefits to the people of Mkanda and Kapiri. Some of the benefits will include; 1. Reduction of Travel Time The road upgrade will greatly reduce the travel time of road users in the surrounding community. 2. Maintenance costs With the new construction from gravel to bituminous surfaced standard, the road will operate in an all-weather condition. Ultimately, emergency maintenance works during the rainy season and costs will be reduced as concentration will be on routine maintenance activities such as drainage structures cleaning, line marking, grass cutting and patching of any potholes that may occur. 3. Vehicle Operating and Passenger Travel costs Vehicle operating costs savings constitute the most important benefit attributable to the project. This will have direct reduction on maintenance cost of the vehicles, reduced fuel consumption and travel time. Passengers will now be paying less and spending less time on travel. Availability of buses and minibuses will greatly improve. 4. Agriculture The area where the road passes is an agricultural area for mainly tobacco, maize, beans, potatoes and groundnuts. The upgrading of the road will ease problems of transporting farm inputs and produce to and from various markets. . 5. Employment Creation and Business Boosting The people around the area of the road project will also benefit by getting employed in various road activities by the Contractor. During project implementation and after, a lot of businesses will be enhanced along the project road and the communities will be empowered 6. Environmental and Health The upgrading will reduce the occurrence of dust and mud along the project area and thereby improving sanitation which means reduction in the spread of diseases which are airborne or waterborne. This will reduce the cost of medicines which would have been required to treat the people affected. The upgrading of the road will allow the communities good access to health facilities in town. 2021-08-01 2022-04-28 MWK 4300016478.58
75 LCC/IPDC/09/07/2021 REHABILITATION OF MCHESI TO AREA 23 MARKET ROAD IN LILONGWE CITY (LOT6)
completed
rehabilitation Rehabilitation of existing road Transportation improvement 2022-03-14 2022-08-11 MWK 1631348669.84
113 TD-OX/ZCC/21/172/LLW-MW/006 Installation of Gabion Baskets along Likangala River
implementation
construction Prepare and Install gabions baskets along Likangala river in selected critical points. Reduce eroding of river banks and maintain river course so as flooding is minimized. 2021-10-18 2022-03-27 MWK 240945300.00
112 TD-OX/ZCC/21/172/LLW-MW/005 Construction of 2 Evacuation Centres in Likangala and Chambo Wards
completed
construction Multipurpose Evacuation Centers Accommodate displaced flood victims usually occur along Likangala River 2021-10-25 2022-04-27 MWK 139440574.20
79 11/2020 Construction of houses for security institutions
implementation
construction houses for IPYANA and songwe in karonga,malaya pmf camp in mangochi,mwanza and neno police station,area 30 in lilongwe,mvera in dowa,mzuzu,immigration headquarters lilongwe provide housing for security officers 2020-11-30 2022-12-24 MWK 12675679000.00
102 05/2019 construction of new premises for the "C" division of malawi police service
preparation
construction office space and work stations provide better office space for the officers 2019-05-17 2025-05-18 MWK 11075200000.00
173 37ad3c5e Dulansanje teachers house
completed
construction Construction of Dulansanje teachers house Improved quality education service delivery 2021-07-01 2022-03-31 MWK 29000000.00
183 MJDC-IPDC-2020/2021-W-1-DDF Construction of a School Block at Nkuta CDSS
completed
construction Construction of a two-classroom school block at Nkuta Community Day Secondary School To improve Education standards in the district 2021-06-01 2021-08-31 MWK 40000000.00
182 MJDC-IPDC-2020/2021-W-2-DDF Construction of a School Block at Waluma CDSS
completed
construction Construction of a Two-Classroom school block at Waluma Community Day Secondary School. To improve Education Standards in the District 2021-06-01 2021-08-31 MWK 40000000.00
89 08/2017 construction of mponera community hospital
implementation
construction In dowa district provide a healthy institution to the community 2019-05-27 2022-05-27 MWK 7953522080.13
90 51/2015 Construction of National Indoor sports stadium complex
implementation
construction Indoor sports complex,Area 48 next to Bingu National stadium in Lilongwe. provide sporting facility to the community 2021-01-04 2022-09-26 MWK 7770430405.57
101 07-2022 Construction of Capital Hill Clinic
implementation
construction Associated External works at capital hill To help people in an area to provide health facility' 2022-07-18 2023-01-23 MWK 970127330.14
103 07-2022 Construction of security staff houses for police services
implementation
construction staff houses for police services in Lilongwe city for better living of standard 2022-12-07 2023-01-23 MWK 999679166196.60
104 03/2022 construction of staff houses for malawi police
implementation
construction staff houses for security officers provide houses to security officers 2022-03-21 2022-12-30 MWK 1165826759.61
106 48/2020 Rehabilitation of kamudzu central hospital kitchen
implementation
rehabilitation FIxing and maintaning the kitchen structure Remodelling of the current kitchen into a better one 2021-05-20 2022-08-31 MWK 95810334.11
107 50/2020 Rehabilitation of offices at MWASIP
implementation
rehabilitation Rehabilitation of offices at MWASIP for better standard of 2021-04-01 2022-10-30 MWK 275080202.60
108 03/2022 Completion of social amenities community ground hall,library and bus deport
implementation
construction community ground,hall,library,bus deport Provision of social services to the community 2022-03-04 2022-10-21 MWK 618353349.71
109 18/2020D Construction of staff houses for Malawi police
implementation
construction staff houses for malawi police in Lilongwe for a better living 2022-07-12 2023-04-28 MWK 857483415.86
110 19/2022 Construction of prison houses
implementation
construction security institutions houses for prison staff provide houses to prison staff 2022-03-21 2023-04-29 MWK 2235379805.56
151 LCC/WDF/01/21/FOOT BRIDGE/ MBVUNGUTI Construction of FOOT BRIDGE in mvunguti ward under WDF In lilongwe City centre constituency
implementation
construction Construction of FOOT bridge Ease transportation of goods and services 2022-06-30 2022-07-31 MWK 4256396.00
153 LCC/WDF/02/22/TIMBER BRIDGE Construction of Timbe Bridge in Mtsiriza ward under ward development fund in lilongwe City centre constituency
completed
construction Construction of timber Bridge in mtsiriza ward by Johaq construction Ease movement of people and goods 2022-06-01 2022-07-31 MWK 4860265.00
161 LCC/1/pw construction of majiga box curvelt under constituency development fund in Area 23
completed
construction Construction of Majiga box curvelt under constituency development fund in Area 23 the bridge is used by cars and people when crossing the river 2022-04-11 2022-07-10 MWK 14651000.00
175 e89ffc16 Kanzimbi health post
completion
construction Construction of Kanzimbi Health Post Improved quality health service delivery 2021-12-09 2022-03-31 MWK 41000000.00
199 MJDC-IPDC-21/22-W-7-DDF Construction of reticulated piped water system
completed
construction Construction of reticulated piped water system to improve portable water availability 2021-12-21 2022-04-20 MWK 30000000.00
208 07/2022 CONSTRUCTION OF CLINIC AND NON COMMUNICABLE DISEASES ANNEX
implementation
construction Completing construction of Clinic which stalled over five years ago. There is an inclusion on a non-communicable disease centre annex which aims at providing gym services. This project will allow civil servants to seek services within premises of their work place. Providing a wellness center and gym facility to civil servants 2022-07-18 2023-01-23 MWK 970127330.14
209 08/2022 CONSTRUCTION OF GOVERNMENT OFFICES
implementation
construction The construction of twenty-storey twin towers to accommodate MDA’s in secure and comfortable environment. To provide working space for government officers 2022-08-01 2027-08-31 MWK 20000000000.00
233 LCC/IPDC/07/22/LLCSE/CDF CONSTRUCTION OF VARIOUS BRIDGES(CONSTRUCTION OF KALIYEKA BOX CULVERT) IN LILONGWE CITY SOUTH EAST CONSTITUENCY UNDER CONSTITIUENCY DEVELOPMENT FUND FOR 2022/2023 FINANCIAL YEAR LOT - 3
implementation
construction CONSTRUCTION OF VARIOUS BRIDGES(CONSTRUCTION OF KALIYEKA BOX CULVERT) IN LILONGWE CITY SOUTH EAST CONSTITUENCY UNDER CONSTITIUENCY DEVELOPMENT FUND FOR 2022/2023 FINANCIAL YEAR LOT - 3 BY IPYANA CIVIL ENGINEERING IMPROVE TRANSPORTATION OF GOODS AND SERVICES IN KALIYEKA WARD 2022-12-09 2023-02-07 MWK 51332463.00
234 MCC/WORKS/18/05/LOT3-PHASE1 UPGRADING OF SELECTED ROADS IN THE CITY OF MZUZU
implementation
construction The project connects M5 at Mzuzu govt Sec Sch-Luwinga at Mzuzu Coffee. It has four sections as follows: M5-Matete, Matete-Choma, Zolozolo CCAP- Zolozolo Clinic and Mzuzu Technical - Luwinga. This is a critical road likely to decongest the city, improve mobility of farm produce, business interventions. It is also a gateway to an environmental conservation site - the Botanic gardens, the Road also acts as a bypass connecting M1 at Luwinga and M5 at Junction to Mzuzu Govt Secondary School. It is undeniably open new opportunities for the people of Mzuzu, its clients and the Council at large. 2019-08-16 2023-08-16 MWK 5837802640.35
235 LCC/IPDC/07/22/LLCSE/CDF CONSTRUCTION OF VARIOUS BRIDGES(DRAIANGE IMPROVEMENT IN KALIYEKA 2 ) IN LILONGWE CITY SOUTH EAST CONSTITUENCY UNDER CONSTITIUENCY DEVELOPMENT FUND FOR 2022/2023 FINANCIAL YEAR LOT - 3
implementation
construction CONSTRUCTION OF VARIOUS BRIDGES(DRAIANGE IMPROVEMENT IN KALIYEKA 2 ) IN LILONGWE CITY SOUTH EAST CONSTITUENCY UNDER CONSTITIUENCY DEVELOPMENT FUND FOR 2022/2023 FINANCIAL YEAR LOT - 3 BY IPYANA CIVIL ENGINEERING IMPROVE DRAIANGE SYSTEM IN KALIYEKA WARD 2022-12-08 2023-02-07 MWK 15083119.00
237 102005007 Hara Health Centre Staff house and Solar Installation
implementation
construction Construction of One Staff House, Single VIP Toilet and Installation of a Water System To provide a conducive working environment for the Health workers 2021-07-01 2022-03-31 MWK 27000000.00
240 LDC/GESD/2022-23/CDB/01G- Lot 2 Construction of a 30 tonne concrete deck bridge at Kanjamwana
implementation
construction construction of a 30 tonne concrete deck bridge to improve the quality of transportation during rainy season 2023-01-13 2023-04-13 MWK 59250000.00
239 LDC/GESD/2022-23/CDB/01G- lot 1 Construction of a 30 tonne concrete deck bridge at Likuni River on Mtchayi to Chiponde Road
implementation
construction construction of a 30 tonne concrete deck bridge to improve the quality of transportation along this road during rainy season 2023-01-13 2023-04-13 MWK 85889856.00
242 LDC/GESD/2022-23/CDB/01G- Lot 4 Construction of Lumbadzi Box Culverts on Maenje Village to Mtengowanthenga hospita
implementation
construction construction of 3 cell box culvert and 2 cell box culvert to improve quality of transportation during rainy season 2023-01-13 2023-04-13 MWK 65210613.09
243 LDC/GESD/2022-23/CDB/01G- Lot 5 Construction of a 30 tonne concrete deck bridge at Nathenje river on Chaseta Village to Njati Village
implementation
construction construction of a 30 tonne concrete deck bridge to improve quality of transportation during the rainy season 2023-01-13 2023-04-13 MWK 64246884.40
241 LDC/GESD/2022-23/CDB/01G - LOT 3 Construction of a 30 tonne concrete deck bridge at Livuwadzi on Chimphangu to Kamphira road
implementation
construction construction of a 30 tonne concrete deck bridge to improve the quality of road transportation during the rainy season 2023-01-13 2023-04-13 MWK 67950915.00
271 LDC/GESD/2022-23/CB/04G-LOT2 Construction of a classroom block at Mwangu primary school
implementation
construction construction of a 2 roomed classroom block To reduce the pupil to classroom ratio 2023-01-13 2023-04-13 MWK 41500000.00
272 LDC/GESD/2022-23/CB/04G - Lot 1 Construction of a Classroom block at Chiputu Primary School
implementation
construction Construction of a 2 roomed classroom block to reduce the pupil to classroom ratio 2023-01-13 2023-04-13 MWK 41500000.00
277 LCC/CDF/2022-2023/MTANDIRE Drainage improvement on Glorious Box culvert
completed
construction Construction of drains and road improvement leading towards Glorious box culvert Improvement of road infrastructure in the city 2023-02-27 2023-04-28 MWK 34752532.50
281 LDC/GESD/2022-23/CB/04G-LOT3 Construction of a classroom block complete with furniture at Kamganga primary school
implementation
construction construction of a classroom block complete with furniture at Kamganga primary school To reduce the pupil to classroom ratio 2023-01-13 2023-04-13 MWK 42000000.00
278 MW-DDC-316466-CW-RFB Construction of Lingadzi Bridge
implementation
construction Construction of 27m and 6m Concrete Deck Bridges Construction of a bridge 2023-02-13 2023-05-13 MWK 62265658.90
274 MW-DDC316277-CW-RFB Construction of Dzoole Police Unit (Administration Block)
implementation
construction Construction of Administration Block at Dzoole Police Unit To provide housing to the Police Unit 2023-02-15 2023-06-14 MWK 70387617.74
269 LCC/IPDC/07/22/LLCSW/CDF CONSTRUCTION OF KAWALE MARKET SHED BENCHES IN LILONGWE CITY SOUTH WEST CONSTITUENCY UNDER CONSTITUENCY DEVELOPMENT FUND)
completed
construction CONSTRUCTION OF VARIOUS PROJECTS (CONSTRUCTION OF MARKET SHED BENCHES) IN LILONGWE CITY SOUTH WEST CONSTITUENCY UNDER CONSTITUENCY DEVELOPMENT FUND) Improvement of Market Infrastructure in the City 2023-01-11 2023-03-12 MWK 9910250.00
229 LCC/IPDC/07/22/LCC/CDF CONSTRUCTION OF AREA 18B NORTHREN FOOTBRIDGE UNDER CONSTITUENCY DEVELOPMENT FUND (CDF) IN LILONGWE CITY CONSTITUENCY-LOT3
completed
construction CONSTRUCTION OF 8m long AREA 18B NORTHREN CONCRETE FOOTBRIDGE UNDER CONSTITUENCY DEVELOPMENT FUND (CDF) IN LILONGWE CITY CONSTITUENCY-LOT3 Improve transportation of goods and services from area 18A to area 18B 2022-11-14 2023-01-14 MWK 26406446.99
268 LCC/WDF/0/22/CULVERTS/MVUNGUTI INSTALLATION OF CULVERTS AT MVUNGUTI WARD UNDER WDF PROJECT
completed
construction installation of culverts infrastructure improvement in the city 2023-02-15 2023-04-16 MWK 7217100.00
267 WDF/CULVERTS-KAWALE1 CULVERT INSTALLATION AND CLEANING IN KAWALE 1
completed
construction Installation of concrete culvert rings at various locations in Kawale 1 Improvement of road infrastructure in the city 2023-02-15 2023-04-16 MWK 5976647.50
231 LLC/IPDC/07/22/LCC/CDF CONSTRUCTION OF AREA 18B SOUTHERN FOOTBRIDGE UNDER CONSTITUENCY DEVELOPMENT FUND IN LILONGWE CITY-LOT 2
completed
construction Project includes footing, masonry, steelwork and concrete deck To improve mobility between Area 18 A and Area 18 B 2022-11-21 2023-02-19 MWK 19514968.25
232 LCC/CDF/08/22/BOREHOLES/LCSE DRILLING OF SIX BOREHOLES IN LILONGWE CITY SOUTH EAST CONSTITUENCY UNDER CDF PROJECT
completed
construction Drilling of six boreholes Providing safe water to the community. 2022-11-30 2023-01-29 MWK 26600673.00
288 MW-DDC316277-CW-RFB Construction of Chivala Police Unit (Administration Block)
implementation
construction Construction of Administration Block at Chivala Police Unit Construction of an Administration Block 2023-02-19 2023-06-18 MWK 84053611.00
290 MW-DDC316466-CW-RFB Construction of Nkhathwe Bridge
implementation
construction Construction of a 10m Concrete Deck Bridge at Nkhathwe Bridge Construction of a Bridge 2023-02-10 2023-06-09 MWK 30208771.75
296 MW-DDC-316466-CW-RFB Construction of Mtiti Bridge
implementation
construction Construction of Mtiti Bridge (16m Concrete Deck Bridge) Construction of a Bridge 2023-02-27 2023-06-27 MWK 37274069.50
298 MW-DDC-316466-CW-RFB Completing of Madzo Maternity Wing
implementation
construction Completing of Madzo Maternity Wing Completing of Madzo Maternity Wing 2023-02-09 2023-05-05 MWK 45781396.25
299 MW-DDC316466-CW-RFB Construction of Umoyo Staff House
implementation
construction Construction of Umoyo Staff House at Madzo Clinic Construction of Umoyo Staff House 2023-02-09 2023-05-05 MWK 43352309.00
308 NB/DDF/2122/2 Makumbo U5 Clinic Staff House
completed
construction Construction of Makumbo U5 Clinic Staff House in TA Zilakoma, Tukombo Ward, South Constituency To provide accommodation for health workers 2021-07-01 2022-06-30 MWK 27699975.00
311 MDC/GESD/NJUYU/2022-23/002 Construction of Maternity Wing at Njuyu Health Centre
implementation
construction The project involves construction of maternity wing, Placenta pit and Incinerator and provision of basic furniture To improve maternal health 2023-02-13 2023-05-14 MWK 130346984.16
313 CPDC/01/11/22 Construction of Abattoir (Chitipa Boma)
completion
construction The project will involve the construction of a structure that has a slaughter area with benches, meat hangers, benches, and drainage lines. The purpose of this project is to provide a conducive, hygienic slaughter environment that promotes good general public health. 2022-11-29 2023-03-10 MWK 39550072.00
318 MDC/GESD/KANJUCHI/2022-23/003 Construction of Kanjuchi police Unit
implementation
construction The project involves construction of police unit block ,toilets and provision of basic furniture To improve security services, law and order 2023-02-19 2023-05-20 MWK 63035278.09
310 MDC/GESD/KAMWE/2022/23/001 Construction of staff house at Kamwe Health Centre
implementation
construction Construction of a staff house, toilet, electricity and water connection. To provide a conducive working environment for health workers. 2023-02-19 2023-05-20 MWK 36182190.21
322 NB/DDF/2122/3 Nkhwali Clinic
completed
construction Construction of Nkhwali Clinic To provide health services tp the citizens of nkhatabay 2021-12-28 2022-04-26 MWK 45510896.75
324 CPDC/19/01/23 Construction of Chitipa Bus Depot (First Phase)
implementation
construction The project will include the construction of a fence, gate, and guard room and the renovation of the old market shed into a depot shed The project will provide a conducive environment for people to board buses and provides security to passengers and their goods 2023-01-19 2023-05-30 MWK 40000000.00
325 NB/DDF/2122/4 Mzenga CDSS Boys Hostel
completed
construction Construction of a boys hostel at mzenga CDSS, TA Kabunduli To provide accomodation for students to enable a conducive learning environment 2021-12-28 2022-06-30 MWK 63415112.25
326 CPDC/29/11/22 Construction of Kameme EPA Office
implementation
construction The project will construct an office block for agricultural extension workers and provision of furniture The project aims at improving the provision of agricultural extension services in the Kameme area as the extension workers will have offices within the area. This in turn is anticipated to improve agricultural production and improve household income for the farming family households. 2022-11-29 2023-02-28 MWK 63398306.00
327 CPDC/29/11/23 Construction of Girl's Hostel at Namatubi CDSS
implementation
construction The project will involve the construction of the girls' hostels with 80 beds, with an attached ablution block. The project aims at promoting the education of the girl child as it will help to eliminate numerous challenges (sexual harassment, rape, etc) the girl child goes through when they travel long distances. 2022-11-29 2023-03-10 MWK 65686960.00
238 MIE/CoTC/NCB/2021 construction of training complex at MIE
implementation
construction Administration Block, Cafeteria, classroom block, fence and conference centre expansion of training facilities 2022-07-27 2023-12-15 MWK 2386380598.98
259 50/2020 Rehabilitation of offices at MWASIP in lilongwe district
completion
rehabilitation Rehabilitation of offices, change of workstations and purchase of furniture and other stationery To provide a good working environment for staff at MWASIP 2021-04-01 2021-07-22 MWK 275080202.60
330 IPDC/2022/2023/01 REGIONAL 5 GAMES Expansion and maintenance of landscape works at civo stadium- Lilongwe
completion
expansion Expansion and maintenance to improve and provide an attractive ambience of the stadium 2022-08-15 2022-10-19 MWK 59698214.40
306 DADC/MLG/CNGCSA/W/2021-2022 Completion of social amenities( community ground, hall, library and bus depot)
completion
construction construct, hall library and bus depot and its associated works to improve the social well being of individuals at Nambuma growth center 2022-03-04 2022-10-21 MWK 618353349.71
304 SFS/242/10(B) Completion and maintainance of EPI office block at CHSU in Lilongwe
completion
construction building, maintenance nd all associated works to provide a good working environment for staff at EPI 2021-06-07 2021-12-08 MWK 787948901.72
303 31/HSSP,MOH/RFQ/W/021/FY19-20 Conversion of boiler room into gas plant room at kamuzu central hospital in lilongwe
completion
replacement replacement of boiler equipment with gas plant equipment to provide enough room for the gas plant 2020-05-04 2020-06-30 MWK 118586224.29
302 031/MOHRFQW025/FY19-20/02COVID 19LOT 1 Rehabilitation of Karonga and Mzuzu covid19 isolation centers
completion
rehabilitation rehabilitation of rooms and purchase of new beds and beddings to provide a good isolation facilities for covid19 patients 2020-07-30 2020-08-30 MWK 114120892.32
291 031/MOHRFQ/W24/FY19-20 Rehabilitation of Ebola shelter at kameza in blantyre to turn it into covid19 isolation centre
completion
replacement Turn Ebola shelter into COVID 19 isolation center to have a good isolation center for COVID patients at kameza 2020-06-08 2020-07-17 MWK 85818359.32
289 031/MOHRFQW025/FY19-20/02 COVID 19LOT2 Rehabilitation of Dedza and Mchinji Covid 19 Isolation Centres
completion
rehabilitation rehabilitation of buildings, purchase of beds and beddings to provide good and conducive isolation facilities for patients 2020-07-28 2020-08-30 MWK 114120892.32
276 MRA/M-WORKS/01/2020/010 Completion of domestic taxes annex building- Lilongwe
completion
construction building of annex and its associated works for proper management of government revenue 2020-05-18 2020-11-29 MWK 23557749.69
266 BT/2020/1 Construction of civil works on rail line at blantyre strategic fuel reserves
completion
construction construction of rail line to provide easy access to strategic fuel reserves 2021-01-05 2021-09-05 MWK 431923684.38
265 02/2020 Completion of office block for agricultural commercialization project area 4- Lilongwe
completion
construction construction of office block to provide an office for conducting commercial activities for the agricultural sector 2021-02-22 2021-04-30 MWK 333073132.74
264 06/2020 Construction of security institutional houses for Malawi Police Services at IPYANA and SONGWE in karonga district
completion
construction construction of houses and its associated works To provide secure institutional houses for the police service 2020-11-30 2021-12-17 MWK 1300795693.88
263 16/2022 Construction of 2NO, staff houses and associated external works- Monkeybay
implementation
construction Construction of houses and associated external works to provide a conducive living environment for staff members 2023-03-27 2023-10-11 MWK 311639611.11
333 ZCC/RD/RFA/CON/ENG/2021-22/06 Consultancy Services
implementation
construction Consultancy Services for Design review and Construction Supervision of Selected Roads Provision of supervision 2022-11-16 2023-08-13 MWK 130000000.00
334 NDC/DDF-ZALEWA/22-23/01 CONSTRUCTION OF ZALEWA TRUCK YARD DRAINS AND MASONRY RETAINING WALLS
implementation
construction CONSTRUCTION OF ZALEWA TRUCK YARD DRAINS AND MASONRY RETAINING WALLS The main aim is to reduce congestion of trucks at Zalewa trading centre , in so doing generating revenue for the the council. 2022-12-09 2023-06-30 MWK 12740775.00
338 NDC/CDF-NORTH/22-23/04 MAINTENANCE OF CHILIM'BONDO AND MPIMBI SCHOOL BLOCKS
completed
rehabilitation maintenance of classroom blocks which were blown away by cyclone winds. to reinstate the building to its function of accommodating students. 2023-01-17 2023-03-31 MWK 9814908.05
339 BCC/RFA-MAK-EME/5/3/2/2022-23 Emergency Civil Works for the Construction of Box Culvert at Makalanga(Chilaweni Bridge) across Nkolokoti Parkway
implementation
construction Construction of Box Culvert Provide access 2023-04-19 2023-08-31 MWK 962000000.00
340 NNDC/CDF-SOUTH/CHIDIDIDRIFT/22/11 CONSTRUCTION OF CHIDIDI DRIFT
completed
construction CONSTUCTION OF CHIDIDI DRIFT AT T/A MLAULI NENO SOUTH EASE TRANSPORT PROBLEMS IN LOCAL AREA 2022-11-24 2023-03-31 MWK 8477557.50
344 NDC/CDF-SOUTH-MAGALETACBCC/2022-23/01 MAINTENANCE OF MWAIWATHU CBCC KITCHEN
completed
rehabilitation MAINTENANCE OF MWAIWATHU CBCC KITCHEN WHICH WAS IN A DELAPIDATED STATE. TO KEEP THE STRUCTURE IN GOOD USE FOR LOCAL RESIDENTS. 2022-11-24 2023-03-31 MWK 2950000.00
345 NNDC/CDF-SOUTH/POLICECHIFUNGA/22/08 CONSTRUCTION WORKS OF CHIFUNGA POLICE UNIT
implementation
construction CONSTRUCTION OF CHIFUNGA POLICE UNIT IN SOUTH CONSTITUENCY PROVIDE SECURITY TO THE COMMUNITY 2022-11-24 2023-03-31 MWK 44830245.00
357 265 Construction of Pit Latrine and Rehabilitation of Lisungwi Police Unit
completed
construction Construction of pit latrine and rehabilitation of Lisungwi Police Unit Enforcement of law and order 2022-11-24 2023-03-31 MWK 7707407.01
358 265 Construction of Phwadzi Timber Deck Bridge
completed
construction Construction of Phwadzi Timber Deck Bridge To ease transportation problems 2022-11-24 2023-03-31 MWK 12101550.00
359 265 Construction of Kalumbe Timber Deck Bridge
completed
construction Construction of Kalumbe Timber Deck Bridge To ease transport problems in the area 2022-11-24 2023-03-31 MWK 8839962.50
360 265 Construction of Naminjale Timber Deck Bridge
completed
construction Construction of Naminjale Timber Deck Bridge To ease transportation problems 2022-11-24 2023-03-31 MWK 6774539.63
361 265 Construction of Two Double Pit Latrrines at Chikonde Primary School
implementation
construction Construction of two double pit latrines To aid with sanitation problems the school had encountered 2023-01-17 2023-03-31 MWK 8988469.34
362 265 Construction of a Low Cost Classroom Block at Mfunda Primary School
implementation
construction Construction of a low cost classroom block To reduce pupil classroom ratio 2023-01-17 2023-03-31 MWK 16748895.00
301 MW-DDC-316459-CW-RFQ Construction of Mdika Irish Bridge
implementation
construction Construction of Mdika Irish Bridge and Associated Drainage Construction of a Bridge 2023-02-09 2023-04-30 MWK 10470400.00
287 MW-DDC316277-CW-RFB Construction of Chinkhwiri Police Unit (Administration Block)
implementation
construction Construction of administration Block at Chinkhwiri Police Unit Construction of administration Block 2023-02-19 2023-05-18 MWK 71772836.72
364 LWB-IFP LILONGWE WATER BOARD INTERNALLY FUNDED PROJECTS
implementation
expansion The Project involves expansion and rehabilitation of the water supply infrastructure. Further, the project aims at enhancing business for LWB. To increase access of potable water in the LWB's supply area. 2020-07-01 2025-07-31 MWK 60000000000.00
293 LWB-RfRCI RELOCATION OF PIPES FOR ROAD CAPACITY IMPROVEMENT
implementation
replacement The project aims at relocating existing pipelines to pave way for the improvement of road capacities in the city of Lilongwe. The objective is to allow for a continuous water supply by avoiding damage to the water pipes should they remain under the driveways. 2020-07-01 2025-06-30 MWK 7000000000.00
366 EIB no. 2013-0566 LILONGWE WATER RESOURCE EFFICIENCY PROGRAMME
implementation
rehabilitation Medium-term investment programme to optimise available water resources, bridging the gap in water demand in Malawi's fast-growing capital city. The project's main components consist of upgrading a dam that is Lilongwe's primary water source, extending water-treatment works, reducing leakages and improving network management. The objective of the project is to ensure adequate water availability for the population of Lilongwe 2015-06-12 2022-10-31 EUR 28800000.00
367 EIB-MW-LDRP-01 LILONGWE DROUGHT RESILIENCE PROGRAMME
implementation
expansion The project seeks to expand the Water Treatment Facilities by providing an additional 50 000m3/day. At the end of the project, it is expected that there will be increased access to potable water as the additional water production capacity shall meet the demand of Lilongwe City and Surrounding Areas. 2020-12-23 2024-03-31 EUR 15000000.00
368 MW-RA-215215-CW-RFB CONSTRUCTION/REHABILITATION OF TRAUMA UNIT Dedza District Hospital
implementation
rehabilitation The Government of Malawi through the Roads Authority is implementing Trauma Units in 4 No. Health Facilities and the Rehabilitation of the Referral Hospital Trauma Unit in Blantyre along M1 Road between Blantyre and Lilongwe. This is to provide speedy medical attention/help to those involved in road accidents along the M1 road. The Trauma Units as designed shall be a fully established facility for the treatment of patients suffering from major traumatic injuries. The facilities will be an expansion programme at four District hospitals of Ntcheu, Dedza, Balaka and Lisungwi/QUECH. • The Trauma Units will assist in the treatment of emergency road accident victims on the M1 road. • The people around the area of the Trauma project will also benefit by being employed in various work activities by the Contractor. 2022-05-04 2022-12-03 MWK 424812686.55
370 MW-RA-235872-CW-RFB CONSTRUCTION/REHABILITATION OF TRAUMA UNITS Ntcheu District Hospital
implementation
rehabilitation The Government of Malawi through the Roads Authority is implementing Trauma Units in 4 No. Health Facilities and the Rehabilitation of the Referral Hospital Trauma Unit in Blantyre along M1 Road between Blantyre and Lilongwe. This is to provide speedy medical attention/help to those involved in road accidents along the M1 road. The Trauma Units as designed shall be a fully established facility for the treatment of patients suffering from major traumatic injuries. The facilities will be an expansion programme at four District hospitals of Ntcheu, Dedza, Balaka and Lisungwi/QUECH. • The Trauma Units will assist in the treatment of emergency road accident victims on the M1 road. • The people around the area of the Trauma project will also benefit by being employed in various work activities by the Contractor. 2022-05-04 2022-12-05 MWK 378121472.44
372 MW-RA-215217-CW-RFB CONSTRUCTION/REHABILITATION OF TRAUMA UNITS BALAKA DISTRICT HOSPITALS
implementation
rehabilitation The Government of Malawi through the Roads Authority is implementing Trauma Units in 4 No. Health Facilities and the Rehabilitation of the Referral Hospital Trauma Unit in Blantyre along M1 Road between Blantyre and Lilongwe. This is to provide speedy medical attention/help to those involved in road accidents along the M1 road. The Trauma Units as designed shall be a fully established facility for the treatment of patients suffering from major traumatic injuries. The facilities will be an expansion programme at four District hospitals of Ntcheu, Dedza, Balaka and Lisungwi/QUECH. • The Trauma Units will assist in the treatment of emergency road accident victims on the M1 road. • The people around the area of the Trauma project will also benefit by being employed in various work activities by the Contractor. 2022-05-04 2022-12-05 MWK 404975571.44
374 Contract No:MW-RA-235873-CW-RFB CONSTRUCTION/REHABILITATION OF TRAUMA UNITS LISUNGWI COMMUNITY HOSPITAL/QUEEN ELIZABETH CENTRAL HOSPITAL
implementation
rehabilitation The Government of Malawi through the Roads Authority is implementing Trauma Units in 4 No. Health Facilities and the Rehabilitation of the Referral Hospital Trauma Unit in Blantyre along M1 Road between Blantyre and Lilongwe. This is to provide speedy medical attention/help to those involved in road accidents along the M1 road. The Trauma Units as designed shall be a fully established facility for the treatment of patients suffering from major traumatic injuries. The facilities will be an expansion programme at four District hospitals of Ntcheu, Dedza, Balaka and Lisungwi/QUECH. • The Trauma Units will assist in the treatment of emergency road accident victims on the M1 road. • The people around the area of the Trauma project will also benefit by being employed in various work activities by the Contractor. 2022-05-03 2022-12-05 MWK 464887002.00
373 MW-MCDC-318597-CW-RFB [LOT NO. 2] Kadzala CDSS Girls Hostels
implementation
construction Construction of girls hostel at Kanilika Village. TA Mavwere To provide accommodation for girls at the school 2023-03-18 2023-07-16 MWK 179836983.60
376 KK DC/DDF/2022-2023-04 Rehabilitation of Dwambazi Market Shed
completed
rehabilitation Construction of vending benches, storm water drains and painting To boost local revenue 2022-12-15 2023-03-15 MWK 3942300.00
377 MW-MCDC-318596-CW-RFB [LOT NO.2] Border Road and Drainage
implementation
construction Construction of road and drainage at border To improve road access and drainage system at border 2023-02-23 2023-05-24 MWK 18241297.50
378 MW-MCDC-318594-CW-RFB [LOT NO.3[C]] Tembwe Dip Tank Rehabilitation
implementation
rehabilitation Rehabilitation of Tembwe Dip tank To control for livestock pest and diseases 2023-02-10 2023-06-10 MWK 8164340.00
382 procurement number Kamphemba primary school block
implementation
construction construction of primary school block, equiped with learners desks, teachers chairs to improve access to education as well as increased enrolment to primary schools in dedza 2023-02-13 2023-05-14 MWK 53077518.74
385 001/GESD/53087/10/21/702 Construction of Chamama Market
implementation
construction construction of open market shed, market kiosks , and a closed market shed. To provide shelter for vendors and enhance district council revenue generation. 2021-12-01 2022-05-01 MWK 95000000.00
387 procurement number Kapanda Safe water Project
preparation
construction construction of a solar powered reticulated water system, the project will provide the surrounding communities with piped and safe water 2023-02-13 2023-05-14 MWK 35714119.56
389 KK DC/DDF/2022-2023-01 Dwangwa dumping site
completed
construction Construction of Dwangwa dumping site To ease rubbish and environmental hygiene 2022-12-15 2023-03-15 MWK 13861409.97
393 KK DC/DDF/2022-2023-01 Boma Dumping site
implementation
construction Construction of Boma market dumping site To ease trashes and environmental issues at the market 2022-12-15 2023-03-15 MWK 13902071.00
396 procurement number Tembetembe safe water project
implementation
construction The construction of a solar powered reticulated safe water system . The project will provide safe water to households in the surrounding areas 2023-02-14 2023-05-15 MWK 37374078.06
399 KK DC/DDF/2022-2023-04 Chugumula Stadium
implementation
construction Construction of water drains and wiring of dressing rooms To collect more revenue and promoting sporting activities 2022-12-15 2023-03-15 MWK 17173600.00
369 KUMC/RMDB/7/2022-2023/11 REHABILITATION OF MAIN DAM BRIDGE AT CHITHIBA WARD
implementation
rehabilitation The project involves replacement of flat sheets as a deck To improve accessibility between Dam area and Ntambalala 2022-07-06 2024-03-31 MWK 8000000.00
401 KK DC/DDF/2022-2023-05 Bango to Mapala road reshaping
implementation
rehabilitation Reshaping, spot graveling and drainage works To ease transportation challenges 2022-12-15 2023-03-15 MWK 17422696.56
402 procurement number Kumitengo safe water project
implementation
construction construction of a solar powered reticulated safe water system, connected to taps in the surrounding communities the project will provide safe water to the surrounding communities in the area 2023-02-13 2023-05-14 MWK 36951078.00
394 KUMC/CMSK/07/2022-2023/10 CONSTRUCTION OF MARKET SHED AT KASALIKA MARKET
implementation
construction The project involves brickwork, plastering and roofing The purpose of the project is to house all market vendors under one roof and to prevent them from direct sunshine and rainfall 2022-07-06 2024-03-31 MWK 17000000.00
404 001/4109/12/22/800 construction of two classroom blocks with adjoined office for katchitsa primary school
implementation
construction construction of two classroom block, adjoined office and a toilet at Katchisa primary school To provide conducive learning and teaching environment for school going children and teachers 2023-01-25 2023-05-31 MWK 70000000.00
405 MW-MCDC-318594-CW-RFB [LOT NO.2] Mbingwa Livestock market
implementation
construction Construction of Mbingwa livestock market To provide platform for selling livestock 2023-02-08 2023-06-08 MWK 10924350.40
406 KK DC/DDF/2022-2023-02 Lozi Market Shed
implementation
construction Construction of market shed and toilets To boost local revenue 2022-12-15 2023-03-15 MWK 26987257.83
407 procurement number Mphanthi Primary school block
implementation
construction construction of a primary school block , furnished with classroom desks and furnished staff room The project will improve education stands in the district as well as increased enrolment. 2023-02-14 2023-05-15 MWK 59951427.68
409 MW-KDC-311884-CW-RFQ construction of Kasikizi Bridge
implementation
construction Construction of Kasikizi bridge construction of Kasikizi bridge to provide connectivity between Mtunthama communities and Chilowamatambe communities 2022-12-01 2023-05-31 MWK 54000000.00
410 MoE_2023_001 Construction of 3 TTCs
implementation
construction The Project involves the construction of Three Teacher Training Colleges (TTCs), one in each of the following districts: Mchinji, Chikwawa, and Rumphi; and the project has two lots with a total project cost of MK42 billion with BADEA, Saudi Fund for Development, and OPEC Fund for International Development providing 70% of the resources and Malawi Government providing counterpart funding of 30%. To increase enrolment of primary school student teachers and improve equitable access to quality education in primary schools 2018-01-01 2024-03-31 MWK 42000000000.00
408 RA/DEV/RU/2021-22/01 Upgrading of 20 Kilometres of Rumphi - Nyika - Road (Lot 2) (Chikwawa-Bembe section)
implementation
construction Pursuant to the Malawi Growth and Development Strategy (MGDSIII), 2018 and the Transport Master Plan, 2018 that are both recent policy documents that articulates issues related to both economic growth and development in the Transport Sector, the Government of the Republic of Malawi is upgrading the 20Km (Chikwawa Bembe Section) part of Rumphi Nyika road. The Rumphi Nyika road was initially constructed to an earth road, reshaped over several years by Graders to form a well drained all weather road with several ring culverts along the entire length. The scope of work includes upgrading of the existing earth road to Class I bitumen standard i.e. 6.8m carriage width and 1.5m sealed shoulders on both sides. Both the Base and Sub-base layers will be constructed from locally sourced natural gravel materials of 150mm thick each. Surfacing is 50mm thick Hot Mix Asphalt. The project will have many benefits to the people along the road and to the country as a whole. Some of the benefits will include; Reduced road maintenance costs, vehicle operating and passenger travel costs, ease problems of transporting farm inputs and produce to and from various markets, reduce the occurrence of dust and mud along the project area, employment creation, business boosting and boost tourism. 2022-08-24 2023-08-23 MWK 7694092436.93
411 MW-MCDC-318596-CW-RFB [LOT NO.6] Chithumba Bridge
implementation
construction Construction of chithumba bridge To ease road access 2023-04-08 2023-07-07 MWK 29055192.75
413 procurement number Namakasu police Unit
implementation
construction Construction of a police unit with a double VIP latrine The project will improve the level of security in the area as well as increasing the presence of police officers to assist reducing crime. 2023-02-14 2023-05-14 MWK 79516094.42
414 MW-KDC-311883-CW-RFQ construction of Tchesa EPA office
implementation
construction construction of Tchesa EPA office To enhance agricultural extension services 2022-12-01 2023-05-31 MWK 55000000.00
415 MW/SADC/DDF/60601 Thundu Teachers House
completed
construction Construction of 1 teachers house and 1 VIP Toilet The project is trying to address issues of High Illiteracy rate in the locality. 2021-12-21 2022-04-03 MWK 23846827.80
416 MW-MCDC-318596-CW-RFB [LOT NO.5] Chizeze/Kalulu Bridge
implementation
construction Construction of Chizeze Kalulu Bridge To ease road access and transportation 2023-04-09 2023-07-08 MWK 11423650.00
400 MW/SADC/DDF/60601 Kamphinda Police unit
implementation
construction Construction of Office Block, 1 staff house and 1 double VIP pit latrine The project is trying to address issues of high crime rate in the locality. 2021-12-12 2022-03-31 MWK 52498096.79
418 procurement number Chinkombero Health centre
implementation
construction Construction of 2 staff houses, 2 VIP latrines completion of Maternity wing, rehabilitation of the dispensary The project will improve health service delivery in area through provision of maternity service which are not available in the area 2023-02-13 2023-05-14 MWK 181825019.70
419 MW-KKDC-310960-CW-RFB Benga Market Shed
implementation
construction Construction of Market Shed and Toilets To boost local revenue 2023-02-21 2023-05-22 MWK 39585393.00
391 BLK-GESD-2-7 Construction of Nkaya Health Post
implementation
construction Construction of Nkaya Health Post with 3 Toilets and Furniture Improve access to health services at community level 2022-04-01 2023-03-30 MWK 92725850.56
412 MW-KDC-311880-CW-RFQ construction of Kapelula Police Unit
implementation
construction construction of Police unit office and pit latrine; one staff house with pit latrine To enhance security in Kasungu east constituency 2022-12-01 2023-05-31 MWK 90000000.00
381 BLK-GESD-2-9 Mulunguzi Health Post
implementation
construction Construction and rehabilitation of health centres Improve access to health services at community level 2022-04-01 2023-03-30 MWK 92913274.25
422 MW-MCDC-318594-CW-RFB [LOT NO. 10] Double VIP toilet at kamwendo
implementation
construction Construction of Double VIP toilet To promote sanitation at the market 2023-03-18 2023-06-16 MWK 3963125.00
286 MW-DDC-316277-CW-RFB Construction of Nalunga Police Senior Staff House
implementation
construction Construction of Staff House at Nalunga Police Unit Construction of a House 2023-02-21 2023-05-20 MWK 71585854.44
423 MW-KKDC-310959-CW-RFB Mwansambo Maternity Ward
implementation
construction Construction of new maternity ward To improve health services and reduce maternal death 2023-02-21 2023-06-21 MWK 112170755.22
424 MW-KDC-311880-CW-RFQ construction Chisinga police staff houses
implementation
construction construction of two staff houses at Chisinga police unit to enhance security in Kasungu north west constituency 2022-12-01 2023-05-31 MWK 75600000.00
425 procurement number Lombodzi primary school block
implementation
construction Construction of 2 classroom blocks and a staff room equiped with teachers chairs and desks for the learners the project will improve the education status in the area as well as increasing primary school enrolment 2023-02-13 2023-05-14 MWK 46330959.55
426 MW-KKDC-310961-CW-RFB Nkhunga Wards
implementation
construction Construction of New Male and Female wads To improve health services 2023-02-21 2023-06-21 MWK 268132249.29
427 MW-MCDC-340785-CW-RFB Boma Community Ground
implementation
construction Construction of stadium For income generation and recreation Centre 2023-03-11 2023-07-09 MWK 65780039.00
428 procurement number Katongole primary school block
implementation
construction Construction of a 2 classrooms, plus staff room, furnished with learners desks as well as teachers chairs the school block with improve the education delivery in the area as well as increase enrolment of primary school learners 2023-02-13 2023-05-14 MWK 58885455.74
430 MW-DDC-316466-CW-RFB Completition of Chibanzi Health post
completion
construction Construction of Health Post Provision of Health Services 2023-02-06 2023-05-17 MWK 39396474.61
432 procurement number Kamtambo Teacher House
implementation
construction The project will construct 1 teacher house with 2 VIP latrines the staff houses will health in the education delivery through improving the welfare of the teachers. 2023-02-13 2023-05-14 MWK 59219001.25
435 MW-DDC316466-CW-RFB Completion of Kawangi Girls Hostel
completion
construction Completion of Kawangi Girls Hostel in TA chiwere Provision of Education Services 2023-02-06 2023-05-31 MWK 24174680.55
437 procurement number Madzumbi Health unit
implementation
construction construction of a health unit with 2 VIP latrines The project will improve the health service delivery in the area through improved staff welfare at the health facility 2023-02-13 2023-05-14 MWK 89294486.58
436 RA/DEV/CP/2022-23/01 UPGRADING OF CHITIPA – ILOMBA (T301/D002) ROAD IN CHITIPA
implementation
construction The project road is approximately 31km of road section from Chitipa to Ilomba (Tanzania Border). The project will be executed in three (3) Lots. • The first lot (Lot 1) covers a distance of 10km from Chitipa, km 0+000 to km 10+000; • The second lot (Lot 2) covers a distance of 10km from km 10+000 to km 20+000; and • The third lot (Lot 3) covers a distance of 11km from km 20+000 to km 31+000. The scope of works involves upgrading works from earth to bitumen standard with improvements to horizontal and vertical alignments. The works will also include construction of bridges, box culverts and installation of numerous pipe culverts. Reduction in Vehicle Operating Costs Upgrading of the road will result in reduction of vehicle operating costs which constitutes the major benefit attributable to such new projects. Reduction in Travel Time and Cost The project will help reduce travel time from the agricultural areas. Passengers will now be paying less and spending less time on travel. Availability of buses and minibuses will greatly improve. Agriculture The area where the road passes is an agricultural area for mainly Irish potatoes and maize. The upgrading of the road will ease problems of transporting farm inputs and produce to and from various markets. Environmental and Health The upgrading will reduce the occurrence of dust and mud along the project area and thereby improving sanitation which means reduction in the spread of diseases which are airborne or waterborne. This will reduce the cost of medicines which would have been required to treat the people affected. The upgrading of the road will allow the communities good access to health facilities in town especially for referral cases. 2022-12-08 2024-06-08 MWK 34482770777.05
441 MW-DDC316277-CW-RFB Construction of Madisi Rest House Fence
completion
construction Construction of Madisi Rest House Fence Provision of Economy 2023-02-06 2023-05-17 MWK 26999400.60
443 MW-MCDC-318597-CW-RFB [LOT NO. 20] Boma Taxi Ranking Rehabilitation
implementation
rehabilitation Rehabilitation of Boma Taxi Rank To improve drainage system and condition of the taxi rank 2023-03-03 2023-06-01 MWK 5996016.17
444 MW/SADC/GESD/60601 Electrification of Mnema Health Centre
completed
expansion Connection of electricity to the maternity block The project is trying to address issues of maternal deaths hence reduce mortality rate in the locality. 2022-09-14 2022-12-15 MWK 1449996.27
447 MW/SADC/DDF/60601 Operationalise a paying ward at Salima District Hospital
implementation
rehabilitation Refurbishment, carpentry, plumbing, painting and electrical works To address the issue of low revenue collection and improve of social amenity 2022-09-14 2022-12-20 MWK 20000000.00
379 NS/IPDAC/GESD/WKS/2021-22/01-LOT 7 Rehabilitation of Chandawe Health Post- Maternity Wing
completed
rehabilitation The project sought to rehabilitate the maternity wing at Chandawe Health Post Reduce Mother and Infant mortality rate, through provision of conducive environment for child delivery. 2021-12-29 2022-03-31 MWK 23000000.00
380 NS/IPDAC/GESD/WKS/2021-22/01 LOT 2 Staff House at Mzandu Health Centre
completion
construction Construction of One Staff House at Mzandu Health Centre To increase number of staff accommodation 2021-12-29 2022-03-31 MWK 29110800.00
386 NS/IPDAC/GESD/WKS/2021-22/01-LOT 6 Rehabilitation of Maternity wing at Sambakusi Health Center.
completed
construction To rehabilitate the maternity wing at Sambakusi Health post. To reduce Mother and Infant mortality rate, through provision of conducive environment for child delivery 2021-12-29 2022-03-31 MWK 17000000.00
398 NS/IPDAC/GESD/WKS/2021-22/01 Solar water System at Kandodo Village
completed
construction Drilling & Installation of Mechanized Solar Water System To improve access to water which is essential for hygiene and sanitation. 2021-12-29 2022-03-31 MWK 18000000.00
292 NS/IPDAC/NCB/22/GESD/WK/02 Construction of Chinkhande Maternity wing
implementation
construction Construction of Maternity Wing and associated external works Support towards health delivery 2023-02-20 2023-06-30 MWK 237972400.00
392 NS/IPDAC/22/RFQ/WKS/01 Construction of kansonga police staff house
completed
construction Construction of 1t staff house for Kansonga Police Unit To increase police staff accommodation, that will allow the increased presence of police staff in the community 2022-03-01 2022-04-30 MWK 29000000.00
448 MoE_2023_002 Construction of Girls Hostel Project - Phase III
implementation
construction Construction of twelve (12) Girls’ Hostels in selected Community Day Secondary schools To increase access and equity to secondary education for all eligible students, with particular focus on girls, vulnerable groups and other categories of students that find access difficult, including those travelling longer distances in rural areas. 2018-07-01 2019-06-30 MWK 12500000000.00
449 MoE_2023_003 Construction of Primary Schools and Rehabilitation of Education facilities
implementation
construction Construction of 14 Urban Primary Schools in Blantyre, Lilongwe, Mzuzu and Zomba To decongest some of the highly populated urban primary schools 2018-07-01 2019-06-30 MWK 10000000000.00
450 MoE_2023_004 Construction of Laboratory / Library blocks in 29 Selected Community Day Secondary Schools.
implementation
construction Construction of Laboratory and Library blocks To increase access and equity to secondary education for all eligible students, with particular focus on girls, vulnerable groups and other categories of students that find access difficult, including those travelling longer distances in rural areas. 2017-04-01 2017-10-01 MWK 5000000000.00
451 LDC/GESD/2022-2023/CDB/01GLOT6 CONSTRUCTION OF KAPANGALIKA CONCRETE DECK AT NAMBUMA RIVER
implementation
construction CONSTRUCTION OF KAPANGALIKA CONCRETE DECK AT NAMBUMA RIVER TO IMPROVE QUALITY OF TRANSPORTATION OVER NAMBUMA RIVER 2023-01-13 2023-04-13 MWK 45000000.00
452 MoE_2023_005 EQUITY WITH QUALITY AND LEARNING AT SECONDARY (EQUALS) PROJECT
implementation
construction The EQUALS Project is a Ministry of Education intervention which seeks to improve the quality of mathematics and science instruction in CDSSs and increase access to secondary education in remote areas. The Project emanates from a background of acute secondary education subsector’s challenges such as: persistently low learner achievement levels in Mathematics and Science subjects; inadequate enabling strategic policy reform agenda; low primary to secondary learner transition rate; inadequate and underqualified teachers; inadequate purposely built and resourced science learning space; unavailability or inadequate quantities of learner core textbooks, Teachers’ Guides, supplementary reading materials; and disparities in resource allocation. The EQUALS Project is funded by the World Bank through an initial $90million credit facility and later an Additional Financing (AF) through a Grant of $5.0million for mitigating the impact the COVID-19 pandemic. The total financing is therefore $95.0 million with a life span of six years running from October, 2019 to December, 2025. The EQUALs project has a primary objective of improving the quality of mathematics and science instruction in CDSS and increase access to secondary education in selected remote areas. 2019-10-01 2025-12-31 USD 95000000.00
456 RA/MAI/SR/2022-2023 The Road and Bridge Maintenance Programme for the 2022/23 South
implementation
rehabilitation The Road and Bridge Maintenance Programme for the 2022/23 Financial Year works consist of Sectional Periodic Maintenance, Rehabilitation, Retainer Pothole Patching, Emergency and Urgent works, Routine Term Maintenance; Grading and Reshaping of Trunk, Urban and District Roads and Associated Drainage Works Sectional Periodic Road Maintenance 2022-12-01 2023-10-01 MWK 3966375520.85
457 MoE_2023_006 SKILLS FOR VIBRANT ECONOMY (SAVE) PROJECT
preparation
construction The Government of Malawi with support from World Bank is implementing a five year Skills for Vibrant Economy (SAVE) Project through the Ministry of education in collaboration with the Ministry of Labour, The total cost of the project is $100 million. The overall project objective is to increase equitable access to market relevant skills in priority areas of the economy, especially for the females and vulnerable youths in the targeted institutions. The SAVE project became effective on 14th October 2021 and is expected to close on 30 June 2026. The purpose of the project is to increase equitable access to market relevant skills in priority areas of the economy, especially for the females and vulnerable youths in the targeted institutions. 2021-10-14 2026-06-30 USD 100000000.00
459 MoE_2023_007 SECONDARY EDUCATION EXPANSION FOR DEVELOPMENT (SEED) PROJECT
implementation
construction The Ministry through the Secondary Education Expansion for Development (SEED) Project is constructing 250 secondary schools across the country. The overall Project objective is to increase access to secondary education through expanding schools in urban areas and establishing new schools in rural areas. The total Project cost is USD90 million and is funded by the Government of the United States of America. The purpose of the project is to increase access to secondary education through expanding schools in urban areas and establishing new schools in rural areas 2018-06-01 2023-06-30 USD 90000000.00
460 MoE_2023_008 SECONDARY EDUCATION IN MALAWI (ISEM II) PROJECT
preparation
construction ISEM II Project aims at upgrading and expanding secondary school infrastructure, and expanding technical vocational education facilities in secondary schools, including improved WASH facilities and climate resilient infrastructure. The upgrading and expansion of secondary schools, focuses on infrastructure works for selected CDSSs in the original six (6) ISEM I demonstration districts and six (6) additional districts. The Project will run from 2021 to 2025. aims at upgrading and expanding secondary school infrastructure, and expanding technical vocational education facilities in secondary schools, including improved WASH facilities and climate resilient infrastructure 2021-07-01 2025-12-31 EUR 55000000.00
463 MoE_2023_010 MALAWI EDUCATION REFORM PROGRAM (MERP)
preparation
construction This Programme is co-financed by the Government, World Bank and Global Education Partners (GPE). The main objective of the programme is to improve learning environments for students in lower primary in public schools. The duration of the programme is 4 years, which will run from December 2021 to December 2025. The programme consists of five components namely: Expanding and reforming primary school improvement grants; Improving learning environments in lower primary to support learning recovery after COVID-19; supporting girls‟ learning; School leadership; and Project coordination and capacity building. The main objective of the programme is to improve learning environments for students in lower primary in public schools 2021-12-01 2025-12-01 USD 210500000.00
462 MoE_2023_009 INKOSI YA MAKHOSI M'MBELWA UNIVERSITY
preparation
construction The project involves construction of a new University that shall have four schools and a high-tech Livestock Industrial Centre as follows: School of Basic Sciences; School of Animal Sciences with an Animal Farm; School of Veterinary Medicine with a Veterinary Clinic; School of Human Health Sciences; and a High-tech Livestock Industrial Centre with 4 hubs. To increase enrolment 2014-07-01 2025-10-15 USD 535000000.00
466 KUMC/RDB/2022-2023/ RENOVATION OF MAIN BUS DEPOT
implementation
replacement The project involves laying concrete in the bus depot The purpose of the project is to improve the overall outlook of the depot and the manoeuvrability of vehicles 2022-07-06 2024-03-31 MWK 24500000.00
390 06/2008 Infrastructure Rehabiliotation and Expansion at Malawi College of Health Sciences
implementation
construction Construction of one Auditorium, two hostels, two classrooms, one Library and administration block To increase teaching and learning space. To increase accommodation space, Increase office space and increase library space 2009-06-29 2013-03-29 MWK 624271476.65
442 091/NUDC/GESD/WORKS/NAMITENGO SCHOOL BLOCK/21/22FY/05 CONSTRUCTION OF NAMITENGO SCHOOL BLOCK
implementation
construction The project will involve construction of a primary school block. It will involve a complete double classroom block and furniture. The project aims at addressing very high enrolment rates. 2022-01-10 2022-04-10 MWK 23105985.00
434 091/NUDC/GESD/WORKS/MANJAWIRA HEALTH STAFF HOUSE/21/22FY/07 CONSTRUCTION OF MANJAWIRA HEALTH STAFF HOUSE
implementation
construction The project will involve construction of the complete house, sanitary fittings, soil. Waste & vent services, cold water services and electrical installation. The project will provide accommodation near the health facility for quick health service delivery to the patients. 2022-01-10 2022-04-10 MWK 39193241.00
439 001/NUDC/GESD/WORKS/CONSTRUCTION OF SCHOOL BLOCK/BWANJE NORTH CONSTRUCTION OF NANYANGU SCHOOL BLOCK
implementation
construction The project will involve construction of a primary school block. It will involve a complete double classroom block and furniture. The project aims at addressing very high enrollment rates. 2023-01-10 2023-04-10 MWK 30428485.50
471 KUMC/RR/7/2022-2023/12 ROAD RESHAPING FROM MIKAYA'S RESIDENCE TO JEHOVAH'S WITNESS CHURCH
completion
construction The project involved forming a road camber and drainage systems using labour intensive To improve accessibility within the ward 2022-07-06 2024-03-31 MWK 1000000.00
477 KUMC/CFPB/9/2022-2023/17 CONSTRUCTION OF FOOTPATH BRIDGE AT KAVUNGUTI WARD
implementation
construction The project involves excavations ,concrete works,masonry works,steel work To improve accessibility between Mtondo area and Kavunguti Area 2022-07-06 2024-03-31 MWK 16500000.00
383 091/NUDC/GESD/WORKS/MPHIKA SCHOOL BLOCK/21/22FY/04 CONSTRUCTION OF MPHIKA SCHOOL BLOCK
implementation
construction The project will involve construction of a primary school block. It will involve a complete double classroom block and furniture. The project aims at addressing very high enrolment rates. 2023-01-10 2022-03-30 MWK 26680120.00
478 RA/MA/CR/2022-2023 The Road and Bridge Maintenance Programme for the 2022/23 CENTRAL REGION
implementation
rehabilitation The Road and Bridge Maintenance Programme for the 2022/23 Financial Year works consist of Sectional Periodic Maintenance, Rehabilitation, Retainer Pothole Patching, Emergency and Urgent works, Routine Term Maintenance; Grading and Reshaping of Trunk, Urban and District Roads and Associated Drainage Works Sectional Periodic Road Maintenance 2022-12-01 2023-10-02 MWK 3194341003.35
481 70263/19850 Construction of Mponela Community Hospital
implementation
construction To Construct a community hospital with the following structures an administration block, an outpatient Department, Maternity block, X- Ray block, Paediatrics, Nutrition and rehabilitation unit, Kitchen and Laundry, Laboratory, Maternal and child health, Mortuary, Ten professional houses, Thirty-five standard houses To improve the provision of Health Services at Mponela Trading Centre which has a growing population that can not be supported by the existing Mponela Health Centre 2018-07-01 2023-12-30 MWK 7593622080.13
482 70263/15700 Construction of Domasi Community Hospital
implementation
construction The Project involves the Construction of a community Hospital at Domasi in Zomba with the following blocks an administration block, an Outpatient Department, Maternity block, X- Ray block, Paediatrics, Nutrition and rehabilitation unit, Kitchen and Laundry, Laboratory, Maternal and child health, Mortuary, Ten professional houses, Thirty-five standard houses and External works like incinerators To improve the provision of Health Services at Domasi which has a growing population that can not be supported by the existing Health Centre. Domasi Community Hospital will also support and help decongest Zomba Central Hospital 2013-07-01 2023-12-31 MWK 6994011641.44
483 091/NUDC/DDF/MPAMADZI BRIDGE/2021 - 2022 FY Construction of Mpamadzi Bridge
completed
construction Project involved construction of a 10 metre single span concrete deck bridge The project aimed at improving accessibility between two areas in order to provide economic benefit to the people. 2021-08-02 2021-11-01 MWK 30000000.00
454 RA/MAI/NR/2022-2023 The Road and Bridge Maintenance Programme for the 2022/23 NORTH
implementation
rehabilitation The Road and Bridge Maintenance Programme for the 2022/23 Financial Year works consist of Sectional Periodic Maintenance, Rehabilitation, Retainer Pothole Patching, Emergency and Urgent works, Routine Term Maintenance; Grading and Reshaping of Trunk, Urban and District Roads and Associated Drainage Works Sectional Periodic Road Maintenance 2022-12-01 2023-12-01 MWK 4912390954.35
328 CPDC/29/11/22c Construction of Market Shed at Chitipa Boma
completion
construction The project will construct a market shed at Chitipa Boma The project will provide conducive trading place for vendors to ply their trade and reduce roadside accidents due to trading along the streets 2022-11-29 2023-03-29 MWK 26931265.00
323 MDC/NCB/GESD/2022-23/Milala Construction of a laboratory at Milala CDSS
implementation
construction Construction of a laboratory at Milala CDSS To improve educational standards in the area. 2023-02-19 2023-05-20 MWK 86596270.75
480 70263/12030 Construction of National Cancer
implementation
construction The Project involves the construction of a Cancer Treatment centre with a Chemotherapy suite, an administration block, a consulting block, 3 wards, 4 Radiotherapy, 2 Brachytherapy Bunkers, nuclear medicine block, Treatment and imaging block, waiting hostels, laboratory, a theatre and other supporting amenities. To construct a National Cancer Centre with Radiotherapy bunkers 2017-08-01 2023-12-30 USD 22450000.00
320 KADC/DDF/W/DC'S-OFC/2020-2021/01 Construction of Karonga DCs Office
implementation
construction Construction of the DCs Office in Karonga District Provision of office space for the District Commissioner and other officer, since the old office was set on fire. 2022-12-22 2023-04-10 MWK 99979939.00
319 KADC/GESD Ngerenge Dispensary
completion
construction Construction of Ngerenge Dispensary in Karonga district. Providing health services to the community 2022-12-21 2023-04-30 MWK 97238676.00
312 KADC/GESD/W/ZGEBACDSS/22-23/05 Construction of Zgeba Secondary School
completed
construction Completed Provide education to the community 2022-12-21 2023-04-20 MWK 69043760.93
316 KADC/GESD/IPONGA STAFF HOUSE/2022-23/03 Construction of Iponga CDA Staff House
completed
construction Construction of Iponga CDA Staff house in Karonga District Provision of Accommodation for the Community development Assistant 2022-12-21 2023-04-20 MWK 46032665.00
314 KADC/GESD/W/MLARE MAT-WING/2022-23/07 Construction of Mlare Maternity Wing
completion
construction Construction of Mlare Maternity Wing in Karonga District Provide health services to expectant mothers 2022-12-21 2023-04-10 MWK 91968950.00
317 MDC/NCB/GESD/2021-22/05 Mkunguni Primary School Block
completed
construction Construction of a standard classroom block using cement blocks at Mkunguni. To improve pupil-teacher ratio by easing congestion at the school. 2021-12-19 2022-02-28 MWK 22042284.00
315 MDC/NCB/GESD/2021-22/01 Construction of Luweya Bridge
completed
construction Construction of a 25 metre 3 span concrete deck bridge on Luweya river To promote access to socio-economic services 2021-12-28 2022-02-26 MWK 47134990.00
307 NB/DDF/2122/1 Chisangawe School Block
completion
construction Construction of Chisangawe School Block at Kandoli ward To provide conducive learning environment for learners 2022-02-02 2023-02-02 MWK 24184950.00
476 KUMC/ICR/7/2022-2023/26 INSTALLATION OF CULVERT RINGS AND RIVER CHANNELLING AT CHIMBUNA WARD
completion
construction The project involved excavation works concrete works, masonry works, plastering, backfilling To improve accessibility and drainage systems 2022-07-06 2024-03-31 MWK 1000000.00
469 KUMC/ICR/7/2022-2023/12 CONSTRUCTION OF FOOTPATH BRIDGE ON KASWALIMBA RIVER AT BUNDA WARD
completion
construction The project involves excavations, concrete, Carpentry and joinery, plastering The purpose of the project is to improve accessibility between communities within the ward 2022-07-06 2024-03-31 MWK 14500000.00
420 KUMC/CCPR/7/2022-2023/9 CONSTRUCTION OF COMMUNITY POLICE ROOM AT CHITETE WARD
implementation
construction The project involves excavations, brickwork, concrete works, roofing and plastering The main purpose is to improve security within the ward 2022-07-06 2024-03-31 MWK 7500000.00
363 ZCC/DFLA/SHOPS/ENG-SHOPSBUS-DEPORT/2022-2023/3 CONSTRUCTION OF SHOPS OPPOSITE NEW MPUNGA TAXI RANK
implementation
construction Construction of shops in Zomba City Bus Depot opposite New Mpunga Taxi Rank Provide business environment to the residents 2023-03-24 2023-09-20 MWK 281104455.85
337 BT-DDF 2023/005 Sukali Bridge
completed
construction Construction of a Bridge to facilitate accessibility to social services 2022-11-15 2023-03-23 MWK 12500000.00
388 BLK-GESD-2-6 Construction of Nkasi CDSS School Blocks
implementation
construction Construction of Nkasi CDSS School Blocks (1) with three (2) Toilets Improve access to Secondary Education 2023-02-23 2023-09-22 MWK 97647278.50
355 EGC 595/RFP/BESS/FY2022-23-temp 4.5 Wovwe Hydropower Plant Expansion Project
preparation
expansion EGENCO intends to take advantage of the available capacity at Wovwe to increase the generation output of the station To increase the generated power output at Wovwe Power Station 2018-01-01 2027-12-31 MWK 20000000000.00
354 EGC 595/RFP/BESS/FY2022-23 10MW SCALABLE SOLAR PHOTOVOLTAIC POWER WITH BATTERY ENERGY STORAGE SYSTEM(BESS), AUXILIARY EQUIPMENT AND ASSOCIATED WORKS AT NANJOKA IN SALIMA- PHASE II
preparation
expansion EGENCO is in the process of implementing a solar project at Nanjoka in Salima, which has been planned to be done in phases. The first phase of the project is already underway and involves installation of 10MW of solar with 5MWh battery energy storage system (BESS). It is against this background that EGENCO intends to implement the second phase of the 10MW Solar Photovoltaic (PV) electricity generation at Nanjoka in Salima The main goal of the project is to increase power supply in the country and improve energy generation mix. 2023-02-01 2026-09-30 MWK 0.00
350 EGC 202/RFP/SOLAR/FY2018-19 Design, Supply, Installation and Commissioning of 10MW Scalable Solar Photovoltaic Power, Auxiliary Equipment and Associated Works at Nanjoka in Salima.
preparation
construction EGENCO intends to install 10MW Solar PV Power Plant with battery at Nanjoka Salima The purpose is to add generation capacity to the national grid but also increase EGENCO's generation mix to reduce reliance on Hydro power plants cascaded along the Shire river which are prone to compounding devastation in case of dire irregularities in the flow of the Shire and any disasters. This in turn will help in the stability of the national grid. 2018-01-01 2025-06-30 USD 18000334.86
341 ZDC006 CHINSEU POLICE UNIT
implementation
construction construction of police unit involving construction of office building, toilet and staff house for community security 2023-03-01 2023-06-30 MWK 122211094.66
397 BLK-GESD-2-8 Construction of Concrete Refuse Bins
implementation
construction Construction of Concrete Refuse Bins (10) Improve sanitation at Balaka Town and other trading centres 2022-04-01 2023-03-30 MWK 32886362.50
336 BC494/1 Construction of 16 No. E2-72 semi-detached House at Ngumbe and 12 No. flats (2 Blocks) at BCA Hill in Blantyre City by Fargo
completed
construction Semi detached of Houses To provide affordable houses to the Malawians 2019-04-15 2022-01-14 MWK 1082134232.81
280 LDC/GESD/2022-23/CB/04G - Lot 4 construction of a classroom block at Dambo Primary School
completion
construction construction of a two roomed classroom block to reduce the pupil to classroom ratio 2023-01-13 2023-04-13 MWK 42000000.00
282 LDC/GESD/2022-23/CB/04G-LOT5 Construction of a classroom block at Mtuwakale primary school
completion
construction construction of classroom block at Mtuwakale primary school To reduce pupil to classroom ratio 2023-01-13 2023-04-13 MWK 41500000.00
300 ZCC/RFA/ENG/RD/2022-23/02 Rehabilitation of Ndola Roads
implementation
rehabilitation Good road network and improving drainage system Improve mobility to CBD 2022-11-01 2023-04-30 MWK 8155007.70
309 NRWB/RU Rumphi Water Supply and Sanitation Services Improvement Project
preparation
construction Rumphi water supply system currently provides water to 17,928. Majority of the customers are connected through 20 mm diameter pipelines resulting in very low pressures. Rumphi water supply scheme covers most of the areas of Rumphi Boma except developing areas around the Boma such as Jaghala and Mlongoti which are partly connected and having low pressures. Boundaries of the existing water supply are Mayembe and Phalasitwe Hills to the north, South Rukuru River to the south and east and Chigwere to the west. To construct an intake weir for Rumphi water supply system; To upgrade the water treatment plant; To upgrade the water supply transmission systems covering pumps and pipelines including installation of solar power; To upgrade and expand the distribution pipe network including construction of storage tanks; To enhance access to improved sanitation and hygiene services; To construct a sanitary landfill; To construct a liquid waste/ wastewater treatment facility; To manage the catchment area for South Rumphi River. 2023-08-01 2027-07-31 USD 36286000.00
365 LWB-EDFP LILONGWE WATER BOARD ESTATE DEVELOPER FINANCED PROJECTS
implementation
expansion These projects are implemented to reticulate new areas upon request by various estate developers such as Malawi Housing Corporations, Ministry of Lands, etc. To increase access to clean water services 2020-07-01 2025-07-31 MWK 2000000000.00
417 MW-KDC-311887-CW-RFQ construction Kaluluma fish ponds
implementation
construction construction Kaluluma two fish ponds To enhance the supply of protein through fish farming 2022-12-01 2023-05-31 MWK 15000000.00
421 MW-KDC-311881-CW-RFQ construction of Kamboni Police staff houses
implementation
construction construction of Kamboni Police - two staff houses To enhance security in kasungu west constituency 2022-12-01 2023-05-31 MWK 75600000.00
429 001/4109/02/22/107 Construction of senior chief Lukwa house
implementation
construction Construction of senior chief Lukwa house To promote local governance through provision of chief housing 2023-01-09 2023-06-30 MWK 62597322.30
433 001/4109/10/22/5106 construction of Senior chief Kapelura house
implementation
construction construction of Senior chief Kapelura house To promote local governance through construction of chief houses 2023-01-09 2023-06-30 MWK 67551166.55
438 001/4109/10/22/510 Construction of Dwelling House for Chief Kaluluma
implementation
construction Construction of Dwelling House for Chief Kaluluma To enhance local governance through the provision of chiefs housing 2023-01-09 2023-06-30 MWK 67551166.55
453 001/GESD/53089/10/21/700 Construction of Malosa TDC
implementation
construction construction of Malosa TDC to improve education standards To support teacher's professional growth, improving teaching practices and ultimately enhancing the quality of education 2021-12-01 2022-05-31 MWK 25000000.00
455 001/GESD/53083/10/21/703 Construction of Mkhuta Bridge
implementation
construction Construction of Mkhuta 2 span concrete bridge To ease mobility of the people in Kasungu west -Lifupa ward at Magwazu ADC 2021-12-01 2022-03-31 MWK 20000000.00
458 001/GESD/53084/10/21/704 completion of Mphomwa health center and construction of staff house
implementation
construction completion of Mphomwa health center and construction of staff house To improve health service delivery among the popultaion in Kasungu North West - Matenje ward 2021-12-01 2022-03-31 MWK 30000000.00
461 001/GESD/53082/10/21/705 Construction of Ofesi health center OPD
implementation
construction Construction of Ofesi Health Center OPD at Kasungu North North East - Mpeni ward To improve health delivery among the people living at Kasungu north north east constituency - Mpeni ward 2021-12-01 2022-03-31 MWK 40000000.00
464 001/DDF/53089/10/21/710 Construction of 2 span Chiloza bridge
implementation
construction construction of 2 span Chiloza bridge To easy mobility and connectivity to people of Kasungu north east constituency - Mbongozi ward 2021-12-01 2022-03-31 MWK 40000000.00
465 001/DDF/53087/10/2`1/708 Construction of Chinyama Health center staff house
implementation
construction construction of Chinyama Health Center staff house To improve health service delivery through provision of decent houses to medical personnel 2021-12-01 2022-03-31 MWK 15000000.00
467 001/DDF/53088/10/21/707 construction of Gogode Health center maternity wing
implementation
construction construction of Gogode maternity wing in kasungu central- Chipala ward To improve health service delivery and reduce maternal mortality rate To reduce congestion at Kasungu district hospital 2021-12-01 2022-03-31 MWK 40000000.00
468 001/DDF/53081/10/21/706 Rehabilitation Lodjwa Health center maternity wing
implementation
rehabilitation construction Lodjwa Health center maternity wing To improve health service delivery especially among women of reproductive age group. 2021-12-01 2022-03-31 MWK 20000000.00
473 KUMC/RRB/7/2022-2023/16 ROAD RESHAPING FROM GOD IS GOOD SHOP TO PCCM CHURCH
completion
construction The project involves forming a road camber and unlined drainage systems using labour intensive To improve accessibility of communities within the ward 2022-07-06 2024-03-31 MWK 996810.00
227 LCC/1/pw Drainage improvement at sese 24 ward
completed
construction Drainage improvement at sese 24 ward there was construction of drains and culverts to improve drainage system 2022-09-01 2023-11-30 MWK 5828550.00
228 LCC/1/pw Construction of footbridge at mosque in area 24
completed
construction Construction of footbridge at mosque in area 24 Construction of footbridge at mosque in area 24 2023-02-23 2023-04-24 MWK 13525475.25
305 DADC/MLG/CNGCSA/W/2021-2022 Completion of social amenities( community ground, hall, library and bus depot)
implementation
construction construct, hall library and bus depot and its associated works to improve the social well being of individuals at Nambuma growth center 2022-03-04 2022-10-21 MWK 618353349.71
329 PPDA/01/1/2022 Partition of JIREH house into PPDA offices electrical works
completion
construction partitioning of building and associated works To provide more working space for the PPDA members of staff 2022-05-23 2022-06-10 MWK 45338902.50
384 NS/IPDAC/22/RFQ/WKS/02 Electrification of Malomo Rural Growth Centre Market
completed
construction Constructing all infrastructure to allow for electricity connectivity. To have access to electricity at the trading centre for diverse businesses that cater community members. 2022-03-26 2022-04-15 MWK 16500000.00
395 NS/IPDAC/WKS/2021-22/01-LOT 3 Masangano Classroom block
completed
construction Construction of a classroom block at Masangano to cater to 120 students To increase the number of classrooms and reduction in Pupil congestion. 2021-12-29 2022-03-31 MWK 32815617.00
484 70263/24320 Improved Access of Primary Health Service Delivery Project (Construction of 55 Health Posts)
implementation
construction Involves the construction of a Health Post OPD Building and 2 Staff houses with solar system and water reticulation The Project was designed to improve the accessibility of primary level health services to the underserved people. 2022-04-01 2025-12-31 MWK 12800000000.00
485 XXXXX Renovate laboratories to allow molecular testing (Conventional PCR)
preparation
rehabilitation The Project involves the renovation of laboratories in 3 District Hospitals to allow allow molecular testing (Conventional PCR) The Project will improve diagnostic capacity of District Hospitals to allow molecular testing 2022-03-01 2025-12-31 USD 150000.00
487 RA/MAI/NR/2022-2023 The Road and Bridge Maintenance Programme for the 2022/23 NORTH 2
implementation
rehabilitation The Road and Bridge Maintenance Programme for the 2022/23 Financial Year works consist of Sectional Periodic Maintenance, Rehabilitation, Retainer Pothole Patching, Emergency and Urgent works, Routine Term Maintenance; Grading and Reshaping of Trunk, Urban and District Roads and Associated Drainage Works Sectional Periodic Road Maintenance 2022-12-01 2023-12-01 MWK 4912390954.35
488 0011 Construction of Phalombe District Hospital
completed
construction The project involves the construction of a 250-bed capacity hospital with different structures like an administration block, an Outpatient Department, Maternity block, X- Ray block, Paediatrics, Nutrition and rehabilitation unit, Kitchen and Laundry, Laboratory, Maternal and child health, Mortuary, Staff houses, External works like incinerators, Gas plant, amongst other structures. improve access to health care services 2011-01-01 2022-10-11 USD 22756242.83
489 002 Construction of the Lilongwe Institute of Orthopedic and Neurosurgery (LION)
completed
construction The project involved the construction of an orthopedic and Neurosurgery centre at the Kamuzu Central Hospital. The LION Trust is responsible for sourcing funds for the facility. improve health service delivery 2016-01-01 2023-04-28 USD 32000000.00
490 RA/CON/2019-20/02 Multinational Nacala Road Corridor Development Project Phase V: Feasibility Study, Detailed Engineering Design for the Rehabilitation of Mangochi - Chiponde Road
implementation
rehabilitation Design for the Rehabilitation of Mangochi - Chiponde Road The development and growth of the economy 2022-08-18 2023-06-07 USD 421506.50
491 P-MW-DB0-022 Multinational Nacala Road Corridor Development Project Phase V: Consultancy Services for Design Review and Supervison of Nsipe - Chingeni - Liwonde Road Rehabilitation
implementation
rehabilitation Consultancy Services for Design Review and Supervison of Nsipe - Chingeni - Liwonde Road Rehabilitation The development and growth of the economy 2022-09-26 2023-05-21 USD 263050.00
492 "DODMA/WOR/2019/05A (Design Phase)" Detailed Engineering Design and Construction Supervision Services of Selected Bridges on Mangochi – Makanjira Road
implementation
rehabilitation Design Phase To produce a safe bridge that is elegant and satisfies all functionality requirements. 2022-06-28 2022-12-31 USD 254299.53
493 RA/DEV/RU-CP/2021-22/06w Consultancy Services for Feasibility Study and Detailed EngineeringDesign for Upgrading of Rumphi- Nyika - Chitipa (M009) Road - LOT 1: Gamba Gate - Chitipa
implementation
rehabilitation Detailed Engineering Design for Upgrading of Rumphi- Nyika - Chitipa (M009) Road - LOT 1: Gamba Gate - Chitipa Roads open up more areas and stimulate economic and social development 2022-11-04 2023-11-09 MWK 324438000.00
494 RA/DEV/BT-LL/2021-22/10 Consultancy Services for Feasibility Study and Detailed Engineering Design for Capacity Improvement of Blantyre - Lilongwe (M001) Lot 2: Lunzu - Junction with M002 Road
implementation
rehabilitation Feasibility Study and Detailed Engineering Design for Capacity Improvement of Blantyre - Lilongwe (M001) Lot 2: Lunzu - Junction with M002 Road Roads open up more areas and stimulate economic and social development 2022-12-02 2023-04-21 MWK 1180342.50
496 MDC/GESD/MAKILINDENI/2022-23/006 Construction of Water Supply at Makilindeni
implementation
construction Construction of a Solar Powered Water Supply at Makilindeni to supply nearby Schools To provide clean portable water to the schools 2023-02-07 2023-04-08 MWK 18275008.36
498 CPDC/15/12/2022 Construction of Teacher's House at Namutegha Primary School
completion
construction Construction of the modern teacher's house at Namutegha Primary School To provide a conducive habitable dwelling residence for teachers hence reducing the pupil-teacher ratio and consequently improving the educational attainment of learners 2022-12-22 2023-03-22 MWK 30422465.36
499 Chintheche Chintheche Kiosks
completion
construction Construction of chintheche kiosks for the business operations for commercial activities 2023-01-14 2023-06-14 MWK 23000000.00
503 MDC/GESD/EKWENDENI P UNIT/2022-23/002 Construction of Ekwendeni Police Unit
implementation
construction The project involves construction of a police unit and provision of furniture To provide security to Ekwendeni and surrounding communities and the general public 2023-03-07 2023-05-06 MWK 63042539.21
506 MCC/ROADS/PP/23/01/26 A LOT 1 POTHOLE PATCHING AND ASSOCIATED DRAINAGE WORKS
implementation
rehabilitation The project shall involve pothole patching which consists of pothole cuttings, pinning, backfilling with subbase or base material and asphalt and also culvert cleaning and drain cleaning. The Council would like to recondition the status of the roads and improve some drainage system. 2023-03-15 2023-06-15 MWK 36024950.00
508 MDC/NCB/GESD/2021-22/02 Construction of Khosolo Police Unit Block
completed
construction Construction of a police unit at Khosolo. To improve security levels around Kholoso. 2021-12-19 2022-03-19 MWK 23203057.56
510 CPDC/11/02/2023 Construction of teachers house at Kavumulo Primary School
implementation
construction Construction of a modern teachers' house The project will provide decent accomadtion to a teacher which will in turn improve the learning outcome of learners as the pupil-teacher ratio gets reduced 2023-01-17 2023-05-17 MWK 30422000.00
514 CPDC/29/11/22d Construction of a teacher's house at Nkhanga Primary School
implementation
construction The project will involve the construction of a modern teacher's house The project will accord a teacher with a conducive dwelling unit which will not only motivate the teacher but also aid in improving the learning outcomes at the school by learners 2022-12-06 2023-03-06 MWK 26702567.80
517 Slaughter House Construction of Slaughter house at Nkhata-bay
completion
construction There was no animal slaughter at the Nkhata-bay Boma to improve on the animal health and tract animal-human communicable diseases 2023-01-14 2023-06-14 MWK 45000000.00
518 Kamwala Construction of Kamwala under-5 clinic and staff hous
completion
construction Construction of staff house and completion of under five clinic at Kamwala in upper Zilakoma to improve health service delivery 2023-01-14 2023-06-14 MWK 48084566.66
519 MDC/NCB/GESD/2021-22/09 Renovation of clinic and staff house completion at Wateleka Health Post
completed
rehabilitation Rehabilitation of an existing health post building and completion of a staff house. Improve health outcomes of people in the area by reducing the distance Mzimba district hospital. 2021-12-20 2022-02-18 MWK 15478603.00
521 Bugano CDSS Staff house Completion of Bungano staff house
completed
rehabilitation Completion of Bungano staff house To improve service delivery in education sector 2023-01-14 2023-06-14 MWK 4500000.00
523 Chiwisi School Block completion of Chiwisi School brock
completed
replacement the school block was reaped off due to heavy rains to improve the welfare of the students at the institution 2022-01-14 2022-06-14 MWK 4500000.00
526 MCC/ROADS/CUL/IDF/2022/10/01 CULVERT LINE CONSTRUCTION AND MAINTANANCE IN ZOLOZOLO WARD, CHIBANJA, NKHORONGO AND MCHENGAUTUBA WEST WARD
implementation
construction Contruction and Maintenace of various culverts in the aforementioned areas To improve connectivity and mobility 2023-01-25 2023-06-25 MWK 38173850.00
527 MDC/NCB/GESD/2021-22/010 High Yielding Borehole Drilling
completed
construction Bore hole drilling, pump installation and related civil works at Yachema Chirwa Village, Kadozo-Mguntha Village, Watereka Health Post, Vibangalala Health Post and Wateleka Health post. To provide easy access to portable water people of Yachema Chirwa Village, Kadozo-Mguntha Village, Watereka Health Post, Vibangalala Health Post and Wateleka Health post. 2022-01-18 2022-02-02 MWK 14853875.00
528 MCC/ROADS/GRAV/IDF/10/03 SPOT GRAVELLING AND DRAINANAGE IMPROVEMENT IN CHIPUTULA, CHIBAVI EAST, AND CHIBANJA WARD
preparation
rehabilitation Execution of spot gravelling and drainage improvement in the aforementioned areas To improve mobility and transportation of agricultural produce and merchandise. 2023-01-25 2023-06-25 MWK 33593250.00
530 Mpamba Mpamba additional market sheds
completed
construction construction of market sheds at Mpamba to improve commercial activities 2021-03-16 2021-08-16 MWK 19268328.77
532 Chintheche Construction of Brick Perimeter Fence, 2 Market Sheds, Refuse Bank and Kiosks at Chintheche Market
completed
construction Construction of Brick Perimeter Fence, 2 Market Sheds, Refuse Bank and Kiosks at Chintheche Market To improve commercial activities 2022-01-14 2022-06-14 MWK 40000000.00
525 MDC/NCB/GESD/2021-22/09 Installation of solar and grid powered pumping system at Vibangalala and Wateleka Health Posts
completed
construction Installing solar and grid powered pumping system at Vibangalala and Wateleka Health Posts. To improve water supply at Vibangalala and Wateleka Health posts. 2021-12-19 2022-02-17 MWK 16066443.21
515 MDC/NCB/GESD/2021-22/08 Construction of Mbalachanda Police Unit Block
completion
construction Construction of police unit and double hole pit latrine using cement blocks. Improving security levels in the surrounding area. 2021-12-19 2022-02-27 MWK 23203057.56
511 MDC/NCB/GESD/2021-22/04 Njuyu EPA Office
completed
construction Construction of an EPA office at Njuyu To improve agricultural extension service delivery in the area. 2021-12-19 2022-02-17 MWK 21500000.00
500 MDC/NCB/GESD/2021-22/07 Construction of Vibangalala Maternity Wing
completed
construction Construction of a maternity wing at Vibangalala in TA Vibangalala. The project focusses on reducing the distance thereby improving the accessibility of maternal health services. 2021-12-21 2022-03-21 MWK 49188877.22
509 MDC/GESD/LUWELEZI/2022-23/009 Construction of Maternity Wing at Luwelezi Health Centre
implementation
construction The project involves construction of maternity block, incinerator, placenta pit and provision of furniture To improve health delivery services 2023-02-07 2023-06-07 MWK 124237098.88
516 MDC/GESD/CHIPHO/2022-23/011 Construction of School Block at Chipho Primary School
implementation
construction The project involves construction of a double classroom block and double VIP toilet To improve teaching and learning environment 2023-02-07 2023-04-08 MWK 43371919.47
534 Mzenga Mzenga foot bridge
completed
construction Construction of Mzenga foot bridge connecting Mzenga and Chiwawani To prmote trade by facilitating easy transportation 2021-12-07 2022-03-07 MWK 11799814.00
535 Makumbo Construction of Makumbo satff house
completion
construction The constrcution of the satff house at Makumbo will facilitate easy service delivery as the community will have readily available health personnel It is meant to reduce avoidable death which are often due to long distance traveled in accessing the health services. 2021-12-14 2022-04-01 MWK 27699975.81
536 Usingini-Usisya Installation of Usingini-Usisya water pipe line
cancelled
expansion The project was meant to improve safe , potable and hygiene water accessibility among households in Usisya To promote accessibility to safe, potable and hygiene water accessibility among households in Usisya 2023-01-14 2023-06-14 MWK 35237075.00
537 Chituka Chituka Dispensary equipment
completed
replacement The community will have no more problem of traveling long distance to acquire the health services The community will have no more problem of traveling long distance to acquire the health services 2022-05-05 2022-06-05 MWK 8059460.00
497 Mpamba Mpamba market sheds
completion
construction there is construction of market sheds at mpamba market in order to promote commercial activities to promote commercial activities 2023-01-14 2023-06-14 MWK 60000000.00
542 BCC/W/Chi-Mpe-Bypass/2017-18 Upgrading to Asphalt Surface of Chigumula to Mpemba By pass
implementation
construction Upgrading to Asphalt Surface of Chigumula to Mpemba By pass Transportation 2018-02-28 2021-10-20 MWK 4662335485.00
543 Construction of North Road Construction of North Road- Market street (Behind Limbe Escom) 0.5 Km- LOT 5
implementation
construction Construction of North Road- Market street (Behind Limbe Escom) 0.5 Km- LOT 5 Transportation 2021-04-21 2022-03-15 MWK 465423689.06
544 Rehabilitation of Kapeni road- Mahatma Ghandi Rehabilitation of Kapeni road- Mahatma Ghandi in Blantyre City (0.8 km)- Lot 4
completed
construction Rehabilitation of Kapeni road- Mahatma Ghandi in Blantyre City (0.8 km)- Lot 4 Trasportation 2021-04-21 2022-02-14 MWK 454670253.00
545 BCC/RFA- Construction of Chilobwe- Stella maris Road in Blantyre City-Lot 6
completed
construction Construction of Chilobwe- Stella maris Road in Blantyre City-Lot 6 Transportation 2021-04-21 2022-02-14 MWK 758792250.30
547 Construction of Namiwawa-Sunnyside (Bank road and Smythe road (2Km)) Construction of Namiwawa-Sunnyside (Bank road and Smythe road (2Km))
implementation
construction Construction of Namiwawa-Sunnyside (Bank road and Smythe road (2Km)) Transportation 2022-02-21 2022-08-20 MWK 1862160202.88
548 Construction of Lali Lubani road across Masauko Chipembere highway via Malawi Polytechnic Village-Kenyatta drive (1.7 Km)) Construction of Lali Lubani road across Masauko Chipembere highway via Malawi Polytechnic Village-Kenyatta drive (1.7 Km))
implementation
construction Construction of Lali Lubani road across Masauko Chipembere highway via Malawi Polytechnic Village-Kenyatta drive (1.7 Km)) Transportation 2022-02-21 2022-08-20 MWK 1791304627.80
549 Construction of Chipatala Avenue-Kamba (1.2Km) Construction of Chipatala Avenue-Kamba (1.2Km)
implementation
construction Construction of Chipatala Avenue-Kamba (1.2Km) Transportation 2022-02-21 2022-08-20 MWK 1343621469.75
550 Construction of Newlands-Manje via Chiwembe Road (2Km) Construction of Newlands-Manje via Chiwembe Road (2Km)
implementation
construction Construction of Newlands-Manje via Chiwembe Road (2Km) Construction of Newlands-Manje via Chiwembe Road (2Km) 2022-02-21 2022-08-20 MWK 1635220587.63
551 BCC/CDF- Construction of Michiru road-Likhubula (Black box) (1.5 Km)
implementation
construction Construction of Michiru road-Likhubula (Black box) (1.5 Km) Transportation 2022-02-21 2022-08-20 MWK 1375922853.90
552 PSIP 2216 Kholongo Multipurpose Dam (Water Supply and Irrigation) for Mponela Town and surrounding areas
implementation
construction The project involves the construction of a multipurpose dam, development of a water supply system, development of an irrrigation system and development of fish farms. The Multi-Purpose Dam shall be a source of water for domestic and industrial consumption, irrigation, fish farming, tourist activities and as well as maintaining environmental flows. The areas that are earmarked to be supplied with potable water by the Dam construction include Mponela Town and other surrounding areas including Mtiti, Madisi, Kanyungu, Kawele, Chimungu, Ndiliro Trading Centres. The purpose of the project is to increase access to potable water supply to over 153,000 people in Mponela town and surrounding areas, improve water reliability to 24 hours a day in Mponela town and surrounding areas, and Improve food security and community livelihood to 4,400 households around the project area through irrigation and fish farming 2023-02-23 2026-02-24 MWK 67444214703.95
512 Council Rest house Rehabilitation of Nkahata-Bay council Rest house
completion
rehabilitation The rehabilitation of Coucil Rest house increase the profit of the enterprise 2023-01-14 2023-06-14 MWK 41746806.00
553 PSIP 2216 Construction of Kholongo Multipurpose Dam (Water Supply and Irrigation) for Mponela Town
implementation
construction The project involves construction of a multipurpose dam, development of a water supply system, development of an irrigation system and development of fish farms. The Multi-Purpose Dam shall be a source of water for domestic and industrial consumption, irrigation, fish farming, tourist activities and as well as maintaining environmental flows. The areas that are earmarked to be supplied with potable water by the Dam construction include Mponela Town and other surrounding areas including Mtiti, Madisi, Kanyungu, Kawele, Chimungu, Ndiliro Trading Centres. The purpose of the project is to increase access to potable water supply to over 153,000 people in Mponela town and surrounding areas, improve water reliability to 24 hours a day in Mponela town and surrounding areas, and Improve food security and community livelihood to 4,400 households around the project area through irrigation and fish farming. 2023-02-23 2026-02-24 MWK 67444214703.95
554 PSIP 2108 Dowa Supply and Sanitation Project
preparation
construction The project will involve the upgrading and expansion of the existing water supply system in Dowa Town and surrounding areas and provide access to improved potable water supply and sanitation services. The purpose of the project is to contribute to the economic development of the country by improving the health and livelihoods of the residents of Dowa Town and its surrounding areas. The main objective is, by 2035, to increase access to reliable and sustainable potable water supply and improved sanitation services for the socio-economic growth of over 150, 120 people of Dowa Town and surrounding areas 2023-08-01 2025-07-31 USD 32000000.00
559 ZCC/DFLA/SHOPS/ENG-FLEA-MARKET/2022-2023/1 CONSTRUCTION OF FLEA MARKET SHOPS
implementation
construction Construction of Shops at Flea Market Increase City Revenue base and economic activities 2023-03-24 2023-09-20 MWK 204016347.27
560 06/2020 Construction of 10,000 Houses for Security Institution Phase 1
implementation
construction The 10,000 housing for security institutions project is a national initiative by the Government of Malawi, through the Ministry of Lands, Housing and Urban Development, to provide decent accommodation for the members of the Malawi Police Service, the Malawi Defence Force, the Malawi Prison Service and the Department of Immigration and Citizenship Services. The 10,000 housing for security institutions project is a national initiative by the Government of Malawi, through the Ministry of Lands, Housing and Urban Development, to provide decent accommodation for the members of the Malawi Police Service, the Malawi Defence Force, the Malawi Prison Service and the Department of Immigration and Citizenship Services. 2021-04-01 2025-03-31 MWK 3500000000.00
561 06/2020 Construction of 10,000 Housing Units Phase 2
preparation
construction The 10,000 housing for security institutions project is a national initiative by the Government of Malawi, through the Ministry of Lands, Housing and Urban Development, to provide decent accommodation for the members of the Malawi Police Service, the Malawi Defence Force, the Malawi Prison Service and the Department of Immigration and Citizenship Services. The 10,000 housing for security institutions project is a national initiative by the Government of Malawi, through the Ministry of Lands, Housing and Urban Development, to provide decent accommodation for the members of the Malawi Police Service, the Malawi Defence Force, the Malawi Prison Service and the Department of Immigration and Citizenship Services. 2021-04-01 2025-03-31 MWK 3500000000.00
595 MAZA Malawi-Zambia Transmission Interconnection Project
preparation
construction The 400kV Malawi-Zambia Interconnector Project will involve constructing a 400kV power line from the 400/132kV Nkhoma Substation in Lilongwe in Malawi to the existing Chipata West 330/132kV substation in Zambia. The total line distance is approximately 184 km out of which 40km is in Zambia and 144km is in Malawi. ZESCO has indicated its intention to upgrade the Chipata substation to 400kV To strengthen security of supply through Reginal power interconnection 2018-01-01 2020-05-30 USD 1000000.00
597 EPC Plus F-Government of Malawi/ESCOM 132kV Eastern Backbone Overhead line Project
preparation
construction 1. Construction of a 293km 132kV line from the 400/132kV Nkhoma Substation in the Central Region through 132/33kV Nanjoka Substation (Salima), 132/66/33kV Nkhotakota Substation, and 132/33kV Dwangwa Substation to 132/66/33/11kV Chintheche Substation in the Northern Region. 2. Construction of an 83km 132kV line from Nkhotakota substation to Chinyama substation to replace the existing 66kV line which is on wooden structures and uses very small conductor leading to high losses and poor quality of supply. Among other customers, Chinyama substation supplies Shayona Cement Company who have applied for additional load of 6MW and it is impossible to supply them with the existing line, hence the need for upgrading. Chinyama substation will be upgraded from 66/33kV to 132/33kV. 3. Construction of a 43 km 132kV line from Chinyama substation to Kanyika and construction of a 25MVA, 132/33kV substation at Kanyika to supply an 18 MW Niobium mine. The substation will also be connected to the existing 33kV network in the area to improve power quality and operational flexibility. 4. Upragding of Nanjoka 132/33kV substation capacity from 15 MVA to 50 MVA to accommodate a 22MW water pumping project from Lake Malawi in Salima to Lilongwe City. The substation is currently loaded up to more than 80% of its capacity at peak. Apart from the water pumping project, the substation will also supply several other step loads from customers who applied for power such as the Salima Sugar factory which will require 12MW additional load from Nanjoka substation. Apart from the JCM 60MW Solar PV plant which is connected to this substation, the substation is also earmarked to be the connection point for two more independent power producers namely, a 20MW Solar PV plant by EGENCO and a 75MW Multi-Fuel Powered generation thermal plant by AZA. This project aims to upgrade the existing Transmission network which carries power from the Southern to the Central and Northern Regions. This network can no longer sustain growth in Power and Energy demand due to its current condition.As one of the measures to increase power transfer capacity and propel economic growth, a project to construct a new single circuit 132kV Transmission Line on the Eastern Corridor of the country from the Central to the Northern Region to replace an existing single circuit Wooden Pole 132kV Transmission line has been initiated. 0202-01-01 2026-06-30 USD 101000000.00
596 LLW-JICA Project for the improvement of substations In Lilongwe city
implementation
expansion The Governments of Japan and Malawi signed a Grant Agreement where the Japanese Government, through Japan International Cooperation Agency (JICA), is financing a project to rehabilitate and upgrade Kanengo (Lilongwe B) and Old town (Lilongwe A) transmission substations in the Central Region. At Kanengo 132/66/33/11kV substation, several transformers with their attendant switchgear will be replaced by new and higher rated ones and a new 11kV control room will be constructed. At Old town 66/33/11kV substation, a new substation will be constructed with a new control room and switchgear to replace the existing substation. To increase capacity of Transformers at kanengo and old town substations thereby allowing an increase on customers. 2022-06-01 2024-12-30 JPY 2610000000.00
594 MEAP Malawi Electricity Access Project
implementation
expansion With financing from World Bank, ESCOM is undertaking the on-grid connection of additional 180,000 customers in 4 years. This would bring the Malawi on- Grid electricity access rate to around 30% by 2030, from 12% as at the start of the project in 2020. The main objective aims at increasing on-Grid electricity access to 30% by 2030, thereby bringing the total electricity access rate for the Country to 50% by 2030. 2020-01-01 2024-06-30 USD 65000000.00
600 ESSP-PERI URBAN PERI URBAN NETWORK REINFORMENT PROJECT
preparation
expansion The project will extend Distribution network to mushrooming peri urban settlements To expand the distribution network and increase access to electricity 2024-01-01 2026-01-31 MWK 34500000000.00
601 ZCC/DFLA/SHOPS-SHOPRITE/2022/2023/2 Construction of Commercial Shops along Namiwawa Road
implementation
construction Construction of single storey commercial shop located opposite Old shoprite Expanding revenue base as well as increasing trade surface to ensure continued local economic activity. 2023-05-28 2023-09-24 MWK 424759399.25
593 MOMA Mozambique-Malawi 400KV Transmission Line Interconnection Project (MOMA)
implementation
construction Mozambique-Malawi 400KV Transmission Line Interconnection Project (MOMA) The aim is to establish a power transmission link between Mozambique and Malawi to meet increasing electricity demand in Malawi, and to create opportunities for trading in the Southern African Power Pool (SAPP). 2021-11-03 2023-12-31 USD 24704085.00
598 ESCOM OFFICE COMPLEX Detailed Design and Construction of ESCOM office complex
preparation
construction Architectural designs, conceptual designs, preliminary engineering designs and detailed designs for Construction of ESCOM office Complex in Blantyre. To execute architectural designs, conceptual designs, preliminary engineering designs and detailed designs 2021-06-01 2022-01-31 MWK 775000000.00
602 WC/UNIMA/03/01/23 Construction of Prefabricated Classrooms Blocks
implementation
expansion Construction of Prefabricated Classroom Block and Associated External Works To cater for double cohort admission undertaken as a mitigation measure against Covid-19 2023-08-31 2024-03-05 MWK 3000000000.00
541 BCC/W/Dual Carriageway/2017-18 Dualisation of Clock Tower to Kameza Roundabout
implementation
construction Dualisation of Clock Tower to Kameza Roundabout Transportation 2006-10-09 2031-06-20 MWK 11411957489.70
608 BCC/Projects Construction of drainage System and Associated Works in Blantyre City
implementation
construction Construction of drainage System and Associated Works in Blantyre City Drainage improvement 2023-05-05 2023-10-06 MWK 1415757289.91
609 BCC/RFA- Construction of Ndirande - Nkolokoti (Makheta) Road to Asphalt Surface in Blantyre City - Lot 3
implementation
construction Construction of Ndirande - Nkolokoti (Makheta) Road to Asphalt Surface in Blantyre City - Lot 3 Provide access 2022-08-03 2023-11-10 MWK 3042438188.79
611 BCC/RFA- Pothole Patching and Associated Routine Maintenance Works on Selected Urban Paved Roads in Blantyre City -Limbe Area-LOT 2
completed
rehabilitation Pothole Patching and Associated Routine Maintenance Works on Selected Urban Paved Roads in Blantyre City -Limbe Area-LOT 2 Improve road condition 2023-02-13 2023-06-12 MWK 150654137.81
615 SRWB/ICB/BP/2022-23 SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF WATER BOTTLING PLANT AND RELATED ACCESSORIES
implementation
construction Supplying of the treatment and bottling equipment and the construction of the building to accommodate the equipment and offices To supply bottled water in the country 2023-04-27 2023-10-26 USD 2066683.17
616 ZCC/RFA/ENG/BRI/2022-2023/01 CONSTRUCTION OF NAPHAMBO BRIDGE
implementation
construction Construction of 32 metre TWO Span Concrete Bridge Connecting communities from Thundu and sorrounding area to ThomAllan Matawale area across Likangala river for trade, social and health services 2023-06-13 2023-12-10 MWK 469063787.50
622 BDC/RFQ/DDF/2020-2021 Construction of Kwitanda Maternity Wing
completed
construction Construction works of Kwitanda Maternity Wing block and construction of a placenta pit to improve health service delivery 2021-06-03 2022-10-31 MWK 59452412.20
627 P165704 Mpatamanga Hydropower Project
preparation
construction The Government of Malawi through the Ministry of Energy and EGENCO as implementing agencies is targeting the development of a 350 megawatt (MW) hydropower project (HPP) at Mpatamanga Gorge on the Shire River in southern Malawi. The objective is to increase Hydro Power generation capacity through a Public Private Partnership in Malawi. 2024-04-01 2029-03-31 USD 0.00
629 EGC315/EOI/CS/FY2023-2024 CHIZUMA AND CHASOMBO HYDROELECTRIC PROJECT
preparation
construction EGENCO intends to explore combining Chizuma and Chasombo into one power plant with an aggregate capacity of 83MW. Increase Hydro Power capacity of Malawi and diversify away from the Shire River Cascade. 2023-01-01 2033-03-31 MWK 0.00
631 MW-MDC 318973-CW-RFQ Construction of Boma Shops
completed
construction Constructing 5 shops and completing toilet block that was at window level. Revenue generation for the council 2023-01-18 2023-05-18 MWK 60699999.76
632 SRWB/W/22/01 REHABILITATION AND MAINTENANCE OF NEW SOUTHERN REGION WATER BOARD HEAD OFFICE
implementation
rehabilitation Rehabilitating and maintaining of new Southern Region Water Board head Office Office accommodation 2022-08-22 2023-02-23 MWK 789155952.23
599 BESS Utility Scale Battery Energy Storage System
preparation
expansion The project entails the design, procurement, installation and commissioning of a BESS facility to be used primarily for frequency control, ancillary services and other grid support applications. The project will also include integration of the BESS into ESCOM’s system operations. The goal of this project is to enable integration of variable renewable energy sources into Malawi’s national grid and therefore improve electricity access to about six hundred thousand (600,000) households and industries connected to the national grid. 2023-01-01 2024-12-31 USD 20245000.00
640 MW-ZADC-316656-CW-RFB MWAMBO YOUTH CENTER
implementation
construction Construction of Mwambo Youth Center in Chilunga 2 VDC T/A Mwambo to create a conducive environment for youth 2023-04-01 2023-07-30 MWK 58773913.00
642 175d493d Chang’ambika Girls hostel and supply of furniture
implementation
construction Construction of Girls hostel To improve Girls access to education 2023-02-03 2023-05-04 MWK 83914116.00
643 52579d5c Mitondo HSA House
implementation
construction Construction of Mitondo HSA House To improve health service delivery through provision of staff houses to accommodate health workers 2023-02-02 2023-05-03 MWK 33266851.00
644 3e9b93fb Chapananga Police Unit
implementation
construction Construction of Chapananga Police Unit Improve security for the area and community 2023-02-01 2023-05-02 MWK 79994226.06
646 bce2094d Njereza CDSS Classroom block and procuring of furniture
implementation
construction Construction of Njereza CDSS Classroom block and procuring of furniture Improve quality education services through construction of classroom block to accommodate learners 2023-02-03 2023-05-04 MWK 60000000.00
648 a89cf1d6 Konzere CDSS Classroom Block and Supply of Furniture
implementation
construction Construction of Konzere CDSS Classroom Block and Supply of Furniture Improve quality education services through construction of a classroom block 2023-02-03 2023-05-04 MWK 66047461.81
650 017a8186 Tizola Martenity Wing and Supply of furniture
implementation
construction Construction of Tizola Martenity Wing and Supply of furniture Improve primary health service delivery 2023-02-03 2023-05-04 MWK 120000000.00
651 LMC/IPDC/2023-24/W/002 COMPLETION OF FIVE KIOSKS AT CRAFT CENTRE
implementation
construction we are remaining with the following activities: roofing, B- Filling, wiring and electrification,plastering, cementing and painting commercialization 2023-09-17 2023-12-16 MWK 12433547.50
655 d0a8b04a Makala Teachers House
implementation
construction Construction of Makala Teachers House Improved education service delivery through construction of a teachers house 2023-02-03 2023-05-04 MWK 37034265.10
656 MW-ZADC-316656-CW-RFB CHINGALE MATERNITY WING
implementation
construction Construction of a maternity wing Construction of a maternity wing with aim to host expecting mothers 2023-03-01 2023-06-30 MWK 140104498.67
657 MW-MJDC-316546-CW-RFB Construction of Chanunkha CDSS School Blocks and furnishing with students desks and teachers chairs and desks
completed
construction The project involved construction of a classroom block furnished with desks To enable students learning in a contusive environment 2022-11-07 2023-01-08 MWK 58940486.46
659 b46e74ad Chikwawa Community Ground Fence
implementation
construction Construction of Chikwawa Community Ground Fence Improve sports development Increase Council revenue generation 2023-02-02 2023-05-03 MWK 98000000.00
662 3ff0e6a8 Chilongoma Primary School Classroom Block and Supply of furniture
implementation
construction Construction of Chilongoma Primary School Classroom Block To improve education service delivery through construction of classroom block 2023-02-16 2023-05-17 MWK 58761957.75
666 RFQ/ZADC/DDF/2022/2023/03 NACHUMA MARKET SHADE
implementation
construction Construction of a market shade to create a conducive environment for trading 2023-03-01 2023-05-30 MWK 34268280.75
668 BDC/DDF/W/2023-2024/055 Construction of Mgomwa Market Shed
implementation
construction Construction of the market Shed, and double hole VIP Toilet Improve Market Infrastructure, sanitation and hygiene 2023-06-19 2023-09-19 MWK 25319254.50
669 NEDC/DDF/W/2223-03 Completion of Mchacha 58 under five Clinic and a double door latrine
completion
construction Completion of Mchacha 58 under five Clinic and a double door latrine Delivery of health services 2023-03-28 2023-06-28 MWK 13938800.21
671 MW-ZADC-316658-CW-RFB REHABILITATION OF MAPHANDA NAPHALI ROAD
implementation
construction Rehabilitation and spot graveling of Maphanda Naphali road via matiya leveling and graveling of a 10km stretch for easy transportation 2023-06-01 2023-08-31 MWK 114876104.76
672 MW-MJDC-353803-CW-RFQ Construction of Cassava cooperative flour Factory
implementation
construction The project will involve the Construction of Cassava factory & installation of Cassava Processing Machine To increase agricultural productivity and adding value chain to famers agricultural produce 2022-11-07 2023-01-31 MWK 83827731.14
673 MNDC/W/06/22-23/62 Construction of Boma market flush toilet
completed
construction The project involves construction of a flush toilet at Boma market To improve sanitation at the market 2022-06-18 2022-08-24 MWK 15956640.00
674 NEDC/DDF/W/2223-03 Mbenje water reticulation
implementation
construction Mbenje water reticulation Water resource 2023-03-27 2023-06-27 MWK 202107.07
677 MW-MJDC-316542-CW-RFB Construction of Makazombo Bridge
completed
construction The project involved the Construction of Box Culvert at Makazombo river To ease transportation of goods and also ease the access to socio amenities. 2022-11-07 2023-01-31 MWK 36976798.00
680 NEDC/DDF/W/2223-05 Bangula market 2 (Double door toilets)
implementation
construction Zondola SchoolDouble door toilets Provide sanitation to market users 2023-01-08 2023-03-08 MWK 10450671.25
679 BDC/DDF/W/2023-2024/056 Construction of Balaka DHO Guardian Shelter
implementation
construction Construction of a Gurdian Shelter structure at Balaka District Hospital Improve delivery of Health Facilities 2023-06-20 2023-09-19 MWK 38141832.00
681 MW-ZADC-316658-CW-RFB CONSTRUCTION OF MATANDANI BRIDGE 1 & 2
implementation
construction construction of Matandani bridge 1 & 2 constructing concrete deck for easy passing of the streams 2023-03-01 2023-06-30 MWK 93028732.50
676 MW-MDC318986-CW-RFQ Construction of Kabango market shade
completed
construction The project will involve the construction of a new market shade. Revenue generation for the council 2023-01-18 2023-04-18 MWK 36791582.90
683 NEDC/DDF/W/2223-06 Lulwe Market (2 Single door toilets)
implementation
construction Lulwe Market (2 Single door toilets) Market services 2023-01-08 2023-03-08 MWK 10450671.25
685 MW-NEDC-316442-CW-RFB Construction of 2 market shades at Tengani market
implementation
construction Construction of 2 market shades at Tengani market Market shelter 2023-01-07 2023-03-07 MWK 43960835.65
687 MW-CZDC-316514-CW-RFB Construction of Ng'omba HealthPost
implementation
construction Roofed To improve Health Services Delivery 2023-03-02 2023-06-02 MWK 59954838.00
689 MW-NEDC-316455-CW-RFB Construction of fully furnished Alufandika Secondary School Classroom Block (Semidetached)
implementation
construction Construction of fully furnished Alufandika Secondary School Classroom Block (Semidetached) Education services 2023-01-07 2023-03-07 MWK 48051130.84
690 NLGFC-MoH-Works/2/2022 Rehabilitation of Balaka District Hospital OPD
implementation
rehabilitation Rehabilitation of existing structure that include modification of rooms, painting and ceiling, sanitary fittings and external works Improve access to health service 2023-06-14 2024-03-14 MWK 183784405.73
691 MW-NEDC-316641-CW-RFB Construction of fully furnished Mbenje Police Unit
implementation
construction Construction of fully furnished Mbenje Police Unit Security services 2023-03-28 2023-06-28 MWK 46331963.66
693 RFQ/ZADC/DDF/2022/2023/02 REHABILITATION OF COUNCIL CHAMBER
implementation
rehabilitation rehabilitation of council chamber at Zomba District Council offices to create a conducive environment for hosting meetings 2023-03-01 2023-05-30 MWK 25209391.19
694 MW-NEDC-316442-CW-RFB Installation of piped water at Sorgin Trading Centre (1Km with 5 Kiosks)
implementation
construction Installation of piped water at Sorgin Trading Centre (1Km with 5 Kiosks) Water sanitation 2023-03-27 2023-06-27 MWK 35571066.68
697 MNDC/W/02/2021-22/457 Construction of Border Flush Toilet
completed
construction Construction of 4 toilet rooms and 2 shower rooms Sanitation and revenue for the council 2022-03-15 2023-06-09 MWK 15930071.21
699 MW-NEDC-316452-CW-RFB Completion of fully furnished Mcherenje Primary School Classroom Block
completion
construction Completion of mcherenje fully furnished classroom block To provide a conducive environment for learning 2023-03-28 2023-06-25 MWK 33606010.46
700 ZDC/GESD/DDF/W/2021/2022/4 CONSTRUCTION OF NAMADIDI MARKET SHADE
implementation
construction Construction of market shade to create a conducive environment for trade 2023-03-01 2023-05-30 MWK 41342733.80
702 RFQ/MNDC/W/2021-22/28 Completion of Thambani Police staff house
completed
construction This project invlves completion of police staff housing at Thambani police unit which failed to completed year ago To reduce housing challenges among police officers 2022-10-01 2022-12-30 MWK 5500000.00
703 MW-NEDC-316454-CW-RFB Tengani Market Butchery and Slaughter house
completed
construction Construction of Tengani Market Butchery and Slaughter house To provide improved environment for business activities 2023-01-07 2023-03-07 MWK 47277913.50
704 MW-CZDC-316517-CW-RFB Construction of Yasini Market Shed at Likoswe
implementation
construction Construction of Market Shed To increase Council local revenue 2023-02-16 2023-06-02 MWK 33653700.00
638 MW - MDC 318994 - CW - RFQ Construction of Kalanga market shade
completed
construction The project will involve a new construction of a market shade This project is expected to provide conducive business environment for people around Kalanga and other business persons at the same time expanding the base for local revenue collected hence improving council economic sustainability 2023-01-18 2023-04-18 MWK 37609872.93
705 MW-CZDC-3353700-CW-RFB Construction of Nyandule Primary Classroom block
implementation
construction Construction of classroom block and toilet to reduce classroom-pupil ratio 2023-03-08 2023-07-08 MWK 62094784.00
706 MW-CZDC-335910-CW Chimwalira Health Post
implementation
construction Construction of health post provision of health service delivery 2023-03-08 2023-06-08 MWK 57969156.00
708 MW-MJDC-316546-CW-RFB 2 Construction of Waluma CDSS School Block 2 and furnishing it with students desks and teachers chairs and desks
completion
construction The project will involve the Construction of Waluma School block 2 and furnishing it with Desks To ease access to education to learners within the surrounding community. 2022-11-07 2023-01-31 MWK 58940486.46
709 MW-MJDC-316948-GO-RFB 1 Operationalization of Ndanga Maternity Wing
completion
expansion The project will involve the Supply and delivery of Medical equipment and supplies to Ndanga Maternity Wing for operationalization To ease access to care and health service delivery within the surrounding community 2022-11-07 2023-01-31 MWK 46999738.95
710 MW-MJDC-316542-CW-RFB Construction of Makala Concrete pads
completed
construction The project will involve the Construction of Concrete Pads on either sides of Makala road To ease transportation and communication 2022-11-07 2023-01-10 MWK 31488785.00
711 MW-MJDC-316541 Construction of (5) market toilets at Mizimu, Mwanakhu, Lauderdale and Chikuse and Chimbalanga
completed
construction The project involved the Construction of (1 ) double-hole market toilet at Mizimu, Mwanakhu, Chikuse, Lauderdale and Chimbalanga To enhance sanitation within the markets and also to increase revenue generation for the Council 2022-11-07 2023-01-31 MWK 23395840.00
712 MW-MJDC-316529-CW-RFB Rehabilitation of Tcherekere Irrigation Scheme intake weir 1
completed
rehabilitation The project was involving the Rehabilitation of Tcherekere Irrigation Scheme and the intake weir To increase crop production and crop diversification among surrounding communities 2022-11-07 2023-01-31 MWK 24738302.93
713 MW-MJDC-316534-CW-RFQ Construction of Ndanga Maternity Staff House , VIP toilet, Placenta pit, ash-pit and Incinerator 1
completion
construction The project is involving the Construction of a staff house, Pit latrine, Placenta, Incinerator and ash-pit at Ndanga Maternity Wing To ease access to health services to the surrounding community and also to make it full operational 2022-11-07 2023-01-31 MWK 52110550.40
618 RFQ/ZADC/DDF/2022/2023/01 NATCHENGWA SCHOOL BLOCK
implementation
construction Construction of Natchengwa School Block at Namalima VDC T/A Ngwelero To provide a conducive environment for learning 2023-03-01 2023-05-30 MWK 51490069.82
707 MW-CZDC-337730-CW-MW Completion of Mbunda Health Post
completed
construction Completion of Health Post and Construction a toilet to improve health services 2023-03-21 2023-06-10 MWK 9458437.00
653 CZDC/DDF/NAMAPALE/2022-23/01 Construction of Namapale Concrete Pad
completed
construction Construction of Concrete Slab Road Pad To provide access 2023-02-01 2023-05-01 MWK 15957007.00
698 031/MDC/DDF/HEALTH/HOSPITAL SECTOR/REFUBISHMENT/MACHINGA DISTRICT HOSPITAL KITCHEN Machinga DHO- Kitchen rehab
implementation
rehabilitation Fixing wall and floor tiles, ceiling, sanitary and electrical works improve access to health care services. 2023-08-21 2023-10-20 MWK 37947378.00
692 091/MHGDC/DDF/PUBLIC WORKS/NAMPEYA MARKET SHED Nampeya Market shed.
implementation
construction construction of a market shed. improve access to market. 2022-04-16 2022-06-15 MWK 37604189.37
686 MHGDC/GESD/32457/CW/RFB Mkwinda under 5 clinic
implementation
construction construction of Mkwinda under 5 clinic improve access to health care services. 2022-04-16 2022-06-15 MWK 37971750.00
695 031/MDC/DDF/HEALTH/HOSPITAL SECTOR/REFUBISHMENT/MACHINGA DISTRICT HOSPITAL MORTUARY Machinga District Hospital-mortuary rehab
implementation
rehabilitation Supply and installation of two cold rooms of capacity of 6 bodies each improved access to health care services 2023-08-21 2023-10-20 MWK 61501260.00
658 MHGDC/GESD/32451/CW/RFB Mgonachawi School Block
completion
construction Construction of double classroom block, 2 double Toilets and supplying of 60 desks To improve learners perfomance 2023-01-16 2023-03-17 MWK 49006850.00
524 MW-RDA-320756-CW-RFB CONTRUCTION OF CHIWETA EPA OFFICE BLOCK
completion
construction The project involves construction of an office block for Chiweta EPA To create a conducive environment for working. this will ease access of for the office to people 2023-02-10 2023-05-10 MWK 39575230.46
531 MW-RDA-320752-CW-RFB CONSTRUCTION OF BOMA YOUTH CENTRE
completed
construction the project involves construction of a youth centre to create an environment for youth to interact 2023-02-09 2023-06-18 MWK 62105702.35
502 MW-RDA-320757-CW-RFM CONSTRUCTION OF JUNJU GIRLS HOSTEL
implementation
construction The project involves construction of hostel to accommodate girls at Junju CDSS. The hostel will accomadate80 female learners. It will also carter for beds and mattresses. difficulty to access secondary education after completion of primary education, leads more teanergers in hard to reach areas drop out of school. as a result there are a lot of teenage pregnancies and early marriages. the hostel will provide accommodation for girls thereby, eliminating walking distances from home to school. girls will have enough time to study, discuss school work and rest after studies. this will in-turn improve pass rate and reduce drop out rate among girl child learners. 2023-02-09 2023-06-18 MWK 90423987.56
546 Upgrading to Asphalt Surface of Nthukwa via Hema to Mboni (0.8km) Upgrading to Asphalt Surface of Nthukwa via Hema to Mboni (0.8km)
implementation
construction Upgrading to Asphalt Surface of Nthukwa via Hema to Mboni (0.8km) Transportation 2021-12-06 2022-05-05 MWK 459000000.00
529 MDC/NCB/GESD/2021-22/011 Chitokoto-Zakeyo Solar Powered Drip Irrigation Scheme
completed
construction Design and building Chitokoto solar powered irrigation scheme covering an area of 5ha. Improving food security in the surrounding area through installation of mechanized solar powered irrigation scheme. 2021-12-20 2022-02-18 MWK 30009183.93
520 CPDC/01/11/22f Construction of girls Hostel at Misiku CDSS
completed
construction The project will construct an eighty-bed hostel To promote girl child education as they are provided with decent accommodation within the school premises hence averting other social and physical distractors on their education 2022-01-01 2022-04-01 MWK 51624823.65
501 MCC/ROADS/RESF/23/01 A LOT 2 Reshaping and associated drainage works on selected roads in Mzuzu City
implementation
rehabilitation Reshaping and associated drainage works on selected roads in Mzuzu City To rehabilitate some roads that are in bad shape as well as clearing of drainage system. This will help ease challenges road users face when using such roads. The drainage part is a measure to control unnecessary run off. 2023-03-15 2023-06-15 MWK 2624375.00
533 MW-RDA-320753-CW-RFB CONSTRUCTION OF MDIMWA PRIMARY CLASSROOM BLOCK
implementation
construction CONSTRUCTION OF CLASSROM BLOCK FOR PRIMARY SCHOOL THE SCHOOL IS LOCATED IN VERY REMOTE AREA, VERY HARD TO REACH DUE TO TOPOGRAPHY. THIS PROJECT WILL EASE ACCESS TO PRIMARY EDUCATION 2023-04-05 2023-08-05 MWK 43036415.50
555 PSIP 2130 Rehabilitation and Expansion of Dwangwa, Salima, Nkhota-kota and Ntchisi Schemes
implementation
expansion The project involves rehabilitating aged infrastructure which has outlived its design life, upgrading and expanding existing water supply systems to meet the growing demand in Dwangwa, Salima, Nkhotakota and Ntchisi The purpose of the project is to increase access to potable water in Dwangwa, Salima, Nkhotakota and Ntchisi by increasing water supply coverage and improving water supply reliability 2019-07-01 2025-03-31 MWK 136683000000.00
592 ZCC/GOV/RD/ENG/2021-22/03 Upgrading of Chinamwali-Ndelemani Road
implementation
construction 2.3km Road Upgrading to Asphalt class 2 road with 8 meters wide and masonary drainage Connect local markets and people 2023-04-14 2023-10-11 MWK 980904125.00
522 MCC/ROADS/BRG/IDF/22/10/02 MAINTANANCE OF TIMBER BRIDGES IN CHIBAVI, MCHENGAUTUBA WEST, AND GAGDAD BRIDGES
implementation
rehabilitation To maintain the bridges in the selected wards To ease mobility in the selected areas 2023-02-06 2023-07-06 MWK 3490625.00
562 BTDC/W/BT/NORTH/052/2022 MTANAMGALA TWO SPAN CONCRETE REHAB(MATERIALS)
completed
rehabilitation Rehabilitation of a concrete rehabilitation 2022-10-22 2022-12-22 MWK 7260000.00
563 BTDC/W/CDF/W/091/2022 CONSTRUCTION OF CHITUNDU SCHOOL BLOCK
implementation
construction CONSTRUCTION OF CHITUNDU SCHOOL BLOCK Provide conducive learning environment 2022-01-23 2022-02-23 MWK 33845548.14
564 BTDC/W/BT/SW/050/2022 CONSTRUCTION OF NTAYAMWANA 2 CONCRETE BRIDGE
completed
construction CONSTRUCTION OF NTAYAMWANA 2 CONCRETE BRIDGE to facilitate accessibility to social services 2022-10-22 2022-12-22 MWK 35847554.00
565 BTDC/W/CDF/NORTHEAST/089/2022 MAONI SCHOOL BLOCK REPAIRS
completion
rehabilitation REPAIRING A SCHOOL BLOCK Provide conducive learning environment 2022-07-22 2022-08-22 MWK 12700000.00
566 W/045/2012 CONSTRUCTION OF BENCHES AT DZIWE MARKET
implementation
construction BENCHES CONSTRUCTION BENCHES FOR VENDORS 2012-09-22 2012-10-22 MWK 5524152.00
567 W/MPEMBA/MARKET/003/2022 COMPLETION OF MPEMBA MARKET
implementation
construction MARKET CONSTRUCTION MARKET CONSTRUCTION 2022-06-22 2022-10-22 MWK 100000000.00
568 BTDC/W/DDF/06/2022 NAKAZIMU SCHOOL BLOCK
completed
construction SCHOOL BLOCK CONSTRUCTION Provide conducive learning environment 2022-12-22 2023-03-23 MWK 36000000.00
569 W/BH/008/2022 CONSTRUCTION OF THREE BOREHOLES
completion
construction BOREHOLE DRILING WATER SUPPLY 2022-06-22 2022-07-22 MWK 60000000.00
570 W/DDF/SW/04/2022 MANG'OMBA CLASSROOM BLOCK
completed
construction CONSTRUCTION OF CLASSROOM BLOCKS CLASSROOM CONSTRUCTION 2022-06-22 2022-08-22 MWK 34950750.00
571 BTDC/W/BT/SW/051/2022 CONSTRUCTION OF NAMICHIMBA BRIDGE
completed
construction BRIDGE CONSTRUCTION to facilitate accessibility to social services 2022-10-22 2022-12-22 MWK 13519097.00
572 BTDC/W/CDF-W/090/2022 CONSTRUCTION OF CHIGOMBE SCHOOL BLOCK
implementation
construction SCHOOL BLOCK CONSTRUCTION Provide conducive learning environment 2022-01-23 2022-10-22 MWK 39422004.09
573 BTDC/W/CDF-W/085/2022 ELECTRIFICATION OF CHIKULI POLICE
completed
rehabilitation CHIKULI POLICE ELECTRIFICATION TO SUPPLY ELECTRICITY 2022-01-23 2022-02-23 MWK 3234000.00
574 BTDC/W/CDF-W/084/2022 MAITENANCE OF CHIKOWA HEALTH CENTRE
completion
rehabilitation HEALTH CETRE MAINTENANCE TO IMPROVE THE CONDITION OF THE HEALTH CETRE 2022-01-23 2022-03-23 MWK 14500000.00
575 W/051/2022 CONSTRUCTION OF KHUNGULU SCHOOL SEMI-DETACHED HOUSE
implementation
construction HOUSE CONSTRUCTION HOUSE CONSTRUCTION 2022-06-22 2022-11-22 MWK 10000000.00
576 W/048/2022 CONSTRUCTION OF MICHILU SCHOOL SEMI DETACHED HOUSE
implementation
construction HOUSE CONSTRUCTION dwelling house for a primary school teacher 2022-03-22 2022-11-22 MWK 10000000.00
577 BTDC/W/CDF-RURA LEAST 082/2022 CONSTRUCTION OF NAMATANU BRIDGE
completed
construction BRIDGE CONSTRUCTION TO PROVIDE ACCESS TO SOCIAL SERVICES 2022-01-23 2022-02-23 MWK 20932250.25
578 BTDC/W/CDF-RURAL 079/2022 MLOMBOZI SCHOOL BLOCK MAITENANCE
completed
rehabilitation BLOCK REHABILITATION Provide conducive learning environment 2022-01-23 2022-02-23 MWK 27200000.00
579 BTDC/W/CDF-RURAL EAST/082/2022 NAMIKATE SCHOOL BLOCK MAITENANCE
completed
rehabilitation BLOCK REHABILITATION Provide conducive learning environment 2022-01-23 2022-02-23 MWK 11800000.00
580 BTDC/W/CDF/RURAL EAST/089/2022 MAINTENANCE OF MAKOMANO CONCRETE BRIDGE
completed
rehabilitation CONCRETE MAITENANCE to facilitate accessibility to social services 2022-12-22 2023-01-23 MWK 4072845.00
582 BTDC/W/45/2021/22 CHILINGANI SCHOOL BLOCK
completed
construction CONSTRUCTION OF A SCHOOL BLOCK to accommodate more students and to Provide conducive learning environment 2021-10-22 2022-02-23 MWK 13991600.00
583 BTDC/W/WSF/04/2023 CONSTRUCTION OF FOUR BOREHOLES
completed
construction BOREHOLE CONSTRUCTION WATER SUPPLY 2022-09-22 2022-10-22 MWK 17954000.00
584 BTDC/W/WSF/05/2023 CONSTRUCTION OF 6 BOREHOLES
completed
construction BOREHOLE CONSTRUCTION WATER SUPPLY 2022-11-22 2023-03-23 MWK 26080000.00
585 BTDC/W/BT/CDF/051/2022 ELECTRIFICATION OF MADZIABANGO HEALTH CENTER
completed
rehabilitation ELECTRIFICATION TO SUPPLY POWER ON THE HEALTH CENTER 2022-07-22 2022-10-22 MWK 20405694.65
586 BTDC/W/BT/NORTH/086/2022 MAINTENANCE OF NDALAPA CLASSROOM BLOCKS
completed
rehabilitation BLOCK MAIINTENANCE Provide conducive learning environment 2022-03-22 2022-06-22 MWK 676700.00
587 BTDC/W/BT/N/001/2022 CONSTRUCTION OF CHINAMVUWU PRIMARY SCHOOL BLOCK
completed
construction BLOCK CONSRUCTION Provide conducive learning environment 2022-07-22 2022-09-22 MWK 1750000.00
588 BTDC/W/BT/N/053/2023 LINJIZI BRIDGE RECONSTRUCTION
completed
construction BRIDGE RECONSTRUCTION to facilitate accessibility to social services 2022-10-22 2022-12-22 MWK 33500000.00
589 BTDC/W/BT/NORTH EAST/006/2022 CHIKABVUMBWA SCHOOL BLOCK
completed
construction SCHOOL BLOCK CONSTRUCTION to facilitate accessibility to social services 2022-06-22 2022-08-22 MWK 22500000.00
590 BTDC/W/CDF/RURAL EAST/005/2022 PULI UNDER FIVE CLINIC
implementation
construction UNDER FIVE CLINIC CONSTRUCTION to facilitate availability of social services 2022-06-22 2022-08-22 MWK 16669400.00
591 BTDC/W/338/2022 ELECTRIFICATION OF CHAWETA PRIMARY SCHOOL
completed
rehabilitation BRINGING ESCOM POWER TO SUPPLY POWER TO THE SCHOOL 2022-07-22 2022-09-22 MWK 17150000.00
603 BTDC/CDF/W/SOUTH WEST/006/2023/24 CONSTRUCTION OF INCINERATOR AND PLACENT A PIT AT SOCHE MATERNITY HEALTH CENTRE
implementation
construction CONSTRUCTION TO IMPROVE THE WORKING CONDITION 2023-09-01 2023-12-01 MWK 20596834.57
604 BTDC/W/CDF-BT SOUTH WEST/007/23 CONSTRUCTION OF 10M SIGALIRA CONCRETE BRIDGE
implementation
construction CONSTRUCTION TO FACILITATE ACCESSIBILITY TO SOCIAL SERVICE 2023-08-29 2023-10-29 MWK 27556701.00
605 BTDC/W/CDF-BT SOUTH WEST/019/2023 CONSTRUCTION OF NAPERI CONCRETE BRIDGE
implementation
construction BRIDGE CONSTRUCTION TO FACILITATE ACCESSIBILITY TO SOCIAL SERVICE 2023-09-01 2023-10-01 MWK 24996502.13
606 BTDC/DDF/NORTH/005/005/2023 CONSTRUCTION OF VIP TOILETS AT KAMWILI HEALTHY POST
implementation
construction TOILETS CONSTRUCTION TO IMPROVE THE HYGIENE 2023-08-07 2023-08-22 MWK 3611701.19
607 BTDC/W/CDF/BT NORTH EAST/005/2023/24 MAINTENANCE OF MTONDOKO CLINIC
completed
rehabilitation MTONDOKO CLINIC TO IMPROVE THE CONDITION OF A CLINIC 2023-07-26 2023-08-31 MWK 6937179.00
610 BCC/RFA- Pothole Patching and Associated Routine Maintenance Works on Selected Urban Paved Roads in Blantyre City -Blantyre Area-LOT 1
completed
rehabilitation Pothole Patching and Associated Routine Maintenance Works on Selected Urban Paved Roads in Blantyre City -Blantyre Area-LOT 1 Improve road condition 2023-02-22 2023-06-21 MWK 132014334.38
612 BTDC/W/DDF/SOUTH WEST/006/2023 CONSTRUCTION OF MATANDANI BRIDGE
implementation
construction BRIDGE CONSTRUCTION TO FACILITATE ACCESS TO SOCIAL SERVICES 2023-09-01 2023-10-01 MWK 29897628.17
701 MW-NEDC-316448-CW-RFB Construction of Sankhulani Guardian Shelter, Kitchen, Double door toilet and 2 bathrooms
implementation
construction Construction of Sankhulani Guardian Shelter, Kitchen, Double door toilet and 2 bathrooms Provision of health services 2023-01-07 2023-03-07 MWK 26593412.71
714 MJDHO-P1645221 Operationalization of Mulanje District Hospital Paying Ward 1
completion
expansion The project will involve the Supply and delivery of Medical equipment for the operationalization of the paying ward at Mulanje District Hospital To ease congestion at the hospital and providing treatment at affordable rates 2022-11-07 2023-01-31 MWK 32184656.98
715 MW-MJDC-316529-CW-RFB Rehabilitation of Chitakale Market Sheds
completed
rehabilitation The project was involving the Rehabilitation of Chitakale Market Shed and butchery To increase sanity in the market and also to enhance revenue generation within the market 2022-11-07 2023-01-31 MWK 30779598.92
717 CZDC/DDF/NGULUDI/2022-23/01 Chemwenye Road Improvement
completed
rehabilitation Chemenye road improvement To improve access to social and economic services 2023-01-31 2023-05-31 MWK 17309238.00
718 MJDCDDF001 Rehabilitation of District Council Administration Block Phase 1
implementation
rehabilitation The project will involve the rehabilitation of Mulanje District Council Administration block during the 1st Phase To enhance working environment for Council staff and enable sanity. 2022-11-07 2023-01-31 MWK 114399840.40
719 MW-CZDC-337728-CW-RFQ June Jnr Primary Toilet
implementation
construction Construction of June Jnr Primary toilet To improve sanitation service delivery at the school 2023-03-20 2023-05-31 MWK 3798399.00
721 MW-CZDC-335894-CW-RFQ Market Toilets Lot 1
preparation
construction Construction of Market toilets lot 1 To improve access to sanitation services in the markets 2023-02-28 2023-05-28 MWK 21299546.00
722 MW-PDC-319443-CW-RFB CONSTRUCTION OF MIGOWI-MUHAWA CONCRETE DECK BRIDGE
implementation
construction CONSTRUCTION ROAD NETWORK 2023-02-16 2023-06-16 MWK 36501979.85
723 RFQ2023-2024-04-25-2023-PCT-4-W Construction of Balanguzi-Likole Culvert line
completed
construction The Project involved construction of Culvert line at Balanguzi-Likole road For easy communication and transportation of goods 2023-06-08 2023-07-07 MWK 5318022.00
724 RFQ2023-2024-06-13-PCT-21-W Construction of Misomali 2 Box Culverts
completed
construction The project will involve installation of a Box Culvert at Misomali 2 village To ease communication and transportation 2023-06-08 2023-07-07 MWK 5516272.50
725 RFQ2023-2024-01-06-2023-PTC006-W-DDF Construction of Chisutu-Mpachika Culvert Line
completed
construction The project involved installation of a Culvert line at Chisutu-Mpachika road To ease transportation and communication 2023-06-08 2023-07-07 MWK 2647504.80
727 MW-CZDC-335894-CW-RFQ Market Toilets Lot 2
implementation
construction Construction of market toilets Lot 2 To improve access of sanitation services in the market areas 2023-03-02 2023-06-02 MWK 22059368.00
728 CZDC/DDF/MBULUMBUZI/2022-23/01 Construction of Administration CDSS block
implementation
construction Construction of CDSS Administration block To provide good teaching environment 2023-03-06 2023-07-06 MWK 31767888.00
729 RFQ2023-2024-01-06EW001 Construction of 600mm Culvert Line at Gululu Stream
completed
construction The project will involve the installation of Culvert line at Gululu stream To ease transportation and communication 2023-06-08 2023-07-07 MWK 2998050.00
730 RFQ2023-2024-01-06-DG004 Construction of Ntata-Mtcheche Culvert Line
completed
construction The project will involve construction of culvert line at Ntata-Mtcheche road To ease transport and communication 2023-06-08 2023-07-07 MWK 2990501.55
731 RFQ2023-2024-01-06EW002 Construction of Musisi-Nansomba Culvert Line
completed
construction The project involved construction of a culvert line at Musisi-Nansomba road To ease transportation and communication 2023-06-08 2023-07-07 MWK 3106477.50
732 RFQ2023-2024-PCT-004-W-DDF Construction of Chetsani-Matekenya Culvert Line
completed
construction The project involved construction of a Culvert line at Chetsani-Matekenya road To ease transportation and communication 2023-06-08 2023-07-07 MWK 2990501.55
733 RFQ-2023-2024-01-06-DW006 Construction of Juma Culvert Line
completed
construction The project involved construction of culvert line at GVH Juma To ease communication and transportation 2023-06-08 2023-07-07 MWK 2990501.55
734 CZDC/DDF/THUMBWE/2022-23/01 Decking of Masalani Concrete bridge
completed
replacement Replacement of timber deck to concrete decking To provide access 2023-01-31 2023-05-05 MWK 10507040.00
735 RFQ2023-2024-01-06GD007 Construction of Chetsani-Matekenya Culvert Line 2
completed
construction The project involve construction of a culvert line at Chetsani-Matekenya 2 To ease communication and transportation 2023-06-08 2023-07-07 MWK 2998583.25
736 MW-CZDC-316515-CW-RFB Nankuyu Concret bridge
implementation
construction construction of Nankuyu concret bridge To easy access social and economic services 2023-01-07 2023-05-31 MWK 28115296.00
737 RFQ2023-2024-PCT-008-WDDF Construction of Ngwezuthoto Culvert Line
completed
construction The project involved construction of a culvert line at Ngwezuthotho road To ease communication and transportation 2023-06-08 2023-07-07 MWK 2994080.25
738 RFQ2023-2024-01-06-2023-PCT-001-W-DDF Construction of Nanthwatchwa Culvert Line
completed
construction The project involves construction of culvert line at Nanthwatchwa village road To ease transport and communication 2023-06-08 2023-07-07 MWK 2971814.10
739 RFQ2023-2024-01-06EW002 Construction of Namijingo-Ng'oma Culvert Line
completed
construction The project involved construction of culvert line at Namijingo-Ng'oma road To ease communication and transportation 2023-06-08 2023-07-07 MWK 2998050.00
740 RFQ2023-2024-01-06-DW006 Construction of Muruwane Culvert Line
completed
construction The project involved construction of culvert line at Muruwane road To ease communication and transportation 2023-06-08 2023-07-07 MWK 3098916.00
741 RFQ2023-2024-PCT-002-W-DDF Construction of Mutanthe Culvert Line
completed
construction The project involved construction of culvert line at Mutanthe road To ease communication and transportation 2023-06-08 2023-07-07 MWK 2998583.25
742 MW-CZDC-335913-CW-RFQ PIM TDC
implementation
construction Construction of PIM TDC To improve education standards 2023-03-08 2023-06-08 MWK 37862920.00
748 BC/494/3 Construction of 88 No 2 bedroomed semi detached at Area 49/5 in Lilongwe
completed
construction Construction of 88 No 2 bedroomed semi detached houses Providing shelter and affordable houses for the nation 2019-03-29 2020-01-15 MWK 2101693601.94
726 BC/494/5 Construction of 66 No.E3-72 semi detached Houses in Blantyre
completed
construction 66 No. Semi-detached Houses Providing Safety, Safety and Comfort to the Nation 2019-03-23 2021-12-21 MWK 1699762525.38
744 BC/494/4 Construction of 3 No. Block of 2 bedroom Flats at Nandolo in Zomba
cancelled
construction 3 No. 2 bedroom Flats Providing Safety ,Comfort and affordable to the Nation 2019-03-28 2020-05-30 MWK 739244998.15
745 BC/494/1 Construction of 8 No.2 Bedroom Houses & One Block of Flats at Chasefu in Mzuzu
completed
construction 8 No.2 Bedroom Houses & Flat providing Shelter ,Safety & affordable Houses to the Nation 2019-03-27 2020-01-13 MWK 551329929.67
763 BCC/WORKS/03/02/12/IDF/2023-2024 CONSTRUCTION OF POLICE UNIT NEAR BANGWE YOUTH CENTRE
implementation
construction CONSTRUCTION OF POLICE UNIT NEAR BANGWE YOUTH CENTRE ENHANCE SECURITY 2024-03-25 2024-05-07 MWK 6983641.88
764 BCC/WORKS Construction of VIP toilet at Makhetha Market in South Lunzu
completed
construction Construction of VIP toilet at Makhetha Market in South Lunzu Enhance sanitation 2020-09-21 2020-10-12 MWK 3233108.00
765 BCC/WORKS Construction of VIP toilet at Likotima Market in Chigumula
completed
construction Construction of VIP toilet at Likotima Market in Chigumula Enhance sanitation 2020-09-18 2020-10-09 MWK 3191401.00
766 BCC/WORKS Construction of Kizito-Mudi Concrete Foot Bridge in Blantyre City East Constituency
completed
construction Construction of Kizito-Mudi Concrete Foot Bridge in Blantyre City East Constituency Ease of mobility. 2021-01-08 2021-02-07 MWK 10934457.00
767 BCC/WORKS Construction of Kizito-Mudi Concrete Foot Bridge in Blantyre City East Constituency
completed
construction Construction of Kizito-Mudi Concrete Foot Bridge in Blantyre Ease of Mobility 2021-01-08 2021-02-08 MWK 15734664.75
768 BCC/WORKS Rehabilitation of Kapeni-Mahatma Ghandhi Road in Blantyre City
completed
rehabilitation Rehabilitation of Kapeni-Mahatma Ghandhi Road in Blantyre City Ease of transportation 2021-02-10 2021-10-10 MWK 454670253.00
770 BCC/RFA- Construction of Chilobwe -Stella Maris Road in the City of Blantyre
completed
construction Construction of Chilobwe -Stella Maris Road in the City of Blantyre Enhance mobility 2021-02-11 2021-10-11 MWK 758792250.30
771 BCC/RFA- Construction of North Road -Market Street behind Limbe ESCOM in Blantyre city
completed
construction Construction of North Road -Market Street behind Limbe ESCOM in Blantyre city Enhace mobility 2021-02-11 2021-08-11 MWK 465423689.06
773 BCC/WORKS Rehabilitation of Mbayani Health Centre roof in Blantyre Kabula Constituency
completed
construction Rehabilitation of Mbayani Health Centre roof in Blantyre Kabula Constituency Promotion of good health 2021-01-08 2021-02-08 MWK 9624065.00
774 BCC/WORKS Provision of Insurance Service for the period 2021-2023
completed
construction Provision of Insurance Service for the period 2021-2023 Insurance 2021-09-30 2023-09-30 MWK 22393640.60
775 BCC/RFA- Construction of Michiru-Likhubula Road ( 1.5km) - Lot 6
implementation
construction Construction of Michiru-Likhubula Road ( 1.5km) - Lot 6 Enhance transportation 2022-02-02 2022-09-30 MWK 1375922853.90
776 BCC/RFA- Construction of Lali Lubani Road (1.7km) - Lot 2
completed
construction Construction of Lali Lubani Road (1.7km) - Lot 2 enhance transportation 2022-02-02 2022-08-01 MWK 1791304627.80
777 BCC/RFA- Construction Namiwawa-Sunnyside Road (2km) - Lot 1
completed
construction Construction Namiwawa-Sunnyside Road (2km) - Lot 1 Enhance transportation 2022-02-02 2022-08-01 MWK 1862160202.88
778 BCC/RFA- Construction of New Lands-Manje Road (2km) - Lot 7
completed
construction Construction of New Lands-Manje Road (2km) - Lot 7 Enhance transportation 2020-04-04 2020-10-01 MWK 1635220587.63
779 BCC/RFA- Construction of Chipatala - Kamba Road (1.2km) - Lot 5
completed
construction Construction of Chipatala - Kamba Road (1.2km) - Lot 5 Enhance mobility 2022-02-04 2022-08-03 MWK 1343621469.75
780 BCC/WORKS Rehabilitation of Angelogoveya Primary School
completed
construction Rehabilitation of Angelogoveya Primary School To promote education 2021-12-21 2022-01-20 MWK 14218220.00
781 BCC/WORKS Provision of Insurance Services for the period 2021-2023
completed
construction Provision of Insurance Services for the period 2021-2023 Insurance 2022-03-18 2024-03-18 MWK 21441000.00
784 BCC/WORKS Supply and Delivery of Two 18m³ Compactors
completed
construction Supply and Delivery of Two 18m³ Compactors Enhance mobility 2022-07-20 2022-12-17 MWK 377740000.00
797 P158805 Shire Valley Transformation Programme-1 (Construction of Remainer of Main Canal 1 and part of Main Canal 2)
implementation
construction Construction of the remainder of main canal 1 and part of main canal 2 (from 6km to 42kms in Lengwe) Promotion of irrigation services to smallholder farmers and other farmers in the Shire Valley. 43,370 hectares to be irrigated through the project. 2021-11-12 2024-12-31 USD 78421122.08
798 P158805 Shire Valley Transformation Programme-1 (Construction of Secondary Pipelines)
implementation
construction Construction of secondary pipelines to 13 irrigation blocks under phase 1 of the Shire Valley Transformation Programme Promotion of irrigation services to smallholder farmers and other farmers in the Shire Valley. 43,370 hectares to be irrigated through the project. 2024-04-02 2026-04-02 USD 48300000.00
746 CZDC/DDF/MITUMBIRA/2022-23/01 Mitumbira Concrete bridge
completed
construction Mitumbira Concrete bridge easy access to social and economic services 2023-03-01 2023-05-01 MWK 17313442.00
716 P1641055 Rehabilitation of Chambe Gravity Fed Piped Water System
completed
rehabilitation The project involved rehabilitation of Chambe Gravity Fed Piped water system from the intake to various communities within its catchment To ease access to portable water within the surrounding communities. 2022-11-07 2023-01-31 MWK 120780280.69
747 BC493A Construction of 6No Blocks of 2bedroomed House at Ngumbe
completed
construction 6No semi detached blocks of 2 bedrooms Providing shelter, safety and affordable houses to the nation 2018-05-02 2018-11-02 MWK 210206316.85
759 BTDC/W/DDF/0010/2024 MAINTEANCE OF CHIPANDE PRIMARY SCHOOL BLOCK
implementation
rehabilitation MAITENANCE OF A SCHOOL BLOCKS PROVIDE CONDUCIVE LEARNING ENVIRONMENT BY MAINTAINING A 2 CLASSROOMSCHOOL BLOCK 2024-03-13 2024-06-13 MWK 16995744.00
760 BTDC/W/DDF/007 MZAMBA 1 BRIDGE
implementation
construction BRIDGE TO PROVIDE ACCESS TO SOCIAL SERVICES 2023-12-13 2024-02-13 MWK 24060828.41
761 BTDC/W/DDF/006 MATANDANI BRIDGE
implementation
construction CONSTRUCTION OF MATANDANI BRIDGE TO PROVIDE ACCESS TO SOCIAL SERVICE 2023-08-18 2023-10-22 MWK 29897629.17
762 BTDC/W/WATER/BOREHOLE/05/2023 CONSTRUCTION OF BOREHOLE AT KAMWIRI HEALTH POST
implementation
construction BOREHOLE CONSTRUCTION TO PRIVIDE CLEAN WATER TO THE SOCIETY 2023-07-26 2023-08-10 MWK 4943812.50
769 BCC/RFA- Construction of Slip Lanes at Kamba,Kapeni, Keza and Southend School junction in Blantyre City
completion
construction Construction of Slip Lanes at Kamba,Kapeni, Keza and Southend School junction in Blantyre City Enhance mobility 2021-02-11 2021-04-12 MWK 250216128.00
772 BCC/WORKS Drilling of two bore holes in Blantyre South East Constituency
completed
construction Drilling of two bore holes in Blantyre South East Constituency Enhance sanitation 2021-01-08 2021-02-08 MWK 7906622.00
782 BCC/RFA- Construction of Ndirande -Nkolokoti (Makhetha Road)
completed
construction Construction of Ndirande -Nkolokoti (Makhetha Road) Ease of mobility 2022-07-27 2023-03-24 MWK 3042438188.79
783 BCC/RFA- Detailed Engineering Design & Construction Supervision
completed
construction Detailed Engineering Design & Construction Supervision Design supervision 2022-07-13 2024-01-04 MWK 301670340.00
785 BCC/WORKS Consultancy Services for Cadastral Survey for Area 11 Plots
completed
construction Consultancy Services for Cadastral Survey for Area 11 Plots Sustainable town development 2022-07-28 2022-09-26 MWK 27492500.00
786 BCC/RFA- Pothole Patching and associated drainage works covering Limbe and Blantyre paved roads in Blantyre city (Lot 1, Blantyre area)
implementation
rehabilitation Pothole Patching and associated drainage works covering Limbe and Blantyre paved roads in Blantyre city (Lot 1, Blantyre area) Road improvement works. 2023-02-09 2023-05-10 MWK 132014334.38
787 BCC/RFA- Pothole Patching and associated drainage works covering Limbe and Blantyre paved roads in Blantyre city (Lot 2, Limbe area)
implementation
rehabilitation Pothole Patching and associated drainage works covering Limbe and Blantyre paved roads in Blantyre city (Lot 2, Limbe area) Road improvement works 2023-03-06 2023-06-04 MWK 150654137.81