|
11 |
RA\DEV\2015-16\02 |
CONSTRUCTION OF THE NJAKWA – LIVINGSTONIA ROAD |
implementation
|
construction |
The Njakwa – Livingstonia Road project has a total length of 78.5Km |
6.0 PROJECT BENEFITS
The project has many benefits to the people along the road and to the country as a whole. Some of the benefits will include;
6.1 Road Maintenance costs
With the new construction from gravel to bituminous surfaced standard, the road will operate in an all-weather condition. Ultimately, emergency maintenance works during the rainy season and costs will be reduced as concentration will be on routine maintenance activities such as drainage structures cleaning, line marking, grass cutting and patching of any potholes that may occur.
6.2 Vehicle Operating and Passenger Travel costs
Vehicle operating costs savings constitute the most important benefit attributable to the project. This will have direct reduction on maintenance cost of the vehicles, reduced fuel consumption and travel time.
6.3 Agriculture
The area where the road passes is an agricultural rich area for mainly tobacco, coffee, maize and bananas. The upgrading of the road will ease problems of transporting farm inputs and produce to and from various markets.
6.4 Environmental and Health
The upgrading of the road will reduce the occurrence of dust and mud along the project area and thereby improving sanitation which means reduction in the spread of diseases which are airborne or waterborne. This will reduce the cost of medicines which would have been required to treat the people affected. The upgrading of the road will allow the communities good access to health facilities in town.
6.5 Employment Creation and Business Boosting
The people around the area of the road project are also benefitting by getting employed in various road activities by the Contractor.
During project implementation and after, a lot of businesses will mushroom along the project road and the communities will be empowered economically.
6.6 Boosting Mining
The road will provide an all weather access to places of notable activities of national and economic importance like Kaziwiziwi coal mine and other undeveloped potential mining areas.
6.7 Tourism
The road passes through a historical Livingstonia mission which has other establishments such as the University of Livingstonia. The road also passes through tourist attraction areas of Manchewe falls before descending the beautiful meandering Golodi escarpments to meet the M01 road at Chitimba. |
2016-11-01 |
2020-05-01 |
MWK |
39815658687.27 |
|
|
14 |
DZDC/GESD/W/2021-22 - LOT 1 |
Completion of Bema Dispensary |
implementation
|
construction |
The works involve the completion of 1No dispensary, construction of 2No staff houses, provision of running water and all associated plumbing works |
To improve health service delivery in the district |
2021-11-01 |
2022-03-01 |
MWK |
85000000.00 |
|
|
13 |
001 |
Upgrading of M12 to Ludzi Road |
completed
|
construction |
Upgrading to bituminous standard 6km |
Ease of transport to main district headquaters |
2019-08-22 |
2020-04-30 |
MWK |
1300000000.00 |
|
|
20 |
RA/DEV/14/08 |
UPGRADING OF THYOLO-THEKERANI-MUONA-MAKHANGA ROAD |
implementation
|
construction |
The 83 km long project road is in the Southern Region of Malawi and traverses the districts of Thyolo and Nsanje. The project road branches off from the Limbe – Thyolo – Muloza (M02) road at Nambala Wani in Thyolo district and extends southwards passing through Muona trading centre and ending at Makhanga trading centre in Nsanje district. The project road is joined by the East Bank (S152) road at Muona trading centre before joining the (M01) road at Bangula trading centre. |
The project has many benefits to the people along the road and to the country as a whole. Some of the benefits include;
6.1 Boosting Agriculture
The road passes through tea estates which is one of the major forex earners for Malawi. Upgrading this road will ensure that there is ease of access to markets for farm produce.
6.2 Direct employment during construction
There is direct employment during construction which has a direct bearing on poverty reduction as many people including women are benefiting directly from the project, as some of them are being employed whereas some benefit through buying and selling of agriculture produce from their gardens.
6.3 Reduction in Vehicle Operating Costs
Reconstruction and Upgrading of the road will result in reduction of vehicle operating costs which constitutes the major benefit attributable to such new projects.
6.4 Reduction in Travel Time
The project will help reduce travel time from the agricultural rich Nsanje district towards the commercial city of Blantyre. |
2016-08-15 |
2019-08-14 |
MWK |
27317366355.36 |
|
|
23 |
MW-RA-51975-CW-RFB |
MALAWI SECOND AGRICULTURESECTOR WIDW APPROACH |
completed
|
construction |
Upgrading of Junction M001(Chinyamula to Mphepozinai (10km) to Low Volume Seal Roads (LVR) Standards in Ntcheu District |
To help improve transportation of Farm Inputs and Farm Products |
2019-08-05 |
2020-11-30 |
MWK |
908000000.00 |
|
|
22 |
RA\DEV\2017-18\04 |
UPGRADING OF THE NTCHEU-TSANGANO-NENO ROAD LOT 1 (FIRST 21 KILOMETERS) |
implementation
|
construction |
The Ntcheu-Tsangano-Neno-Mwanza Road is 140 Kms long. It starts from junction with M01 at Biriwiri (commonly known as Tsangano Turn-Off) passing through some trading centres like Kambilonjo, Doviko, Tsangano and connects with M06 at junction to Mwanza.
This project involves the upgrading works from earth to bitumen standard of approximately 140 km of road section from Biriwiri to Mwanza. The project will be executed in a phased approach with the the first covering a distance of 21km from Biriwiri to Kambilonjo. The contract commenced on 3rd of April 2018 and will be completed on 3rd April 2019 |
.1 Direct employment during construction
The people around the area of the road project will benefit by getting employed in various road activities by the Contractor.
During project implementation and after, a lot of businesses will mushroom along the project road and the communities will be empowered economically.
.2 Reduction in Vehicle Operating Costs
Upgrading of the road will result in reduction of vehicle operating costs which constitutes the major benefit attributable to such new projects.
.3 Reduction in Travel Time and Cost
The project will help reduce travel time from the agricultural areas between Ntcheu and Tsangano.
Passengers will now be paying less and spending less time on travel. Availability of buses and minibuses will greatly improve.
.4 Road Maintenance costs
With the upgrading of this road to bitumen standard, maintenance costs of the road will be reduced greatly. Currently, funds are supposed to be allocated annually to carry out grading and other maintenance works on drainage.
.5 Agriculture
The area where the road passes is an agricultural area for mainly Irish potatoes and maize. The upgrading of the road will ease problems of transporting farm inputs and produce to and from various markets.
.6 Environmental and Health
The upgrading will reduce the occurrence of dust and mud along the project area and thereby improving sanitation which means reduction in the spread of diseases which are airborne or waterborne. This will reduce the cost of medicines which would have been required to treat the people affected. The upgrading of the road will allow the communities good access to health facilities in town especially for referral cases. |
2018-04-03 |
2019-04-03 |
MWK |
9680744481.55 |
|
|
26 |
08/2018 |
Construction of Weighbridge Station at Dwangwa in Nkhata-kota |
implementation
|
construction |
Construction of Weigh Bridge Station, Staff Houses and External Works |
To control axle load |
2018-09-17 |
2022-06-15 |
MWK |
650107064.02 |
|
|
28 |
RA/DEV/2019-20/12 |
UPGRADING OF NSANAMA-NAYUCHI ROAD (MOZAMBIQUE BORDER) -T393 |
implementation
|
construction |
The Nsanama-Nayuchi/Mozambique Border Road section is approximately 44 km long with very sandy soils. The road starts at Nsanama and ends at Nayuchi on the Mozambique border. It passes through two trading centres, namely Mbanila and Namanja.
The scope of works under this project is the upgrading of 10km of road section from Nsanama to Nkhande Bridge towards Nayuchi.The works will include construction of a 6.7m wide carriageway and 1.5m wide sealed shoulders on each side of the road. The pavement layers will be constructed from natural gravels with 50mm Asphalt Concrete surfacing. |
The project will have many benefits to the people along the road and to the country as a whole. Some of the benefits will include;
1. Road Maintenance costs
With the new road construction from earth to bituminous surfaced standard, the road will operate in an all-weather condition. Ultimately, emergency maintenance works during the rainy season and costs will be reduced as concentration will be on routine maintenance activities such as drainage structures cleaning, line marking, grass cutting and patching of any potholes that may develop.
The road has been raised to prevent over flooding / overtopping during rainy season which will make travel safety all year round.
2 Vehicle Operating and Passenger Travel costs
Vehicle operating costs savings constitute the most important benefit attributable to the project. This will have direct reduction on maintenance cost of the vehicles, reduced fuel consumption and travel time.
3 Agriculture
The area where the road passes is an agricultural area for mainly sorghum. The improvement of the road will ease problems of transporting farm inputs and produce to and from various markets.
4 Employment Creation and Business Boosting
The people around the area of the road project will also benefit by getting employed in various road activities by the Contractor.
During project implementation and after, a lot of businesses will be enhanced along the project road and the communities will be empowered economically.
5 Inter-Border Trade
It is hoped that the improvement of the road will enhance movement of goods between the two countries of Mozambique and Malawi, thereby boosting trade.
6 Reduction of travel time
The construction of the road will help reduce the travel time thereby increasing the people productive time to work and businesses. |
2021-04-23 |
2022-02-22 |
MWK |
5361576130.35 |
|
|
31 |
KADC/DDF/2020-21/06 |
Construction of Iponga Guardian Shelter |
implementation
|
construction |
Construction of Shelter with male and female rooms, kitchen and washing facilities |
This is to allow guardians give extra care for their wards/patients while receiving treatment at a Health Facility |
2021-10-02 |
2021-12-31 |
MWK |
14421739.50 |
|
|
37 |
BDC/IPDC/RFQ/GESD/2021-2022/02 |
CONSTRUCTION OF LIVIRIVI EPA OFFICE BLOCK |
implementation
|
construction |
Building of Livirivi EPA office block where there is going to be a staff room, common room. |
to provide a better working condition |
2021-11-15 |
2022-03-15 |
MWK |
33935887.56 |
|
|
39 |
NNDC/GESD PROJ/21-22/01 Lot 1 |
Namzanga Classroom Block Construction |
implementation
|
construction |
Construction of a classroom block at Namzanga Primary School |
To improve learning space for school |
2021-07-01 |
2022-03-31 |
MWK |
35000000.00 |
|
|
43 |
ZDC/NTONYA/RFQ/CDF/05/2021 |
Bridge Upgrading |
completed
|
construction |
Upgrading of a 5 span Timber Bridge to Concrete Status on Thondwe River |
accessibility improvement |
2021-06-21 |
2021-10-11 |
MWK |
23800000.00 |
|
|
45 |
RA/DEV/2020-21/01 |
Rehabilitation and Widening of the (M1) Road from Kamuzu International Airport (KIA) Turn-Off to Kasungu being LOT 1 of the four LOTS comprising the entire project |
implementation
|
rehabilitation |
The rehabilitation and widening of the M1 road section from the turnoff to Kamuzu International Airport (KIA) to Kasungu referred to as Section 1 (or LOT
1 of the procurement procedure) of the project. The total length of the section is 102 km. |
The primary economic function of the road is the long-distance transportation of import goods for Malawi from the port of Dar es Salaam. Fuel is the main product handled but the road also provides for the import of goods to the mining activities along the road corridor, and the export of agricultural products, in particular tobacco. The road is a major route from Lilongwe to the north and carries significant local traffic serving district administrative centers and trading centers along its route. The Ml through Malawi offers the shortest import/export route to Dar es Salaam for Zambia's agriculturally important Eastern Province. |
2022-06-29 |
2024-12-15 |
EUR |
41955796.40 |
|
|
46 |
RA/DEV/2020-21/02 |
Rehabilitation and Widening of the (M1) Road from Kasungu to Jenda (85.5km) being LOT 2 of the four LOTS |
implementation
|
rehabilitation |
The rehabilitation and widening of the M 1 road section from Kasungu to Jenda referred to as Section 2 (or LOT 2 of the procurement procedure) of the project. The total length of the section is 85.5 km.
The primary economic function of the road is the long-distance transportation of import goods for Malawi from the port of Dar es Salaam. Fuel is the main product handled but the road also provides for the import of goods to the mining activities along the road corridor, and the export of agricultural products, in particular tobacco. The road is a major route from Lilongwe to the north and carries significant local traffic serving district administrative centres and trading centers along its route. The Ml through Malawi offers the shortest import/export route to Dar es Salaam for Zambia's agriculturally important Eastern Province. |
Various forms of traffic make use of the project road. This includes heavy and light duty goods vehicles, buses, pickups, minibuses, passenger cars and non-motorised traffic (mainly bicycles and pedestrians). There are large volumes of non-motorised traffic, with many trading centres and towns along the route. |
2022-06-29 |
2023-09-22 |
EUR |
32275046.54 |
|
|
48 |
RA/DEV/2020-2021/03 |
Rehabilitation and Widening of the (M1) Road from Jenda to Mzimba Turn Off being LOT 3 of the four LOTS comprising the entire project |
implementation
|
rehabilitation |
The rehabilitation and widening of the M1 road section from Jenda to Mzimba referred to as Section 3 (or LOT 3 of the procurement procedure) of the project. The total length of the section is 46.5 km. |
The primary economic function of the road is the long-distance transportation of import goods for Malawi from the port of Dar es Salaam. Fuel is the main product handled but the road also provides for the import of goods to the mining activities along the road corridor, and the export of agricultural products, in particular tobacco. The road is a major route from Lilongwe to the north and carries significant local traffic serving district administrative centers and trading centers along its route. The Ml through Malawi offers the shortest import/export route to Dar es Salaam for Zambia's agriculturally important Eastern Province. Various forms of traffic make use of the project road. This includes heavy and light duty goods vehicles, buses, pickups, minibuses, passenger cars and non-motorised traffic (mainly bicycles and pedestrians). There are large volumes of non-motorised traffic, with many trading centres and towns along the route. |
2022-06-29 |
2023-09-29 |
EUR |
11506175.75 |
|
|
47 |
RA/DEV/2020-2021/04 |
Rehabilitation and Widening of the (M1) Road from Kacheche to Chiweta being LOT 4 of the four LOTS comprising the entire project |
implementation
|
rehabilitation |
The rehabilitation and widening of the M1 road section from Kacheche to Chiweta referred to as Section 4 (or LOT 4 of the procurement procedure) of the project. The total length of the section is 66.5 km. |
The primary economic function of the road is the long-distance transportation of import goods for Malawi from the port of Dar es Salaam. Fuel is the main product handled but the road also provides for the import of goods to the mining activities along the road corridor, and the export of agricultural products, in particular tobacco. The road is a major route from Lilongwe to the north and carries significant local traffic serving district administrative centers and trading centers along its route. The Ml through Malawi offers the shortest import/export route to Dar es Salaam for Zambia's agriculturally important Eastern Province. Various forms of traffic make use of the project road. This includes heavy and light duty goods vehicles, buses, pickups, minibuses, passenger cars and non-motorised traffic (mainly bicycles and pedestrians). There are large volumes of non-motorised traffic, with many trading centres and towns along the route. |
2022-06-29 |
2024-06-29 |
EUR |
31887078.30 |
|
|
50 |
ROADS/LCC/// |
UPGRADING OF CITY ROADS TO BITUMEN STANDARD- AREA 25C |
implementation
|
construction |
Construction of Area 25C road to bitumen standard |
to ensure roads are safe, cleaner and less congested |
2021-07-15 |
2022-08-17 |
MWK |
1900000.00 |
|
|
55 |
MIM2202 |
Construction of Perimeter Fence |
preparation
|
construction |
Project involves construction of brick walled perimeter fence at the MIM Campus ,Kanengo-Lilongwe |
Enhance campus security and ensure that there is a cordial coexistence between staff, students and surrounding communities |
2022-10-02 |
2023-12-30 |
USN |
10000.00 |
|
|
17 |
LCC/STRLIGHT/002/IPDC/03/21 |
Installation of Solar Powered Street Lights at Area 18 Interchange |
completed
|
construction |
Installation of Solar Powered Street lights at area 18 interchange |
Make roads safer, cleaner and less congested |
2021-07-15 |
2021-09-16 |
MWK |
97689606.00 |
|
|
61 |
LUANAR/IPDC/CONSTRUCTION/001 |
CONSTRUCTION OF A GATEWAY ADMINISTRATION BLOCK |
implementation
|
construction |
The main aim of the project is to Construct the Offices for the LUANAR |
The offices are to be used by the University offices |
2013-08-01 |
2022-08-26 |
MWK |
100000000.00 |
|
|
63 |
LUANAR/IPDC/CONSTRUCTION/002 |
construction of ODeL area 47 builing |
completion
|
construction |
construction of offices and classrooms |
To widen the ODeL teaching mechanism |
2022-08-12 |
2022-08-26 |
MWK |
4500000000.00 |
|
|
66 |
BWB/W/21 |
Construction of Independent Power Plant (IPP) for Blantyre Water Board |
preparation
|
construction |
The project aims to ensure provision of affordable and continuous water supply services through construction of 30MW Independent Power Plant. The project is being financed by EXIM Bank of India. |
To reduce water production costs, and ensure un-interrupted water supply |
2023-09-30 |
2025-03-31 |
USD |
72000000.00 |
|
|
72 |
BWB/W/22 |
Construction of New Water Source on Shire River and associated infrastructure for Blantyre Water Board |
preparation
|
construction |
Construction of new intake at Mandiwa on Shire River, construction of transmission mains, construction of treatment works at Walkers Ferry and Service Reservoirs. The project is being financed by EXIM Bank of India. |
To increase water production capacity to keep pace with the growing demand on water in the city of Blantyre and surrounding areas, projected at 230,000 cubic meters per day by the year 2040 |
2023-01-01 |
2026-11-30 |
USD |
78000000.00 |
|
|
85 |
MoD/W/004/2021 |
REHABILITATION AND MAINTENANCE OF WATER SUPPLY SYSTEM AT COBBE BARRACKS IN ZOMBA |
implementation
|
rehabilitation |
REHABILITATION OF WATER SUPPLY DISTRIBUTION NETWORK, INSTALLATION OF PREPAID WATER METERS AND PLUMBING FITTINGS AT COBBE BARRACKS IN ZOMBA |
Improvement of water supply and reduction of non-revenue water at Cobbe Barracks |
2022-04-11 |
2023-04-11 |
MWK |
1677652941.40 |
|
|
97 |
ZCC |
Namiwawa Road Dualisation |
implementation
|
construction |
Dual carriage of 800m tarmac and solar street lighting installation. |
Increase surface area for Trade and Reduction in heavy congestion in Central Business District. |
2022-02-18 |
2022-08-18 |
MWK |
1200000000.00 |
|
|
95 |
EGC 122/ICB/RFP/FY2022-23 |
The Rehabilitation/Modernisation Of Spillway And Intake Equipment Of Nkula B Hydropower Plant In Malawi |
identification
|
rehabilitation |
CONSULTANCY SERVICES THE REFURBISHMENT & MODERNISATION OF SPILLWAY AND INTAKE EQUIPMENT OF NKULA B HYDROPOWER PLANT IN MALAWI |
Spillway and Intake Gates for Nkula B Power Plant were commissioned in 1979. The gates and associated equipment have outlived their useful life, leading to frequent breakdowns. As such, the equipment is due for refurbishment and modernization. |
2022-11-01 |
2023-05-01 |
USD |
200000.00 |
|
|
6 |
24/2019 |
Construction of Aquatic Complex |
implementation
|
construction |
Swimming Pools and Ancillary Works |
To provide international swimming competition and recreation |
2021-06-01 |
2022-08-05 |
MWK |
8212029659.69 |
|
|
78 |
18/2020 |
construction of security houses for malawi police |
implementation
|
construction |
houses for senior and junior staff |
provide housing to security officers |
2022-03-21 |
2023-04-29 |
MWK |
3866876304.68 |
|
|
111 |
LCC/IPDC193/03/21 |
REHABILITATION OF AREA 49 OLD GULLIVER ROAD |
completion
|
rehabilitation |
Rehabilitation of area 49 old gulliver road 2.1km to Asphalt standard |
Helping to ease transportation of goods and services and facilitate and improve health and social economic growth in urban areas |
2021-10-18 |
2022-03-18 |
MWK |
937906142.25 |
|
|
114 |
LCC/IPDC193/03/21 |
UPGRADING OF AREA 25C/DZENZA ROAD |
completion
|
construction |
Upgrading of area 25C dzenza to bituminous standard by dika construction and being supervised by PJK & P consulting services approximately 3.8km |
This development will help to ease transportation of goods and services and facilities and improve health and social-economic growth in urban areas. |
2021-10-18 |
2022-03-18 |
MWK |
1668599501.25 |
|
|
118 |
001/GESD/53085/10/21/701 |
Construction of Santhe Community Ground |
implementation
|
construction |
Construction of perimeter fence, covered stand and football pitch |
To provide social entertainment to the community in kasungu |
2021-12-01 |
2023-04-01 |
MWK |
300000000.00 |
|
|
119 |
NRWB/KA |
Karonga Town Water Supply Project |
implementation
|
construction |
Northern Region Water Board is implementing Karonga Town Water Supply Project in Karonga Town and surrounding areas. The project is financed by Arab Bank for Economic Development in Africa (BADEA), OPEC Fund for International Development (OFID) and the Malawi Government (GoM) at a total cost of MK19.5billion (USD26.7 million). |
The aim of the project is to contribute to the economic development of Malawi by improving the health and livelihoods of the residents of Karonga Town and surrounding areas through rehabilitation and expansion of the existing water supply system in order to provide reliable and sustainable potable water services. The number of beneficiaries will be 184,000 by year 2035. |
2019-08-23 |
2024-10-30 |
USD |
26700000.00 |
|
|
117 |
NRWB/NB |
Nkhata Bay Town Water Supply and Sanitation Project |
implementation
|
construction |
Nkhata Bay Town Water Supply and Sanitation Project (NTWSSP), is being implemented by Northern Region Water Board (NRWB) and co-financed by African Development Bank (AfDB), OPEC Fund for International Development (OPEC Fund) and the Malawi Government (GoM) at a total cost of US$30.55 million (US$ 15.1 million from AfDB, US$12 million from OFID and US$3.45 million from GoM). |
The project will improve the health and livelihoods of the residents of Nkhata Bay Town and surrounding areas through access to potable and sustainable water supply and improved sanitation services. This will impact positively to 105,000 beneficiaries of Nkhata Bay Town and surrounding areas whose population by year 2040.
The project was declared effective on 4th March 2019 having fulfilled the conditions precedent. The project completion date is 31st December 2022 with 30th June 2023 as date of last disbursement. |
2019-07-01 |
2024-06-30 |
USD |
30550000.00 |
|
|
121 |
KSCDF2022 |
Construction of Kapiri Stadium |
implementation
|
construction |
Adding some structures to Kapiri community ground |
To enable the community ground host some local sports events |
2022-06-12 |
2022-10-12 |
MWK |
50000000.00 |
|
|
131 |
ZDC/GESD/DDF/W/2021/2022/2 |
Katsonga Girls Hostel fence |
completion
|
construction |
A fence for Katsonga girls hostel |
for security |
2022-01-01 |
2022-05-30 |
MWK |
40612245.10 |
|
|
135 |
TD-OX/ZCC/21/172/LLW-MW/003 |
Construction and Rehabilitation of Drainage Channels in Sadzi Ward |
completion
|
construction |
new drainage channels and rehabilitating old existing channels which were damaged by heavy rains cyclones |
To provide proper channels of water run off to minimize disasters during rainy season. |
2021-10-08 |
2022-03-27 |
MWK |
56281150.00 |
|
|
98 |
ZCC/ |
Upgrading of Mpoto road from earth to Bituminous road with asphalt finish |
implementation
|
construction |
Construction of a 3.5 Kilometer road with asphalt finish, with |
Decongestion of traffic in Zomba City |
2022-03-14 |
2022-07-28 |
MWK |
1209664562.00 |
|
|
142 |
GESD/05G/1 |
Construction of a Chief's Conference hall and 2 VIP toilets at Msinja Headquarters |
completed
|
construction |
construction of a chief's office block that has a conference hall, clerk's office and a Chief's office together with 2 VIP Toilets outside |
to provide a formal meeting place for the Senior Chief and his subjects |
2021-11-14 |
2022-02-12 |
MWK |
25500000.00 |
|
|
146 |
GESD/04G/2 |
Construction of an OPD block at Chitsime Health Centre |
completed
|
construction |
construction of an Outpatient department office block |
to improve health care provision services |
2022-02-16 |
2022-05-17 |
MWK |
45000000.00 |
|
|
56 |
GESD/01G/1 |
Construction of classroom block at Phirilanjuzi Primary school |
completed
|
construction |
This project involves construction of a two roomed classroom block at Phirilanjuzi Primary school in Traditional authority Masumbankhunda |
This project aims at reducing the high pupil to classroom ratio |
2021-11-14 |
2022-02-12 |
MWK |
25000000.00 |
|
|
136 |
GESD/01G/2 |
Construction of a Classroom block at Mwenda primary school |
completed
|
construction |
Construction of a two roomed classroom block at Mwenda primary school at T/A Chadza |
reduction of the high pupil to classroom ratio |
2022-01-20 |
2022-04-20 |
MWK |
25000000.00 |
|
|
138 |
GESD/03G/4 |
Construction of a concrete deck foot bridge at Mbabvi foot bridge |
completed
|
construction |
construction of a concrete deck foot bridge at Mbabvi river in T/A njewa |
to improve quality of mobility of people during rainy season |
2021-11-14 |
2022-02-12 |
MWK |
25000000.00 |
|
|
144 |
GESD/O6G/2 |
Construction of A vendor's Market shed at Namitete Market |
completed
|
construction |
Construction of a vendor's market shed |
to provide a suitable trading place for local suppliers and consumers |
2021-11-14 |
2022-02-12 |
MWK |
34500000.00 |
|
|
147 |
GESD/O3G/2 |
Construction of a box culvert at Kasanda River |
completed
|
construction |
Construction of a box culvert at Kasanda river and other associated works |
to improve mobility of people and vehicles during wet season |
2021-11-14 |
2022-02-12 |
MWK |
25859250.00 |
|
|
148 |
DDF/04D |
Construction of a fence and 2 VIP toilets at Kabudula Community Hospital |
completed
|
construction |
construction of a fence and 2 VIP Toilets |
To ensure the safety of the people in the guardian shelter |
2021-11-14 |
2022-02-12 |
MWK |
25000000.00 |
|
|
149 |
GESD/05G/2 |
Construction of an office block for a Police unit at Mkoma school in T/A Chimutu |
completed
|
construction |
construction of an office block and 2 VIP Toilets |
to make police services easily accessible to those in the area |
2021-11-14 |
2022-02-12 |
MWK |
25500000.00 |
|
|
150 |
LCC/IPDC/196/03/21 |
Construction of mtandire to Airwing Road- Lot 4 |
implementation
|
construction |
Construction/upgrading of 6km Road that starts from mtandire - Airwing to bituminious standard.
The works are carried out by FNC/Meshos JV and are supervised by L Gravam Consulting Services. |
To provide ease transportation of goods and services and improve the living starndard of people aswel as promoting socio-economic growth. |
2022-05-13 |
2022-11-09 |
MWK |
3056571967.63 |
|
|
139 |
GESD/02G/2 |
Construction of a staff house at Matapila Health Centre |
completed
|
construction |
construction of a staff house at Matapila Health Centre in traditional authority Mazengera |
to help with the accommodation of heath care personnel so as to reduce time taken to reach duty station |
2022-01-12 |
2022-04-12 |
MWK |
26500000.00 |
|
|
123 |
MCC/WORKS/21/07/01 LOT 3 |
UPGRADING OF DUNDUZU-NKHORONGO TO CHOMA TURN-OFF ROAD |
implementation
|
construction |
Upgrading from earth road to bitumen standard |
To ease mobility challenges and spur economic developments through businesses and transportation of agricultural produce. |
2022-07-15 |
2024-07-15 |
MWK |
3035607394.50 |
|
|
154 |
GESD/02G/1 |
Construction of a staff house at Mngoni health centre |
completed
|
construction |
Construction of a staff house |
to help with the accommodation of heath care personnel so as to reduce time taken to reach duty station |
2021-11-14 |
2022-02-12 |
MWK |
26500000.00 |
|
|
156 |
DDF/03D/4 |
Construction of a traditional court at Mpenu Headquarters T/A Mazengera |
completed
|
construction |
Construction of a traditional court and two VIP Toilets |
to provide a proper place for traditional court cases to be heard and judged |
2021-11-15 |
2022-02-13 |
MWK |
25000000.00 |
|
|
158 |
MCC/W/CO/20/08/01 |
CONSTRUCTION OF MZUZU CITY COUNCIL CIVIC OFFICE COMPLEX |
implementation
|
construction |
Construction of ground plus two storey buildings to accomodate all departments at Mzuzu City Council with conference rooms |
To improve office space as a motivation for staff. At the end this will be one stop centre for servicing the city. |
2022-06-01 |
2024-06-01 |
MWK |
12193720226.37 |
|
|
157 |
MCC/WORKS/BRG/21/07/01 LOT 2 |
SONDA-DUNDUZU ROAD |
implementation
|
construction |
UPGRADING FROM EARTH ROAD TO BITUMEN STANDARD |
TO EASE MOBILITY CHALLENGES AND SPUR ECONOMIC DEVELOPMENT -BUSSINESSES AND AGRICULTURAL PRODUCE |
2022-06-01 |
2025-06-01 |
MWK |
5856857874.98 |
|
|
162 |
LCC/1/pw |
construction of kawale foot bridge under ward development fund. |
completed
|
construction |
construction of kawale foot bridge under ward development fund. between kawale 1 and kawale 2 |
to allow people to cross the bridge safely |
2022-03-18 |
2022-05-20 |
MWK |
6986005.79 |
|
|
163 |
LCC/1/pw |
masaf culvert installation under constituency development fund |
completed
|
construction |
masaf culvert installation under constituency development fund in area 49 |
improve drainage in lilongwe city, for easy crossing of cars and people |
2022-06-04 |
2022-08-16 |
MWK |
18603347.00 |
|
|
164 |
LCC/1/pw |
Rehabilitation of old town bus deport under roads fund Administration |
completion
|
rehabilitation |
Rehabilitation of old town bus deport under roads fund Administration |
improving good roads access to the people in lilongwe city. |
2021-10-11 |
2022-09-12 |
MWK |
1024317687.25 |
|
|
166 |
LCC/1/pw |
lilongwe water and sanitation project under world bank |
implementation
|
construction |
Lilongwe water and sanitation project under world bank, we are currently construction 1000 toilets in lilongwe city. |
To improve sanitation and sewage system in lilongwe city. |
2021-08-14 |
2022-09-30 |
MWK |
2458871970.00 |
|
|
167 |
LCC/1/pw |
Maintenance of Mtandire Mosque Road under ward development fund. |
completed
|
construction |
Maintenance of Mtandire Mosque Road |
improvement of drainage in Lilongwe city |
2022-07-14 |
2022-08-13 |
MWK |
3499200.00 |
|
|
168 |
MoD/W/004/2021 |
EXTENSION OF MANGOCHI POTABLE WATER SUPPLY |
implementation
|
expansion |
Mangochi water supply extension that covers Lakeshore areas from Mpondasi (Bishop's House) to Mtakataka Turn Off |
Supplying potable water to all lakeshore trading centres that include Namiasi, Maldeco, Makawa, Mtakataka Turn-Off and all Holiday resorts along the lake |
2021-02-01 |
2023-04-11 |
USD |
14400000.00 |
|
|
169 |
ZCC/GOV/RD/ENG/2021-22/23 |
Upgrading of Sadzi Sadzi THA Road to Last Night |
implementation
|
construction |
Upgrading 1.8 km to asphalt finishes |
Provide access to traders and reduce stray of water run off into households. |
2021-12-18 |
2022-05-17 |
MWK |
801611277.75 |
|
|
171 |
MoD/W/004/2021 |
FEASIBILITY STUDIES AND DETAILED DESIGNS FOR AN ADDITIONAL WATER SOURCE FOR ZOMBA CITY AND SURROUNDING AREAS |
identification
|
replacement |
Carrying out feasibility studies and detailed designs for an additional water source for Zomba City and surrounding areas |
To have an alternative source of water for Zomba City and surrounding areas |
2021-02-01 |
2023-04-11 |
USD |
1193566.20 |
|
|
100 |
13/2019 |
Construction of Inkosi ya Makosi M'mbelwa University |
preparation
|
construction |
A learning and teaching facility |
provide a learning facility to the nation |
2016-08-22 |
2023-08-21 |
MWK |
53208000000.00 |
|
|
172 |
32 |
Construction of mkwakwata police post |
preparation
|
construction |
Construction of mkwakwata police post |
To add public infrastructure |
2022-08-01 |
2022-08-10 |
MWK |
888888888888.88 |
|
|
12 |
17/2017 |
Construction of Blantyre Police |
implementation
|
construction |
Construction of Police offices and Associated Works |
To improve security services to the nation |
2019-04-15 |
2022-12-15 |
MWK |
533907504.13 |
|
|
145 |
44 |
Construction of mkanga concrete deck bridge,single span 8m long |
preparation
|
construction |
Construction of mkanga concrete deck brigde,single span 8m long |
To ease transportation challenges and accessibility to markets,school and hospital |
2022-08-03 |
2022-08-16 |
MWK |
150659580000.00 |
|
|
176 |
CKDC/GESD/NCB/2021-22/03 |
Construction of Kanzimbi health post |
completed
|
construction |
Health facility |
good health for community |
2021-12-09 |
2022-03-31 |
MWK |
414571.35 |
|
|
177 |
TD-OX/ZCC/21/172/LLW-MW/007/A |
Construction of Single Lane Bridge along Likangala River |
implementation
|
construction |
Single Concrete Deck Bridge |
The Bridge has been constructed along as part of evacuation route reaching Multipurpose Evacuation Centre in Chambo ward |
2021-10-08 |
2022-03-27 |
MWK |
75573550.00 |
|
|
178 |
001 |
maintenance of EPA hall |
implementation
|
construction |
maintenance of EPA hall |
To maintain EPA hall |
2022-08-01 |
2022-08-17 |
MWK |
999999999999.99 |
|
|
179 |
DDF/01D/2 |
Construction of a Classroom block at Kakolo Primary school |
completed
|
construction |
Construction of a two roomed classroom block |
to reduce the high pupil to classroom ratio |
2021-12-29 |
2022-03-29 |
MWK |
25000000.00 |
|
|
180 |
34 |
Lingoni Primary School |
completion
|
construction |
Construction of 1 two roomed classroom block at T.A. Mposa Machinga South Constituency Chamba Ward |
To increase the number of classroom blocks at the institution thereby increasing pupil classroom ratio |
2021-09-04 |
2022-03-23 |
MWK |
26000000.00 |
|
|
70 |
MBS/IPC/BE495/2013 |
Development of a Robust Standardization, Quality Assurance, Accreditation and Metrology (SQAM) Infrastructure in Malawi |
implementation
|
construction |
Construction of Office and Laboratory Complex |
To build capacity in regulating requirements of the Malawi Bureau of Standards (MBS) by improving testing requirements and thereby contribute to the improvement of export trade, economic improvement and welfare of Malawians |
2016-02-01 |
2018-01-31 |
MWK |
18690052500.00 |
|
|
181 |
MBS/SWE/SH/01 |
CONSTRUCTION OF STAFF HOUSES AT SONGWE |
identification
|
construction |
CONSTRUCTION OF THREE TWO-BEDROOM STAFF HOUSES AT SONGWE |
TO ACCOMODATE MBS STAFF WORKING AT SONGWE BORDER |
2022-12-01 |
2023-06-30 |
MWK |
200000000.00 |
|
|
38 |
MJDC-IPDC-20/21-DDF-W-3-DDF |
Construction of Nthiramanja Police Unit |
completed
|
construction |
Construction of a police Unit, with two holding cells, with Substation's office |
to improve security |
2021-06-01 |
2021-08-31 |
MWK |
50000.00 |
|
|
184 |
CC/ADM/01/CW/12/2020 |
Expansion of Chancellor College Construction of Administration Office Block |
implementation
|
expansion |
Construction of administration block |
The purpose is to enhance quality and efficiency in the University of Malawi |
2021-08-20 |
2023-08-21 |
MWK |
8961824573.92 |
|
|
185 |
06 |
Mkazimasika 4 bridge construction |
completion
|
construction |
Bridge construction contract ref no 091/MHG/CDF/Machinga South East/Mkazimasika 4 bridge/06/2021 |
To ease accessibility to markets,hospital and school |
2021-06-25 |
2021-08-20 |
MWK |
4979400.00 |
|
|
165 |
LCC/1/pw |
Upgrading of penyenye to mtaya road via mtsinje under government fund. |
implementation
|
construction |
Upgrading of penyenye to mtaya road via mtsinje under government fund. |
Improving road network in lilongwe city |
2021-12-03 |
2022-09-12 |
MWK |
3500000000.00 |
|
|
187 |
DDF2021 |
Kawere Fish Ponds |
implementation
|
construction |
Construction of 20 No fish Ponds and associated works which include Solar powere borehole Fencing, lighting at T/A Kawere in Mchinji District |
Fish farming promotion in Mchinji Dkistrioct |
2022-01-16 |
2022-04-30 |
MWK |
48346667.50 |
|
|
188 |
ZCC/RF/RD/ENG/2021-22/06 |
Upgrading of Sogoja Road in Zomba City |
implementation
|
construction |
3km Road with 200mm crush run, asphalt 35mm compacted Thickness, drainage both sides, supply, delivery and installation of streetlights and concrete poles. |
To increase city revenue base so as to ensure service delivery is absolute provided. |
2022-03-30 |
2022-09-26 |
MWK |
1376931486.00 |
|
|
189 |
MJDC-IPDC-21/22-W-6-GESD |
Construction of Access Roads at Mulanje New Lines |
completed
|
construction |
Construction of Access Roads at Mulanje New Lines in Mulanje Central Constituency |
to improve urban housing development to achieve the councils reform strategy |
2022-01-17 |
2022-04-20 |
MWK |
53325000.00 |
|
|
191 |
MUBAS/PSIP/RFP/02/2022 |
Construction Of MUBAS Administration, Research, Teaching And Learning Complex And Associated External Works |
preparation
|
construction |
Construction Of MUBAS Administration, Research, Teaching And Learning Complex And Associated External Works |
To construct a MUBAS Administration block, Research, Teaching And Learning Complex And Associated External Works |
2022-06-25 |
2027-06-14 |
MWK |
80000000000.00 |
|
|
193 |
MUBAS/PSIP/SCIENCEBLOCKREHAB/2022 |
Rehabilitation of the Science Block |
preparation
|
rehabilitation |
Rehabilitation of the Science Block |
To rehabilitate the science block which houses key laboratories for physics, chemistry, biology and electrical engineering. |
2023-01-02 |
2023-03-31 |
MWK |
1200000000.00 |
|
|
195 |
MJDC-IPDC-21/22-W-2-GESD |
Rehabilitation of Tchelekere Irrigation Scheme |
implementation
|
rehabilitation |
Rehabilitation of Tchelekere Irrigation Scheme in Mulanje-Limbuli Constituency |
to improve food security |
2022-01-17 |
2022-04-20 |
MWK |
50000000.00 |
|
|
196 |
MJDC-IPDC-21/22-W-5-GESD |
Rehabilitation of Mulanje District Hospital paying ward |
completed
|
rehabilitation |
Rehabilitation of a paying ward |
to improve health service delivery |
2021-12-21 |
2022-03-21 |
MWK |
7000000.00 |
|
|
198 |
MJDC-IPDC-21/22-W-4-GESD |
Construction of Ndanga maternity Wing |
completed
|
construction |
Construction of Ndanga Maternity Wing |
to improve maternal health |
2021-12-21 |
2022-04-26 |
MWK |
80000000.00 |
|
|
44 |
RA/DEV/2020-21/06 |
THE CAPACITY IMPROVEMENT OF THE KENYATTA ROAD TO MULTI CARRIAGEWAY (6 LANES) |
implementation
|
expansion |
Pursuant to the Malawi Growth and Development Strategy (MGDS III), 2018 and the Transport Master Plan, 2018, the Malawi Vision 2063, 2021 which are recent policy documents that articulates issues related to both economic growth and development in the Transport Sector, the Government of the Republic of Malawi is expanding the Kenyatta road from a single carriageway to a multi carriageway (6 lanes) in the City of Lilongwe. |
Reduction in Travel Time
Once the project is completed it will reduce travel time between Lilongwe Old Town and City Centre. Currently it takes about 1 hour to travel between the two places and the journey would take less than 10 minutes.
Reduction in vehicle Operating Costs
Due to reduced travel time, vehicle operating costs would be greatly reduced in terms of wear and tear and usage of fuel.
Enhanced Road Safety for all road users
With the introduction of a dedicated lane for cyclists and a separate pedestrian walkway road safety for all road users will be enhanced and will result in the reduction of accidents between motorised and non-motorised traffic.
Direct employment during construction
Many people will be employed during the implementation of the project. |
2021-09-15 |
2023-03-15 |
MWK |
19042052151.71 |
|
|
200 |
RA/DEV/2020-21/05 |
Capacity Improvement of Mzimba Street |
implementation
|
expansion |
Expanding the capacity of the Mzimba Street from two to four lanes . The works will also include construction of a partial Cloverleaf Interchange replacing the current roundabout at Kamuzu Central Hospital/ Petroda Filling Station. Then the expansion works will proceed to Lilongwe Bridge, just after passing the Kamuzu Central Hospital and Central Medical Stores Trust. |
Reduction in Travel Time |
2022-04-01 |
2023-03-27 |
MWK |
9878866404.25 |
|
|
201 |
RA/M7/U51 |
Upgrading of Ntchisi - Malomo road |
implementation
|
construction |
The Ntchisi - Malomo (M7/UD51) road project starts from Malomo Trading Centre where the first 3kilometers of the road was upgraded from earth to bitumen standard under Maintenance Programme of Roads the Authority. The road goes southward passing through a gentle terrain towards Ntchisi town in Ntchisi district. |
UPGRADING OF A 10 KM SECTION ON NTCHISI – MALOMO (M7/UD51) ROAD. The project will have many benefits to the people along the road and to the country as a whole. |
2021-08-01 |
2022-05-02 |
MWK |
4173351450.99 |
|
|
202 |
RA (T378) |
UPGRADING OF A 10 KM SECTION ON MONKEY BAY – CAPE MACLEAR (T378) ROAD |
implementation
|
expansion |
The Monkey Bay Cape Maclear (T378) road starts at Cape Maclear junction on the Monkey Bay road and continues west-northward passing through mountainous areas to Cape Maclear Tourist area and Lake Malawi National park in Mangochi district. |
Vehicle operating costs savings constitute the most important benefit attributable to the project. This will have direct reduction on maintenance cost of the vehicles, reduced fuel consumption and travel time. |
2021-11-01 |
2022-07-31 |
MWK |
3563898954.27 |
|
|
203 |
RA/DEV/ |
Dedza One Stop Border Post |
completion
|
construction |
The project involves construction of a new border facility at Dedza. The following facilities will be constructed at the new Dedza border facility; Main Passenger terminal and Port health building, Office Block for MRA, MBS and other agencies, Bus inspection shed, warehouse, Scanner shed, Voltage regulator room for scanner equipment, Animal and plant/ Agriculture products clearance building, Cargo Inspection shed, Transformer and electrical equipment house, Generator house, Solar equipment house, Gate houses, parking areas and roads and Permanent fence |
The construction of the border will lead to an improvement in the processing of imports and exports at the border crossing between Malawi and Mozambique which will see a reduction in truck and passenger wait time at the border once the facility becomes a One Stop Border Post. |
2021-03-07 |
2022-03-07 |
USD |
9569684.58 |
|
|
204 |
RA/DEV/2 |
Mwanza One Stop Border Post |
implementation
|
construction |
The project is located at the border with Mozambique in Mwanza.
The works involve expansion of the existing border facility at Mwanza Border Post by constructing the following additional structures; main Passenger terminal and Port health building, Office Block for MRA, MBS and other agencies, Bus parking and inspection shed, New electrical and transformer room, Generator room, Parking areas, access roads and perimeter fence. |
The construction of the border will lead to an improvement in the processing of imports and exports at the border crossing between Malawi and Mozambique which will see a reduction in truck and passenger wait time at the border once the facility becomes a One Stop Border Post. |
2021-03-07 |
2022-07-31 |
MWK |
3178360156.45 |
|
|
205 |
RA/DEV/2018-19/04 |
B. UPGRADING OF MZIMBA-MZARANGWE ROAD |
implementation
|
construction |
The current project involves upgrading 45 Km of the road which include 15.4Km of the M022 road section from Mzimba Boma (M009/M022 Junction) to the M022/M001 Junction and 30Km section of the S107 from Mtangatanga Turn Off (M022/S107 junction) up to Mtantha trading center. The two road sections will be upgraded from earth to bitumen. |
The project will have many benefits to the people along the road and to the country as a whole. Some of the benefits will include;
6.1 Shorter Route
The road will provide a shorter route for travellers between Lilongwe and Mzuzu who would like to pass through Mzimba Boma.
6.2 Road Maintenance costs
With the upgrading of this road to bitumen standard, road maintenance costs will be greatly reduced greatly.
6.3 Vehicle Operating and Passenger Travel costs
Vehicle operating costs savings constitute the most important benefit attributable to the project. This will have direct reduction on maintenance cost of the vehicles, reduced fuel consumption and travel time. Passengers will now be paying less and spending less time on travel. Availability of buses and minibuses will greatly improve transportation of passengers.
6.4 Agriculture
The area where the road passes is an agricultural area for mainly tobacco, maize and groundnuts. The upgrading of the road will ease problems of transporting farm inputs and produce to and from various markets.
6.5 Environmental and Health
The upgrading will reduce the occurrence of dust and mud along the project area and thereby improving sanitation that means reduction in the spread of diseases, which are airborne or waterborne. This will reduce the cost of medicines, which would have been required to treat the people affected. The upgrading of the road will allow the communities good access to health facilities in town especially for referral cases.
6.6 Employment Creation and Business Boosting
The people around the area of the road project will also benefit by being employed in various road activities by the Contractor. During project implementation and after, many businesses will mushroom along the project road and the communities will be empowered economically. |
2019-04-11 |
2022-06-09 |
MWK |
10959872880.03 |
|
|
206 |
002 |
Construction of market shed at Mulipa market shed in Machinga Central East |
implementation
|
construction |
Construction of market shed with concrete benches |
To ease space for vendors to display their merchandise |
2022-07-28 |
2022-08-30 |
MWK |
36852450.00 |
|
|
215 |
NOCMA/ICB/S/MECHANICAL/2021/1 |
DESIGN AND INSTALLATION OF FUEL TANKS |
preparation
|
expansion |
Tanks provide storage of product at strategic fuel reserves according to the recommended storage amounts set in line with SADC requirements |
To construct additional tanks at Mzuzu, Lilongwe and Blantyre to increase fuel storage capacity |
2022-09-22 |
2024-04-30 |
MWK |
18000000000.00 |
|
|
170 |
ZCC/GOV/RD/ENG/2021-22/02 |
Upgrading of Namiwawa Road Extension |
implementation
|
rehabilitation |
Rehabilitation and upgrading of Namiwawa road, and expansion of the carriage to include pedestrian walkways, and drainage structures. |
Provision of access to traders, and citizenry. |
2022-05-30 |
2022-09-26 |
MWK |
1250107327.50 |
|
|
218 |
RA/DEV |
CAPACITY IMPROVEMENT OF CROSSROADS ROUNDABOUT TO KANENGO ROAD PROJECT |
preparation
|
expansion |
The Government of Malawi signed a grant agreement for the capacity improvement of
part of the M1 road from Cross roads round about up to Kanengo junction with
Chendawaka which is 10 kilometers long. The road will be constructed to dual
carriageway. Each lane will be 3.4m wide with a cycle track of 1.5 and a pedestrian track
of 1.5m. Street lighting will be in the middle of the road in the 1500 mm wide median
arching in two directions. |
Reduction of Traffic Congestion is expected upon completion of the project. The
road will complement the capacity of the interchange |
2020-12-28 |
2023-12-27 |
CNY |
177250000.00 |
|
|
225 |
LCC/CDF/11/21/BOREHOLES/LLCW |
DRILLING OF EIGHT BOREHOLES IN LILONGWE CITY WEST CONSTITUENCY |
completed
|
construction |
Drilling of eight boreholes in lilongwe city west constituency |
Providing safe water to the community and easy accessibility of water to the community. |
2022-06-22 |
2022-11-24 |
MWK |
29028616.48 |
|
|
226 |
LCC/CDF/08/22/BOREHOLES/LLCSW |
DRILLING OF SIX BOREHOLES IN LILONGWE CITY SOUTH WEST UNDER CDF |
completed
|
construction |
Drilling of six boreholes in lilongwe south west |
Providing safe water and easy accessibility of safe water to the community |
2022-11-30 |
2023-01-29 |
MWK |
26600673.00 |
|
|
51 |
LCC/IPDC044/08/21 |
Draiange Improvement on katete-Dimba Road in area 24-Lot 3 |
completed
|
construction |
Improvement of Dranage on katete-Dimba in are 24 |
Drainage improvement in the city |
2022-04-27 |
2022-08-24 |
MWK |
59712883.13 |
|
|
152 |
LCC/WDF/04/22/DRAINAGE/KABWABWA |
Construction of drainage in kabwabwa ward under ward development fund in lilongwe city centre constituency s |
completed
|
construction |
Drainage improvement in kabwabwa ward mainly involve installation of 900 and 600mm culvert rings |
Improve drainage system |
2022-06-30 |
2022-08-31 |
MWK |
1868951.25 |
|
|
54 |
LCC/CDF-LLCity west |
CONSTRUCTION OF BOX CULVERT AT MSAMBETA SCHOOL IN STATEHOUSE WARD UNDER CDF PROJECT |
completed
|
construction |
CONSTRUCTION OF BOX CULVERT AT MSAMBETA SCHOOL IN STATEHOUSE WARD UNDER CDF PROJECT |
Drainage improvement in the city |
2022-04-27 |
2022-07-25 |
MWK |
23009787.50 |
|
|
76 |
LCC/CDF/11/21/BOREHOLES/LLCW |
DRILLING OF EIGHT BOREHOLES IN LILONGWE CITY WEST WARD UNDER CDF PROJECT |
completed
|
construction |
Drilling of eight boreholes in lilongwe city west ward under CPF project |
Improving peoples health by supplying portable water to the community at a cheaper price, which will be readily available at the point of need. |
2022-07-29 |
2022-10-27 |
MWK |
29028616.48 |
|
|
77 |
LCC/IPDC/193/03/21(Lot 1a Kauma) |
UPGRADING/REHABILITATION OF SELECTED LILONGWE CITY ROADS AT AREA 12- KAUMA |
completed
|
rehabilitation |
Rehabilitation of roads in area 12 (Mwambo road) and Kauma |
Improve Transportation |
2021-10-18 |
2022-03-17 |
MWK |
1328175946.35 |
|
|
73 |
LCC/CDF/01/22/ZION BRIDGE/ CHINSAPO 1 |
CONSTRUCTION OF BOX CULVERT AT ZION BRIDGE IN CHINSAPO 1 UNDER CONSTITUENCY DEVELOPMENT FUND (CDF) IN LILONGWE CITY WEST CONSTITUENCY |
completed
|
construction |
A box culvert is being constructed at Zion |
Drainage improvement |
2022-06-20 |
2022-09-18 |
MWK |
18499590.00 |
|
|
115 |
NRWB/MNWEP |
Malawi NRWB Water Efficiency Project- Mzuzu, Ekwendeni and Chintheche |
implementation
|
construction |
The Northern Region Water Board (NRWB) is implementing the Malawi NRWB Water Efficiency Project in Mzuzu City, Ekwendeni Town and Chintheche Town. The project is financed by the European Investment Bank (EIB) at an estimated cost of MK19.6 billion (€24.6million). |
The aim of the project is to contribute to the economic development of Malawi by improving the health and livelihoods of the residents of Mzuzu City, Chintheche Town and Ekwendeni Town through rehabilitation and expansion of the existing water supply systems in order to provide reliable and sustainable potable water services by increasing capacity of Ekwendeni treatment and by increasing storage capacity in Mzuzu City. The project will in addition roll out prepaid water meters and implement water demand management strategies to control water loss. The project will impact positively 55,400 beneficiaries in Ekwendeni, 21,300 in Chintheche and 345,450 beneficiaries in Mzuzu City by year 2035. |
2017-07-04 |
2024-04-30 |
EUR |
24600000.00 |
|
|
133 |
ZDC/GESD/DDF/W/2021/2022/3 |
Nasawa police unit |
completed
|
construction |
Police unit fully constructed and handed over to community |
for security |
2022-01-01 |
2022-04-30 |
MWK |
59909205.75 |
|
|
214 |
NOCMA/NCB/W/BT/2018/1 |
CONSTRUCTION AND INSTALLATION OF RAIL SIDING PUMP HOUSE AND ASSOCIATED EQUIPMENT AT LILONGWE AND BLANTYRE DEPOTS |
implementation
|
construction |
Construction of Rail Siding facility at Blantyre Depot located at Matindi area and Lilongwe depot located at Area 51 |
Construction of Rail Siding facility at Lilongwe and Blantyre Depots to enable NOCMA to offload product using Rail wagons |
2018-12-31 |
2022-11-15 |
MWK |
4012176750.50 |
|
|
8 |
MW-LWSP-26088-CS-QCBS |
LILONGWE WATER AND SANITATION PROJECT (LWSP) |
implementation
|
construction |
The project scope consists of four components:
1-water distribution network rehabilitation and expansion and Non-Revenue Water reduction; 2-Priority sanitation improvements; 3-Technical assistance; 4-Institutional capacity strengthening. |
The project is to increase access to improved water services and safely managed sanitation. It is expected the project will benefit half a million residents in Lilongwe city. |
2018-03-26 |
2024-12-30 |
USD |
147500000.00 |
|
|
60 |
MW/SADC/GESD/60601 |
MNEMA HEALTH CENTRE |
completion
|
construction |
Construction of Maternity block, Incinerator and Ash pit, Water supply system |
The project is trying to address issues of maternal deaths hence reduce mortality rate in the locality. |
2022-01-21 |
2022-04-30 |
MWK |
134921676.11 |
|
|
132 |
ZDC/GESD/DDF/W/2021/2022/4 |
Namadidi health post |
completed
|
construction |
health post for Namadidi community |
to provide health services to the people of the community |
2022-01-01 |
2022-03-31 |
MWK |
43256987.94 |
|
|
74 |
LCC/CDF/02/22/ROOF REPAIR/KAUMA SCHOOL |
ROOF REPAIR AT KAUMA SCHOOL UNDER CONSTITUENCY DEVELOPMENT FUND IN LILONGWE CITY CENTRE CONSTITUENCY |
completed
|
rehabilitation |
Repairing roof of a school block |
Improve learning conditions for students |
2022-06-02 |
2022-08-01 |
MWK |
4022745.00 |
|
|
155 |
LCC/CDF/04/22/CONCRETE BRIDGE/CHATATA WARD |
Construction of concrete bridge in chatata-ngona ward under CDF in lilongwe City centre constituency-first phase |
completed
|
construction |
Construction of 30m 2 span concrete bridge in chatata ward by infra dev contractors |
Ease transportation of goods and services |
2022-08-26 |
2022-10-27 |
MWK |
43555600.00 |
|
|
159 |
LCC/IPDC/06/22/MAINTENANCE/COLLAPSED FENCE/LUMBADZI MARKET |
Construction of collapsed brick fence at lumbazi marker under local revenue |
completed
|
rehabilitation |
Construction of collapsed brick fence at lumbazi marker under local revenue |
Improve safety in the market place |
2022-08-26 |
2022-10-27 |
MWK |
2813562.50 |
|
|
160 |
LCC/1/ |
construction of box culvert at Chankhandwe under constituency development fund |
completed
|
construction |
Construction of Box culvert at Chankhandwe |
improvement of road infrastructure in the city for easy access to students, women and the residents of Chinsapo and Bwemba areas |
2022-03-21 |
2022-07-21 |
MWK |
17748200.03 |
|
|
33 |
KADC/DDF/W/2020-2021/01 - LOT 1 |
Construction of Staff House at Mwenilondo Health Centre |
completed
|
construction |
The works involve construction of a 3 bed room house with flush toilet, kitchen and stores apartments |
The purpose is to provide housing accommodation to Health Worker working at the Health facility. |
2021-10-15 |
2022-01-13 |
MWK |
2194735050.00 |
|
|
129 |
001 |
Construction of Staff Houses at Nthalire Health Centre |
completed
|
construction |
Two staff houses were constructed at Nthalire Health Centre with GESD funds |
To improve the housing condition of health staff |
2021-12-22 |
2022-03-31 |
MWK |
40000000.00 |
|
|
126 |
DDF001 |
REHABILITATION OF DC'S OFFICE |
completed
|
rehabilitation |
GENERAL MAINTENANCE WORK |
IMPROVE WORKPLANCE ENVIRONMENT |
2022-07-18 |
2022-09-01 |
MWK |
35000000.00 |
|
|
127 |
KADC/DDF/GESD/NYUNGWE ADC OFFICE/2021-22/003 |
Nyungwe ADC Office |
completed
|
construction |
Construction of One office block and one double VIP toilet |
Provide conducive environment for planning and reviewing development project |
2022-01-28 |
2022-04-28 |
MWK |
18892292.00 |
|
|
128 |
GESD001 |
LIVINGSTONIA POLICE UNIT AND ASSOCIATED WORKS |
completed
|
construction |
CONSTRUCTION WORKS OF POLICE UNIT AND DOUBLE LATRINE TOILET |
ENHANCEMENT OF SECURITY MEASURES |
2021-12-16 |
2022-06-30 |
MWK |
42920821.13 |
|
|
194 |
MJDC-IPDC-21/22-W-3-GESD |
Construction of market Toilets |
completed
|
construction |
Construction of 2 holes market toilets at various markets in Mulanje |
to improve sanitation in the markets |
2022-01-17 |
2022-04-20 |
MWK |
26093166.75 |
|
|
71 |
P178914 |
Malawi Emergency Power Restoration Project |
implementation
|
rehabilitation |
Restoration of the damaged infrastructure affected by Tropical Storm Ana including both transmission (132kV & 66kV) and distribution (33kV, 11kV and 400V lines) networks where a number of power line components have been affected. These include steel towers, wooden poles and structures, transformers, conductors and insulators among others. |
The project will help productive and efficient income-generating activities (less time spent on fetching traditional sources of energy and clean water) and enhanced access to information/communication (through phone, radio, television, and so on). The project will also improve quality of public service delivery through both existing connections and increased electricity connections, especially of public facilities such as schools and health centers. |
2022-10-14 |
2024-10-15 |
USD |
15300000.00 |
|
|
93 |
C87-10-18 |
Expansion of Chancellor College School of Economics |
completed
|
expansion |
construction of school of economics |
To enhance quality of economic graduates while and increasing access to University education |
2019-07-01 |
2022-08-21 |
MWK |
3554802243.07 |
|
|
83 |
P178914 |
Malawi Energy Power Restoration Project: Kapichira Dam Rehabilitation and Strengthening |
implementation
|
rehabilitation |
Malawi Energy Restoration Project is an emergency project that is aimed at rehabilitating the Kapichira dam to enable power generation. The Malawi Government with loan of $44.4 million from the World Bank intents to implement this project as a matter of emergency. |
The project aims to restore power generation at Kapichira Powerstation. Kapichira Dam was destroyed by Cycle Ana during the January 2022 floods |
2022-07-01 |
2027-06-16 |
USD |
44400000.00 |
|
|
94 |
BDC/RFQ/IPDC/GESD/2021-2022/03 |
SEMI-DETTACHED COMMERCIAL SHOPS |
completed
|
construction |
CONSTRUCTION OF SEMI-DETTACHED COMMERCIAL SHOPS |
IMPROVING REVENUE GENERATION |
2021-12-13 |
2022-03-30 |
MWK |
21505036.35 |
|
|
88 |
ZADC/GESD/DDF/W/2021/2022/1 |
Chanda Health Post |
completed
|
construction |
Construction of a Health Post at Chanda |
To provide Health Services to the community. |
2022-02-01 |
2022-05-30 |
MWK |
49322206.40 |
|
|
91 |
BDC/RFQ/IPDC/GESD/2021-2022/04 |
CHIDZANJA MARKET SLAUGHTER HOUSE |
completed
|
construction |
CONSTRUCTION OF SLAUGHTER HOUSE AND A VIP PIT LATRINE |
IMPROVING REVENUE GENERATION |
2021-12-13 |
2022-03-30 |
MWK |
15826942.95 |
|
|
40 |
ea83b5f1 |
CONTRUCTION OF NDAKWERA CDSS CLASSROOM BLOCK |
completed
|
construction |
CONSTRUCTION OF NDAKWERA CDSS CLASSROOM BLOCK |
IMPROVE QUALITY EDUCATION SERVICE DELIVERY |
2022-03-03 |
2022-06-01 |
MWK |
32011425.00 |
|
|
197 |
MJDC-IPDC-21/22-W-1-GESD |
Construction of Chimwamesi Bridge |
implementation
|
construction |
Construction of Chimwamesi Bridge |
to ease mobility challenges |
2021-12-21 |
2022-05-22 |
MWK |
65000000.00 |
|
|
84 |
BDC/RFQ/IPDC/GESD/2021-2022/05 |
KACHENGA MARKET SHED |
completed
|
construction |
CONSTRUCTION OF MARKET SHED |
IMPROVING REVENUE COLLECTION THROUGH SAFE AND GOOD MARKETING INFRASTRUCTURE |
2021-12-13 |
2022-03-30 |
MWK |
16251564.00 |
|
|
141 |
74fdbc11 |
Constrution of Nkhate health post |
completed
|
construction |
construction of Nkhate health post |
Improve quality primary health care service delivery |
2021-02-01 |
2022-02-01 |
MWK |
32861212.50 |
|
|
140 |
7b5460c6 |
Construction of Nambesa primary school |
completed
|
construction |
construction of Nambesa primary school, class block. |
Improve quality education service delivery |
2021-06-01 |
2022-03-15 |
MWK |
32813039.81 |
|
|
80 |
BDC/RFQ/IPDC/GESD/2021-2022/06 |
MBERA RESOURCE CENTRE |
completed
|
construction |
CONSTRUCTION OF MBERA RESOUCE CENTRE CLASS ROOM BLOCK AND 2 VIP PITLATRINE TOILETS |
IMPROVING ACCESS TO INFORMATION |
2021-12-13 |
2022-03-30 |
MWK |
27931635.00 |
|
|
81 |
BDC/RFQ/IPDC/GESD/2021-2022/01 |
CHIMATIRO MATERNITY WING |
completion
|
construction |
CONSTRUCTION OF CHIMATIRO MATERNITY WING, SEPTIC TANK, PLACENTA PIT AND WATER TANK |
IMPROVING ACCESS TO MATERNAL HEALTH |
2021-12-13 |
2022-04-30 |
MWK |
44155453.17 |
|
|
99 |
NCB-MUST-S-2022/23-160 |
Extension and Alteration of the Teaching Hospital at Malawi University of Science and Technology (MUST) |
implementation
|
expansion |
The proposed works shall include the construction of a three-storey structure to match the existing number of floors for the existing building, purposefully designed to work and function as a hospital, with special consideration to all
technical requirement for a Hospital Building to make sure it is accessible by all
groups of people regardless of their physical ability. Ideally, the teaching hospital extension shall be used for the following purposes but not limited to the same, as such the consultant shall do their own research to enhance a functional approach
for the facility.
The floor matrix combination is that one desired by the client as annotated by Ground floor (GF),
First floor (FF) and Second Floor SF). If, however, there is a strong design challenge
to the preferred floor matrix as proposed by the client, the consultant shall liaise
with the client and propose an alternative combination. |
-Restore the University’s facilities outlook
-Operationalise the teaching hospital as learning facility
-offer specialized critical medical care to the public
- Increase income generating capacity for the University
-Reduce medical tourism for specialized medical services |
2022-07-01 |
2025-06-30 |
MWK |
4500000000.00 |
|
|
134 |
WORLDBANK/SAVE/MUST/LT/2022 |
Construction of a 500 Seater Lecture Threatre |
implementation
|
construction |
A single Building with two large rooms each with a seating capacity of at least 250 students which will be used for teaching and learning and conferencing for larger groups of students and other stakeholders. The Lecture theatre design will be based on that of the auditorium, designed for an audience and performer relationship, providing students/spectators with excellent visibility of the main stage or platform. The lecture theatres shall be installed with tiered seating, enabling those sitting right at the back to be able to see and hear what is happening at the front. |
The Lecture Theatres shall be used for the following Purposes
i. Teaching and presenting
ii. Performances
iii. Staff meetings
iv. Drama classes
v. Interactive learning and discussion |
2022-07-01 |
2025-06-19 |
USD |
2650000.00 |
|
|
96 |
NCB-MUST-W-2020/21-130 |
Construction of a Mini-Industrial Park |
implementation
|
construction |
The Malawi University of Science and Technology received an equipment grant from the Chinese Government and the African development Bank (ADB); part of the equipment from ADB had been delivered while the University awaits delivery of the equipment from China in the course of the year.
The University intends to apply some of the equipment towards the processing of: water, dairy, leather and ceramic products for training and income generating activities. It is imperative for the University to have necessary infrastructure ready to accommodate the equipment. The Mini-Industrial Park project is designed for this purpose on top of being a Teaching and Learning, research and Development and Income generating facility for the University |
-Improve students’ practical experience
-Increase income generating capacity for the University
-Facilitate research and Development for Malawi
-Accelerate innovative productive development for Malawi |
2021-03-25 |
2022-12-24 |
MWK |
938601057.01 |
|
|
82 |
NCB-MUST-W-2021/22-135 |
Construction of a Purpose Built Science Laboratory Complex |
implementation
|
construction |
The Purpose Built Science Laboratory is one of the Major Projects for the Malawi University of Science and Technology, at a construction cost of MK 14.3 Billion, it is a flagship project for the University meant to accommodate all Laboratory, workshop, research, teaching and Diagnostic needs for the University. This projects complements the University's status as a Science and Technology University, a cornerstone for the Very existence of MUST. |
-Facilitate quality Teaching and Learning for the MUST
-Enhance vital medical research for the Country
-Increase brand visibility and footprint for MUST at regional level
- Increase income generating capacity for the University |
1922-06-18 |
2025-06-17 |
MWK |
14298344928.00 |
|
|
213 |
BTDC/BT/CDF/338/2022 |
Chaweta primary school electrical installation |
completed
|
construction |
installation of electricity in classrooms and staff houses |
improve service delivery |
2022-07-22 |
2022-09-22 |
MWK |
18000000.00 |
|
|
211 |
W/DDF/NORTH/05/2022 |
Kamwiri health post |
implementation
|
construction |
construction of health post |
improve health services |
2022-07-15 |
2021-09-30 |
MWK |
18000000.00 |
|
|
124 |
KADC/DDF/GESD/MUKOLE CL/2021-22/002 |
MUKOLE JUNIOR PRIMARY SCHOOL |
completed
|
construction |
Construction of one double classroom block, one double VIP toilet and procurement of desks |
Provide conducive teaching and learning environment for both teachers and learners |
2022-01-28 |
2022-04-28 |
MWK |
30000000.00 |
|
|
137 |
P158805 |
Shire Valley Transformation Programme-1 (Construction of the Intake and First 6km of the Main Canal) |
implementation
|
construction |
Construction of the intake at Kapichira Dam and the first 6kms of the main canal |
Promotion of irrigation services to smallholder farmers and other farmers in the Shire Valley. 43,370 hectares to be irrigated through the project. |
2020-04-13 |
2024-09-30 |
USD |
31679094.92 |
|
|
25 |
RA/DEV/2019-20/10 |
Upgrading of Kapiri - Mkanda |
implementation
|
construction |
This project involves the construction to bitumen standard of approximately 10km of road section from Mkanda towards Kapiri. The Road will be upgraded to an all-weather bitumen standard road with a cross section of 6.8m carriageway and 1.5m shoulders with an asphalt concrete surfacing. |
The project will have many benefits to the people of Mkanda and Kapiri. Some of the benefits will include;
1. Reduction of Travel Time
The road upgrade will greatly reduce the travel time of road users in the surrounding community.
2. Maintenance costs
With the new construction from gravel to bituminous surfaced standard, the road will operate in an all-weather condition. Ultimately, emergency maintenance works during the rainy season and costs will be reduced as concentration will be on routine maintenance activities such as drainage structures cleaning, line marking, grass cutting and patching of any potholes that may occur.
3. Vehicle Operating and Passenger Travel costs
Vehicle operating costs savings constitute the most important benefit attributable to the project. This will have direct reduction on maintenance cost of the vehicles, reduced fuel consumption and travel time.
Passengers will now be paying less and spending less time on travel. Availability of buses and minibuses will greatly improve.
4. Agriculture
The area where the road passes is an agricultural area for mainly tobacco, maize, beans, potatoes and groundnuts. The upgrading of the road will ease problems of transporting farm inputs and produce to and from various markets.
.
5. Employment Creation and Business Boosting
The people around the area of the road project will also benefit by getting employed in various road activities by the Contractor. During project implementation and after, a lot of businesses will be enhanced along the project road and the communities will be empowered
6. Environmental and Health
The upgrading will reduce the occurrence of dust and mud along the project area and thereby improving sanitation which means reduction in the spread of diseases which are airborne or waterborne. This will reduce the cost of medicines which would have been required to treat the people affected. The upgrading of the road will allow the communities good access to health facilities in town. |
2021-08-01 |
2022-04-28 |
MWK |
4300016478.58 |
|
|
75 |
LCC/IPDC/09/07/2021 |
REHABILITATION OF MCHESI TO AREA 23 MARKET ROAD IN LILONGWE CITY (LOT6) |
completed
|
rehabilitation |
Rehabilitation of existing road |
Transportation improvement |
2022-03-14 |
2022-08-11 |
MWK |
1631348669.84 |
|
|
113 |
TD-OX/ZCC/21/172/LLW-MW/006 |
Installation of Gabion Baskets along Likangala River |
implementation
|
construction |
Prepare and Install gabions baskets along Likangala river in selected critical points. |
Reduce eroding of river banks and maintain river course so as flooding is minimized. |
2021-10-18 |
2022-03-27 |
MWK |
240945300.00 |
|
|
112 |
TD-OX/ZCC/21/172/LLW-MW/005 |
Construction of 2 Evacuation Centres in Likangala and Chambo Wards |
completed
|
construction |
Multipurpose Evacuation Centers |
Accommodate displaced flood victims usually occur along Likangala River |
2021-10-25 |
2022-04-27 |
MWK |
139440574.20 |
|
|
79 |
11/2020 |
Construction of houses for security institutions |
implementation
|
construction |
houses for IPYANA and songwe in karonga,malaya pmf camp in mangochi,mwanza and neno police station,area 30 in lilongwe,mvera in dowa,mzuzu,immigration headquarters lilongwe |
provide housing for security officers |
2020-11-30 |
2022-12-24 |
MWK |
12675679000.00 |
|
|
102 |
05/2019 |
construction of new premises for the "C" division of malawi police service |
preparation
|
construction |
office space and work stations |
provide better office space for the officers |
2019-05-17 |
2025-05-18 |
MWK |
11075200000.00 |
|
|
173 |
37ad3c5e |
Dulansanje teachers house |
completed
|
construction |
Construction of Dulansanje teachers house |
Improved quality education service delivery |
2021-07-01 |
2022-03-31 |
MWK |
29000000.00 |
|
|
183 |
MJDC-IPDC-2020/2021-W-1-DDF |
Construction of a School Block at Nkuta CDSS |
completed
|
construction |
Construction of a two-classroom school block at Nkuta Community Day Secondary School |
To improve Education standards in the district |
2021-06-01 |
2021-08-31 |
MWK |
40000000.00 |
|
|
182 |
MJDC-IPDC-2020/2021-W-2-DDF |
Construction of a School Block at Waluma CDSS |
completed
|
construction |
Construction of a Two-Classroom school block at Waluma Community Day Secondary School. |
To improve Education Standards in the District |
2021-06-01 |
2021-08-31 |
MWK |
40000000.00 |
|
|
89 |
08/2017 |
construction of mponera community hospital |
implementation
|
construction |
In dowa district |
provide a healthy institution to the community |
2019-05-27 |
2022-05-27 |
MWK |
7953522080.13 |
|
|
90 |
51/2015 |
Construction of National Indoor sports stadium complex |
implementation
|
construction |
Indoor sports complex,Area 48 next to Bingu National stadium in Lilongwe. |
provide sporting facility to the community |
2021-01-04 |
2022-09-26 |
MWK |
7770430405.57 |
|
|
101 |
07-2022 |
Construction of Capital Hill Clinic |
implementation
|
construction |
Associated External works at capital hill |
To help people in an area to provide health facility' |
2022-07-18 |
2023-01-23 |
MWK |
970127330.14 |
|
|
103 |
07-2022 |
Construction of security staff houses for police services |
implementation
|
construction |
staff houses for police services in Lilongwe city |
for better living of standard |
2022-12-07 |
2023-01-23 |
MWK |
999679166196.60 |
|
|
104 |
03/2022 |
construction of staff houses for malawi police |
implementation
|
construction |
staff houses for security officers |
provide houses to security officers |
2022-03-21 |
2022-12-30 |
MWK |
1165826759.61 |
|
|
106 |
48/2020 |
Rehabilitation of kamudzu central hospital kitchen |
implementation
|
rehabilitation |
FIxing and maintaning the kitchen structure |
Remodelling of the current kitchen into a better one |
2021-05-20 |
2022-08-31 |
MWK |
95810334.11 |
|
|
107 |
50/2020 |
Rehabilitation of offices at MWASIP |
implementation
|
rehabilitation |
Rehabilitation of offices at MWASIP |
for better standard of |
2021-04-01 |
2022-10-30 |
MWK |
275080202.60 |
|
|
108 |
03/2022 |
Completion of social amenities community ground hall,library and bus deport |
implementation
|
construction |
community ground,hall,library,bus deport |
Provision of social services to the community |
2022-03-04 |
2022-10-21 |
MWK |
618353349.71 |
|
|
109 |
18/2020D |
Construction of staff houses for Malawi police |
implementation
|
construction |
staff houses for malawi police in Lilongwe |
for a better living |
2022-07-12 |
2023-04-28 |
MWK |
857483415.86 |
|
|
110 |
19/2022 |
Construction of prison houses |
implementation
|
construction |
security institutions houses for prison staff |
provide houses to prison staff |
2022-03-21 |
2023-04-29 |
MWK |
2235379805.56 |
|
|
151 |
LCC/WDF/01/21/FOOT BRIDGE/ MBVUNGUTI |
Construction of FOOT BRIDGE in mvunguti ward under WDF In lilongwe City centre constituency |
implementation
|
construction |
Construction of FOOT bridge |
Ease transportation of goods and services |
2022-06-30 |
2022-07-31 |
MWK |
4256396.00 |
|
|
153 |
LCC/WDF/02/22/TIMBER BRIDGE |
Construction of Timbe Bridge in Mtsiriza ward under ward development fund in lilongwe City centre constituency |
completed
|
construction |
Construction of timber Bridge in mtsiriza ward by Johaq construction |
Ease movement of people and goods |
2022-06-01 |
2022-07-31 |
MWK |
4860265.00 |
|
|
161 |
LCC/1/pw |
construction of majiga box curvelt under constituency development fund in Area 23 |
completed
|
construction |
Construction of Majiga box curvelt under constituency development fund in Area 23 |
the bridge is used by cars and people when crossing the river |
2022-04-11 |
2022-07-10 |
MWK |
14651000.00 |
|
|
175 |
e89ffc16 |
Kanzimbi health post |
completion
|
construction |
Construction of Kanzimbi Health Post |
Improved quality health service delivery |
2021-12-09 |
2022-03-31 |
MWK |
41000000.00 |
|
|
199 |
MJDC-IPDC-21/22-W-7-DDF |
Construction of reticulated piped water system |
completed
|
construction |
Construction of reticulated piped water system |
to improve portable water availability |
2021-12-21 |
2022-04-20 |
MWK |
30000000.00 |
|
|
208 |
07/2022 |
CONSTRUCTION OF CLINIC AND NON COMMUNICABLE DISEASES ANNEX |
implementation
|
construction |
Completing construction of Clinic which stalled over five years ago. There is an inclusion on a non-communicable disease centre annex which aims at providing gym services. This project will allow civil servants to seek services within premises of their work place. |
Providing a wellness center and gym facility to civil servants |
2022-07-18 |
2023-01-23 |
MWK |
970127330.14 |
|
|
209 |
08/2022 |
CONSTRUCTION OF GOVERNMENT OFFICES |
implementation
|
construction |
The construction of twenty-storey twin towers to accommodate MDA’s in secure and comfortable environment. |
To provide working space for government officers |
2022-08-01 |
2027-08-31 |
MWK |
20000000000.00 |
|
|
233 |
LCC/IPDC/07/22/LLCSE/CDF |
CONSTRUCTION OF VARIOUS BRIDGES(CONSTRUCTION OF KALIYEKA BOX CULVERT) IN LILONGWE CITY SOUTH EAST CONSTITUENCY UNDER CONSTITIUENCY DEVELOPMENT FUND FOR 2022/2023 FINANCIAL YEAR LOT - 3 |
implementation
|
construction |
CONSTRUCTION OF VARIOUS BRIDGES(CONSTRUCTION OF KALIYEKA BOX CULVERT) IN LILONGWE CITY SOUTH EAST CONSTITUENCY UNDER CONSTITIUENCY DEVELOPMENT FUND FOR 2022/2023 FINANCIAL YEAR LOT - 3 BY IPYANA CIVIL ENGINEERING |
IMPROVE TRANSPORTATION OF GOODS AND SERVICES IN KALIYEKA WARD |
2022-12-09 |
2023-02-07 |
MWK |
51332463.00 |
|
|
234 |
MCC/WORKS/18/05/LOT3-PHASE1 |
UPGRADING OF SELECTED ROADS IN THE CITY OF MZUZU |
implementation
|
construction |
The project connects M5 at Mzuzu govt Sec Sch-Luwinga at Mzuzu Coffee. It has four sections as follows: M5-Matete, Matete-Choma, Zolozolo CCAP- Zolozolo Clinic and Mzuzu Technical - Luwinga. |
This is a critical road likely to decongest the city, improve mobility of farm produce, business interventions. It is also a gateway to an environmental conservation site - the Botanic gardens, the Road also acts as a bypass connecting M1 at Luwinga and M5 at Junction to Mzuzu Govt Secondary School. It is undeniably open new opportunities for the people of Mzuzu, its clients and the Council at large. |
2019-08-16 |
2023-08-16 |
MWK |
5837802640.35 |
|
|
235 |
LCC/IPDC/07/22/LLCSE/CDF |
CONSTRUCTION OF VARIOUS BRIDGES(DRAIANGE IMPROVEMENT IN KALIYEKA 2 ) IN LILONGWE CITY SOUTH EAST CONSTITUENCY UNDER CONSTITIUENCY DEVELOPMENT FUND FOR 2022/2023 FINANCIAL YEAR LOT - 3 |
implementation
|
construction |
CONSTRUCTION OF VARIOUS BRIDGES(DRAIANGE IMPROVEMENT IN KALIYEKA 2 ) IN LILONGWE CITY SOUTH EAST CONSTITUENCY UNDER CONSTITIUENCY DEVELOPMENT FUND FOR 2022/2023 FINANCIAL YEAR LOT - 3 BY IPYANA CIVIL ENGINEERING |
IMPROVE DRAIANGE SYSTEM IN KALIYEKA WARD |
2022-12-08 |
2023-02-07 |
MWK |
15083119.00 |
|
|
237 |
102005007 |
Hara Health Centre Staff house and Solar Installation |
implementation
|
construction |
Construction of One Staff House, Single VIP Toilet and Installation of a Water System |
To provide a conducive working environment for the Health workers |
2021-07-01 |
2022-03-31 |
MWK |
27000000.00 |
|
|
240 |
LDC/GESD/2022-23/CDB/01G- Lot 2 |
Construction of a 30 tonne concrete deck bridge at Kanjamwana |
implementation
|
construction |
construction of a 30 tonne concrete deck bridge |
to improve the quality of transportation during rainy season |
2023-01-13 |
2023-04-13 |
MWK |
59250000.00 |
|
|
239 |
LDC/GESD/2022-23/CDB/01G- lot 1 |
Construction of a 30 tonne concrete deck bridge at Likuni River on Mtchayi to Chiponde Road |
implementation
|
construction |
construction of a 30 tonne concrete deck bridge |
to improve the quality of transportation along this road during rainy season |
2023-01-13 |
2023-04-13 |
MWK |
85889856.00 |
|
|
242 |
LDC/GESD/2022-23/CDB/01G- Lot 4 |
Construction of Lumbadzi Box Culverts on Maenje Village to Mtengowanthenga hospita |
implementation
|
construction |
construction of 3 cell box culvert and 2 cell box culvert |
to improve quality of transportation during rainy season |
2023-01-13 |
2023-04-13 |
MWK |
65210613.09 |
|
|
243 |
LDC/GESD/2022-23/CDB/01G- Lot 5 |
Construction of a 30 tonne concrete deck bridge at Nathenje river on Chaseta Village to Njati Village |
implementation
|
construction |
construction of a 30 tonne concrete deck bridge |
to improve quality of transportation during the rainy season |
2023-01-13 |
2023-04-13 |
MWK |
64246884.40 |
|
|
241 |
LDC/GESD/2022-23/CDB/01G - LOT 3 |
Construction of a 30 tonne concrete deck bridge at Livuwadzi on Chimphangu to Kamphira road |
implementation
|
construction |
construction of a 30 tonne concrete deck bridge |
to improve the quality of road transportation during the rainy season |
2023-01-13 |
2023-04-13 |
MWK |
67950915.00 |
|
|
271 |
LDC/GESD/2022-23/CB/04G-LOT2 |
Construction of a classroom block at Mwangu primary school |
implementation
|
construction |
construction of a 2 roomed classroom block |
To reduce the pupil to classroom ratio |
2023-01-13 |
2023-04-13 |
MWK |
41500000.00 |
|
|
272 |
LDC/GESD/2022-23/CB/04G - Lot 1 |
Construction of a Classroom block at Chiputu Primary School |
implementation
|
construction |
Construction of a 2 roomed classroom block |
to reduce the pupil to classroom ratio |
2023-01-13 |
2023-04-13 |
MWK |
41500000.00 |
|
|
277 |
LCC/CDF/2022-2023/MTANDIRE |
Drainage improvement on Glorious Box culvert |
completed
|
construction |
Construction of drains and road improvement leading towards Glorious box culvert |
Improvement of road infrastructure in the city |
2023-02-27 |
2023-04-28 |
MWK |
34752532.50 |
|
|
281 |
LDC/GESD/2022-23/CB/04G-LOT3 |
Construction of a classroom block complete with furniture at Kamganga primary school |
implementation
|
construction |
construction of a classroom block complete with furniture at Kamganga primary school |
To reduce the pupil to classroom ratio |
2023-01-13 |
2023-04-13 |
MWK |
42000000.00 |
|
|
278 |
MW-DDC-316466-CW-RFB |
Construction of Lingadzi Bridge |
implementation
|
construction |
Construction of 27m and 6m Concrete Deck Bridges |
Construction of a bridge |
2023-02-13 |
2023-05-13 |
MWK |
62265658.90 |
|
|
274 |
MW-DDC316277-CW-RFB |
Construction of Dzoole Police Unit (Administration Block) |
implementation
|
construction |
Construction of Administration Block at Dzoole Police Unit |
To provide housing to the Police Unit |
2023-02-15 |
2023-06-14 |
MWK |
70387617.74 |
|
|
269 |
LCC/IPDC/07/22/LLCSW/CDF |
CONSTRUCTION OF KAWALE MARKET SHED BENCHES IN LILONGWE CITY SOUTH WEST CONSTITUENCY UNDER CONSTITUENCY DEVELOPMENT FUND) |
completed
|
construction |
CONSTRUCTION OF VARIOUS PROJECTS (CONSTRUCTION OF MARKET SHED BENCHES) IN LILONGWE CITY SOUTH WEST CONSTITUENCY UNDER CONSTITUENCY DEVELOPMENT FUND) |
Improvement of Market Infrastructure in the City |
2023-01-11 |
2023-03-12 |
MWK |
9910250.00 |
|
|
229 |
LCC/IPDC/07/22/LCC/CDF |
CONSTRUCTION OF AREA 18B NORTHREN FOOTBRIDGE UNDER CONSTITUENCY DEVELOPMENT FUND (CDF) IN LILONGWE CITY CONSTITUENCY-LOT3 |
completed
|
construction |
CONSTRUCTION OF 8m long AREA 18B NORTHREN CONCRETE FOOTBRIDGE UNDER CONSTITUENCY DEVELOPMENT FUND (CDF) IN LILONGWE CITY CONSTITUENCY-LOT3 |
Improve transportation of goods and services from area 18A to area 18B |
2022-11-14 |
2023-01-14 |
MWK |
26406446.99 |
|
|
268 |
LCC/WDF/0/22/CULVERTS/MVUNGUTI |
INSTALLATION OF CULVERTS AT MVUNGUTI WARD UNDER WDF PROJECT |
completed
|
construction |
installation of culverts |
infrastructure improvement in the city |
2023-02-15 |
2023-04-16 |
MWK |
7217100.00 |
|
|
267 |
WDF/CULVERTS-KAWALE1 |
CULVERT INSTALLATION AND CLEANING IN KAWALE 1 |
completed
|
construction |
Installation of concrete culvert rings at various locations in Kawale 1 |
Improvement of road infrastructure in the city |
2023-02-15 |
2023-04-16 |
MWK |
5976647.50 |
|
|
231 |
LLC/IPDC/07/22/LCC/CDF |
CONSTRUCTION OF AREA 18B SOUTHERN FOOTBRIDGE UNDER CONSTITUENCY DEVELOPMENT FUND IN LILONGWE CITY-LOT 2 |
completed
|
construction |
Project includes footing, masonry, steelwork and concrete deck |
To improve mobility between Area 18 A and Area 18 B |
2022-11-21 |
2023-02-19 |
MWK |
19514968.25 |
|
|
232 |
LCC/CDF/08/22/BOREHOLES/LCSE |
DRILLING OF SIX BOREHOLES IN LILONGWE CITY SOUTH EAST CONSTITUENCY UNDER CDF PROJECT |
completed
|
construction |
Drilling of six boreholes |
Providing safe water to the community. |
2022-11-30 |
2023-01-29 |
MWK |
26600673.00 |
|
|
288 |
MW-DDC316277-CW-RFB |
Construction of Chivala Police Unit (Administration Block) |
implementation
|
construction |
Construction of Administration Block at Chivala Police Unit |
Construction of an Administration Block |
2023-02-19 |
2023-06-18 |
MWK |
84053611.00 |
|
|
290 |
MW-DDC316466-CW-RFB |
Construction of Nkhathwe Bridge |
implementation
|
construction |
Construction of a 10m Concrete Deck Bridge at Nkhathwe Bridge |
Construction of a Bridge |
2023-02-10 |
2023-06-09 |
MWK |
30208771.75 |
|
|
296 |
MW-DDC-316466-CW-RFB |
Construction of Mtiti Bridge |
implementation
|
construction |
Construction of Mtiti Bridge (16m Concrete Deck Bridge) |
Construction of a Bridge |
2023-02-27 |
2023-06-27 |
MWK |
37274069.50 |
|
|
298 |
MW-DDC-316466-CW-RFB |
Completing of Madzo Maternity Wing |
implementation
|
construction |
Completing of Madzo Maternity Wing |
Completing of Madzo Maternity Wing |
2023-02-09 |
2023-05-05 |
MWK |
45781396.25 |
|
|
299 |
MW-DDC316466-CW-RFB |
Construction of Umoyo Staff House |
implementation
|
construction |
Construction of Umoyo Staff House at Madzo Clinic |
Construction of Umoyo Staff House |
2023-02-09 |
2023-05-05 |
MWK |
43352309.00 |
|
|
308 |
NB/DDF/2122/2 |
Makumbo U5 Clinic Staff House |
completed
|
construction |
Construction of Makumbo U5 Clinic Staff House in TA Zilakoma, Tukombo Ward, South Constituency |
To provide accommodation for health workers |
2021-07-01 |
2022-06-30 |
MWK |
27699975.00 |
|
|
311 |
MDC/GESD/NJUYU/2022-23/002 |
Construction of Maternity Wing at Njuyu Health Centre |
implementation
|
construction |
The project involves construction of maternity wing, Placenta pit and Incinerator and provision of basic furniture |
To improve maternal health |
2023-02-13 |
2023-05-14 |
MWK |
130346984.16 |
|
|
313 |
CPDC/01/11/22 |
Construction of Abattoir (Chitipa Boma) |
completion
|
construction |
The project will involve the construction of a structure that has a slaughter area with benches, meat hangers, benches, and drainage lines. |
The purpose of this project is to provide a conducive, hygienic slaughter environment that promotes good general public health. |
2022-11-29 |
2023-03-10 |
MWK |
39550072.00 |
|
|
318 |
MDC/GESD/KANJUCHI/2022-23/003 |
Construction of Kanjuchi police Unit |
implementation
|
construction |
The project involves construction of police unit block ,toilets and provision of basic furniture |
To improve security services, law and order |
2023-02-19 |
2023-05-20 |
MWK |
63035278.09 |
|
|
310 |
MDC/GESD/KAMWE/2022/23/001 |
Construction of staff house at Kamwe Health Centre |
implementation
|
construction |
Construction of a staff house, toilet, electricity and water connection. |
To provide a conducive working environment for health workers. |
2023-02-19 |
2023-05-20 |
MWK |
36182190.21 |
|
|
322 |
NB/DDF/2122/3 |
Nkhwali Clinic |
completed
|
construction |
Construction of Nkhwali Clinic |
To provide health services tp the citizens of nkhatabay |
2021-12-28 |
2022-04-26 |
MWK |
45510896.75 |
|
|
324 |
CPDC/19/01/23 |
Construction of Chitipa Bus Depot (First Phase) |
implementation
|
construction |
The project will include the construction of a fence, gate, and guard room and the renovation of the old market shed into a depot shed |
The project will provide a conducive environment for people to board buses and provides security to passengers and their goods |
2023-01-19 |
2023-05-30 |
MWK |
40000000.00 |
|
|
325 |
NB/DDF/2122/4 |
Mzenga CDSS Boys Hostel |
completed
|
construction |
Construction of a boys hostel at mzenga CDSS, TA Kabunduli |
To provide accomodation for students to enable a conducive learning environment |
2021-12-28 |
2022-06-30 |
MWK |
63415112.25 |
|
|
326 |
CPDC/29/11/22 |
Construction of Kameme EPA Office |
implementation
|
construction |
The project will construct an office block for agricultural extension workers and provision of furniture |
The project aims at improving the provision of agricultural extension services in the Kameme area as the extension workers will have offices within the area. This in turn is anticipated to improve agricultural production and improve household income for the farming family households. |
2022-11-29 |
2023-02-28 |
MWK |
63398306.00 |
|
|
327 |
CPDC/29/11/23 |
Construction of Girl's Hostel at Namatubi CDSS |
implementation
|
construction |
The project will involve the construction of the girls' hostels with 80 beds, with an attached ablution block. |
The project aims at promoting the education of the girl child as it will help to eliminate numerous challenges (sexual harassment, rape, etc) the girl child goes through when they travel long distances. |
2022-11-29 |
2023-03-10 |
MWK |
65686960.00 |
|
|
238 |
MIE/CoTC/NCB/2021 |
construction of training complex at MIE |
implementation
|
construction |
Administration Block, Cafeteria, classroom block, fence and conference centre |
expansion of training facilities |
2022-07-27 |
2023-12-15 |
MWK |
2386380598.98 |
|
|
259 |
50/2020 |
Rehabilitation of offices at MWASIP in lilongwe district |
completion
|
rehabilitation |
Rehabilitation of offices, change of workstations and purchase of furniture and other stationery |
To provide a good working environment for staff at MWASIP |
2021-04-01 |
2021-07-22 |
MWK |
275080202.60 |
|
|
330 |
IPDC/2022/2023/01 REGIONAL 5 GAMES |
Expansion and maintenance of landscape works at civo stadium- Lilongwe |
completion
|
expansion |
Expansion and maintenance |
to improve and provide an attractive ambience of the stadium |
2022-08-15 |
2022-10-19 |
MWK |
59698214.40 |
|
|
306 |
DADC/MLG/CNGCSA/W/2021-2022 |
Completion of social amenities( community ground, hall, library and bus depot) |
completion
|
construction |
construct, hall library and bus depot and its associated works |
to improve the social well being of individuals at Nambuma growth center |
2022-03-04 |
2022-10-21 |
MWK |
618353349.71 |
|
|
304 |
SFS/242/10(B) |
Completion and maintainance of EPI office block at CHSU in Lilongwe |
completion
|
construction |
building, maintenance nd all associated works |
to provide a good working environment for staff at EPI |
2021-06-07 |
2021-12-08 |
MWK |
787948901.72 |
|
|
303 |
31/HSSP,MOH/RFQ/W/021/FY19-20 |
Conversion of boiler room into gas plant room at kamuzu central hospital in lilongwe |
completion
|
replacement |
replacement of boiler equipment with gas plant equipment |
to provide enough room for the gas plant |
2020-05-04 |
2020-06-30 |
MWK |
118586224.29 |
|
|
302 |
031/MOHRFQW025/FY19-20/02COVID 19LOT 1 |
Rehabilitation of Karonga and Mzuzu covid19 isolation centers |
completion
|
rehabilitation |
rehabilitation of rooms and purchase of new beds and beddings |
to provide a good isolation facilities for covid19 patients |
2020-07-30 |
2020-08-30 |
MWK |
114120892.32 |
|
|
291 |
031/MOHRFQ/W24/FY19-20 |
Rehabilitation of Ebola shelter at kameza in blantyre to turn it into covid19 isolation centre |
completion
|
replacement |
Turn Ebola shelter into COVID 19 isolation center |
to have a good isolation center for COVID patients at kameza |
2020-06-08 |
2020-07-17 |
MWK |
85818359.32 |
|
|
289 |
031/MOHRFQW025/FY19-20/02 COVID 19LOT2 |
Rehabilitation of Dedza and Mchinji Covid 19 Isolation Centres |
completion
|
rehabilitation |
rehabilitation of buildings, purchase of beds and beddings |
to provide good and conducive isolation facilities for patients |
2020-07-28 |
2020-08-30 |
MWK |
114120892.32 |
|
|
276 |
MRA/M-WORKS/01/2020/010 |
Completion of domestic taxes annex building- Lilongwe |
completion
|
construction |
building of annex and its associated works |
for proper management of government revenue |
2020-05-18 |
2020-11-29 |
MWK |
23557749.69 |
|
|
266 |
BT/2020/1 |
Construction of civil works on rail line at blantyre strategic fuel reserves |
completion
|
construction |
construction of rail line |
to provide easy access to strategic fuel reserves |
2021-01-05 |
2021-09-05 |
MWK |
431923684.38 |
|
|
265 |
02/2020 |
Completion of office block for agricultural commercialization project area 4- Lilongwe |
completion
|
construction |
construction of office block |
to provide an office for conducting commercial activities for the agricultural sector |
2021-02-22 |
2021-04-30 |
MWK |
333073132.74 |
|
|
264 |
06/2020 |
Construction of security institutional houses for Malawi Police Services at IPYANA and SONGWE in karonga district |
completion
|
construction |
construction of houses and its associated works |
To provide secure institutional houses for the police service |
2020-11-30 |
2021-12-17 |
MWK |
1300795693.88 |
|
|
263 |
16/2022 |
Construction of 2NO, staff houses and associated external works- Monkeybay |
implementation
|
construction |
Construction of houses and associated external works |
to provide a conducive living environment for staff members |
2023-03-27 |
2023-10-11 |
MWK |
311639611.11 |
|
|
333 |
ZCC/RD/RFA/CON/ENG/2021-22/06 |
Consultancy Services |
implementation
|
construction |
Consultancy Services for Design review and Construction Supervision of Selected Roads |
Provision of supervision |
2022-11-16 |
2023-08-13 |
MWK |
130000000.00 |
|
|
334 |
NDC/DDF-ZALEWA/22-23/01 |
CONSTRUCTION OF ZALEWA TRUCK YARD DRAINS AND MASONRY RETAINING WALLS |
implementation
|
construction |
CONSTRUCTION OF ZALEWA TRUCK YARD DRAINS AND MASONRY RETAINING WALLS |
The main aim is to reduce congestion of trucks at Zalewa trading centre , in so doing generating revenue for the the council. |
2022-12-09 |
2023-06-30 |
MWK |
12740775.00 |
|
|
338 |
NDC/CDF-NORTH/22-23/04 |
MAINTENANCE OF CHILIM'BONDO AND MPIMBI SCHOOL BLOCKS |
completed
|
rehabilitation |
maintenance of classroom blocks which were blown away by cyclone winds. |
to reinstate the building to its function of accommodating students. |
2023-01-17 |
2023-03-31 |
MWK |
9814908.05 |
|
|
339 |
BCC/RFA-MAK-EME/5/3/2/2022-23 |
Emergency Civil Works for the Construction of Box Culvert at Makalanga(Chilaweni Bridge) across Nkolokoti Parkway |
implementation
|
construction |
Construction of Box Culvert |
Provide access |
2023-04-19 |
2023-08-31 |
MWK |
962000000.00 |
|
|
340 |
NNDC/CDF-SOUTH/CHIDIDIDRIFT/22/11 |
CONSTRUCTION OF CHIDIDI DRIFT |
completed
|
construction |
CONSTUCTION OF CHIDIDI DRIFT AT T/A MLAULI NENO SOUTH |
EASE TRANSPORT PROBLEMS IN LOCAL AREA |
2022-11-24 |
2023-03-31 |
MWK |
8477557.50 |
|
|
344 |
NDC/CDF-SOUTH-MAGALETACBCC/2022-23/01 |
MAINTENANCE OF MWAIWATHU CBCC KITCHEN |
completed
|
rehabilitation |
MAINTENANCE OF MWAIWATHU CBCC KITCHEN WHICH WAS IN A DELAPIDATED STATE. |
TO KEEP THE STRUCTURE IN GOOD USE FOR LOCAL RESIDENTS. |
2022-11-24 |
2023-03-31 |
MWK |
2950000.00 |
|
|
345 |
NNDC/CDF-SOUTH/POLICECHIFUNGA/22/08 |
CONSTRUCTION WORKS OF CHIFUNGA POLICE UNIT |
implementation
|
construction |
CONSTRUCTION OF CHIFUNGA POLICE UNIT IN SOUTH CONSTITUENCY |
PROVIDE SECURITY TO THE COMMUNITY |
2022-11-24 |
2023-03-31 |
MWK |
44830245.00 |
|
|
357 |
265 |
Construction of Pit Latrine and Rehabilitation of Lisungwi Police Unit |
completed
|
construction |
Construction of pit latrine and rehabilitation of Lisungwi Police Unit |
Enforcement of law and order |
2022-11-24 |
2023-03-31 |
MWK |
7707407.01 |
|
|
358 |
265 |
Construction of Phwadzi Timber Deck Bridge |
completed
|
construction |
Construction of Phwadzi Timber Deck Bridge |
To ease transportation problems |
2022-11-24 |
2023-03-31 |
MWK |
12101550.00 |
|
|
359 |
265 |
Construction of Kalumbe Timber Deck Bridge |
completed
|
construction |
Construction of Kalumbe Timber Deck Bridge |
To ease transport problems in the area |
2022-11-24 |
2023-03-31 |
MWK |
8839962.50 |
|
|
360 |
265 |
Construction of Naminjale Timber Deck Bridge |
completed
|
construction |
Construction of Naminjale Timber Deck Bridge |
To ease transportation problems |
2022-11-24 |
2023-03-31 |
MWK |
6774539.63 |
|
|
361 |
265 |
Construction of Two Double Pit Latrrines at Chikonde Primary School |
implementation
|
construction |
Construction of two double pit latrines |
To aid with sanitation problems the school had encountered |
2023-01-17 |
2023-03-31 |
MWK |
8988469.34 |
|
|
362 |
265 |
Construction of a Low Cost Classroom Block at Mfunda Primary School |
implementation
|
construction |
Construction of a low cost classroom block |
To reduce pupil classroom ratio |
2023-01-17 |
2023-03-31 |
MWK |
16748895.00 |
|
|
301 |
MW-DDC-316459-CW-RFQ |
Construction of Mdika Irish Bridge |
implementation
|
construction |
Construction of Mdika Irish Bridge and Associated Drainage |
Construction of a Bridge |
2023-02-09 |
2023-04-30 |
MWK |
10470400.00 |
|
|
287 |
MW-DDC316277-CW-RFB |
Construction of Chinkhwiri Police Unit (Administration Block) |
implementation
|
construction |
Construction of administration Block at Chinkhwiri Police Unit |
Construction of administration Block |
2023-02-19 |
2023-05-18 |
MWK |
71772836.72 |
|
|
364 |
LWB-IFP |
LILONGWE WATER BOARD INTERNALLY FUNDED PROJECTS |
implementation
|
expansion |
The Project involves expansion and rehabilitation of the water supply infrastructure. Further, the project aims at enhancing business for LWB. |
To increase access of potable water in the LWB's supply area. |
2020-07-01 |
2025-07-31 |
MWK |
60000000000.00 |
|
|
293 |
LWB-RfRCI |
RELOCATION OF PIPES FOR ROAD CAPACITY IMPROVEMENT |
implementation
|
replacement |
The project aims at relocating existing pipelines to pave way for the improvement of road capacities in the city of Lilongwe. |
The objective is to allow for a continuous water supply by avoiding damage to the water pipes should they remain under the driveways. |
2020-07-01 |
2025-06-30 |
MWK |
7000000000.00 |
|
|
366 |
EIB no. 2013-0566 |
LILONGWE WATER RESOURCE EFFICIENCY PROGRAMME |
implementation
|
rehabilitation |
Medium-term investment programme to optimise available water resources, bridging the gap in water demand in Malawi's fast-growing capital city. The project's main components consist of upgrading a dam that is Lilongwe's primary water source, extending water-treatment works, reducing leakages and improving network management. |
The objective of the project is to ensure adequate water availability for the population of Lilongwe |
2015-06-12 |
2022-10-31 |
EUR |
28800000.00 |
|
|
367 |
EIB-MW-LDRP-01 |
LILONGWE DROUGHT RESILIENCE PROGRAMME |
implementation
|
expansion |
The project seeks to expand the Water Treatment Facilities by providing an additional 50 000m3/day. |
At the end of the project, it is expected that there will be increased access to potable water as the additional water production capacity shall meet the demand of Lilongwe City and Surrounding Areas. |
2020-12-23 |
2024-03-31 |
EUR |
15000000.00 |
|
|
368 |
MW-RA-215215-CW-RFB |
CONSTRUCTION/REHABILITATION OF TRAUMA UNIT Dedza District Hospital |
implementation
|
rehabilitation |
The Government of Malawi through the Roads Authority is implementing Trauma Units in 4 No. Health Facilities and the Rehabilitation of the Referral Hospital Trauma Unit in Blantyre along M1 Road between Blantyre and Lilongwe. This is to provide speedy medical attention/help to those involved in road accidents along the M1 road. |
The Trauma Units as designed shall be a fully established facility for the treatment of patients suffering from major traumatic injuries. The facilities will be an expansion programme at four District hospitals of Ntcheu, Dedza, Balaka and Lisungwi/QUECH.
• The Trauma Units will assist in the treatment of emergency road accident victims on the M1 road.
• The people around the area of the Trauma project will also benefit by being employed in various work activities by the Contractor. |
2022-05-04 |
2022-12-03 |
MWK |
424812686.55 |
|
|
370 |
MW-RA-235872-CW-RFB |
CONSTRUCTION/REHABILITATION OF TRAUMA UNITS Ntcheu District Hospital |
implementation
|
rehabilitation |
The Government of Malawi through the Roads Authority is implementing Trauma Units in 4 No. Health Facilities and the Rehabilitation of the Referral Hospital Trauma Unit in Blantyre along M1 Road between Blantyre and Lilongwe. This is to provide speedy medical attention/help to those involved in road accidents along the M1 road. |
The Trauma Units as designed shall be a fully established facility for the treatment of patients suffering from major traumatic injuries. The facilities will be an expansion programme at four District hospitals of Ntcheu, Dedza, Balaka and Lisungwi/QUECH.
• The Trauma Units will assist in the treatment of emergency road accident victims on the M1 road.
• The people around the area of the Trauma project will also benefit by being employed in various work activities by the Contractor. |
2022-05-04 |
2022-12-05 |
MWK |
378121472.44 |
|
|
372 |
MW-RA-215217-CW-RFB |
CONSTRUCTION/REHABILITATION OF TRAUMA UNITS BALAKA DISTRICT HOSPITALS |
implementation
|
rehabilitation |
The Government of Malawi through the Roads Authority is implementing Trauma Units in 4 No. Health Facilities and the Rehabilitation of the Referral Hospital Trauma Unit in Blantyre along M1 Road between Blantyre and Lilongwe. This is to provide speedy medical attention/help to those involved in road accidents along the M1 road. |
The Trauma Units as designed shall be a fully established facility for the treatment of patients suffering from major traumatic injuries. The facilities will be an expansion programme at four District hospitals of Ntcheu, Dedza, Balaka and Lisungwi/QUECH.
• The Trauma Units will assist in the treatment of emergency road accident victims on the M1 road.
• The people around the area of the Trauma project will also benefit by being employed in various work activities by the Contractor. |
2022-05-04 |
2022-12-05 |
MWK |
404975571.44 |
|
|
374 |
Contract No:MW-RA-235873-CW-RFB |
CONSTRUCTION/REHABILITATION OF TRAUMA UNITS LISUNGWI COMMUNITY HOSPITAL/QUEEN ELIZABETH CENTRAL HOSPITAL |
implementation
|
rehabilitation |
The Government of Malawi through the Roads Authority is implementing Trauma Units in 4 No. Health Facilities and the Rehabilitation of the Referral Hospital Trauma Unit in Blantyre along M1 Road between Blantyre and Lilongwe. This is to provide speedy medical attention/help to those involved in road accidents along the M1 road. |
The Trauma Units as designed shall be a fully established facility for the treatment of patients suffering from major traumatic injuries. The facilities will be an expansion programme at four District hospitals of Ntcheu, Dedza, Balaka and Lisungwi/QUECH.
• The Trauma Units will assist in the treatment of emergency road accident victims on the M1 road.
• The people around the area of the Trauma project will also benefit by being employed in various work activities by the Contractor. |
2022-05-03 |
2022-12-05 |
MWK |
464887002.00 |
|
|
373 |
MW-MCDC-318597-CW-RFB [LOT NO. 2] |
Kadzala CDSS Girls Hostels |
implementation
|
construction |
Construction of girls hostel at Kanilika Village. TA Mavwere |
To provide accommodation for girls at the school |
2023-03-18 |
2023-07-16 |
MWK |
179836983.60 |
|
|
376 |
KK DC/DDF/2022-2023-04 |
Rehabilitation of Dwambazi Market Shed |
completed
|
rehabilitation |
Construction of vending benches, storm water drains and painting |
To boost local revenue |
2022-12-15 |
2023-03-15 |
MWK |
3942300.00 |
|
|
377 |
MW-MCDC-318596-CW-RFB [LOT NO.2] |
Border Road and Drainage |
implementation
|
construction |
Construction of road and drainage at border |
To improve road access and drainage system at border |
2023-02-23 |
2023-05-24 |
MWK |
18241297.50 |
|
|
378 |
MW-MCDC-318594-CW-RFB [LOT NO.3[C]] |
Tembwe Dip Tank Rehabilitation |
implementation
|
rehabilitation |
Rehabilitation of Tembwe Dip tank |
To control for livestock pest and diseases |
2023-02-10 |
2023-06-10 |
MWK |
8164340.00 |
|
|
382 |
procurement number |
Kamphemba primary school block |
implementation
|
construction |
construction of primary school block, equiped with learners desks, teachers chairs |
to improve access to education as well as increased enrolment to primary schools in dedza |
2023-02-13 |
2023-05-14 |
MWK |
53077518.74 |
|
|
385 |
001/GESD/53087/10/21/702 |
Construction of Chamama Market |
implementation
|
construction |
construction of open market shed, market kiosks , and a closed market shed. |
To provide shelter for vendors and enhance district council revenue generation. |
2021-12-01 |
2022-05-01 |
MWK |
95000000.00 |
|
|
387 |
procurement number |
Kapanda Safe water Project |
preparation
|
construction |
construction of a solar powered reticulated water system, |
the project will provide the surrounding communities with piped and safe water |
2023-02-13 |
2023-05-14 |
MWK |
35714119.56 |
|
|
389 |
KK DC/DDF/2022-2023-01 |
Dwangwa dumping site |
completed
|
construction |
Construction of Dwangwa dumping site |
To ease rubbish and environmental hygiene |
2022-12-15 |
2023-03-15 |
MWK |
13861409.97 |
|
|
393 |
KK DC/DDF/2022-2023-01 |
Boma Dumping site |
implementation
|
construction |
Construction of Boma market dumping site |
To ease trashes and environmental issues at the market |
2022-12-15 |
2023-03-15 |
MWK |
13902071.00 |
|
|
396 |
procurement number |
Tembetembe safe water project |
implementation
|
construction |
The construction of a solar powered reticulated safe water system . |
The project will provide safe water to households in the surrounding areas |
2023-02-14 |
2023-05-15 |
MWK |
37374078.06 |
|
|
399 |
KK DC/DDF/2022-2023-04 |
Chugumula Stadium |
implementation
|
construction |
Construction of water drains and wiring of dressing rooms |
To collect more revenue and promoting sporting activities |
2022-12-15 |
2023-03-15 |
MWK |
17173600.00 |
|
|
369 |
KUMC/RMDB/7/2022-2023/11 |
REHABILITATION OF MAIN DAM BRIDGE AT CHITHIBA WARD |
implementation
|
rehabilitation |
The project involves replacement of flat sheets as a deck |
To improve accessibility between Dam area and Ntambalala |
2022-07-06 |
2024-03-31 |
MWK |
8000000.00 |
|
|
401 |
KK DC/DDF/2022-2023-05 |
Bango to Mapala road reshaping |
implementation
|
rehabilitation |
Reshaping, spot graveling and drainage works |
To ease transportation challenges |
2022-12-15 |
2023-03-15 |
MWK |
17422696.56 |
|
|
402 |
procurement number |
Kumitengo safe water project |
implementation
|
construction |
construction of a solar powered reticulated safe water system, connected to taps in the surrounding communities |
the project will provide safe water to the surrounding communities in the area |
2023-02-13 |
2023-05-14 |
MWK |
36951078.00 |
|
|
394 |
KUMC/CMSK/07/2022-2023/10 |
CONSTRUCTION OF MARKET SHED AT KASALIKA MARKET |
implementation
|
construction |
The project involves brickwork, plastering and roofing |
The purpose of the project is to house all market vendors under one roof and to prevent them from direct sunshine and rainfall |
2022-07-06 |
2024-03-31 |
MWK |
17000000.00 |
|
|
404 |
001/4109/12/22/800 |
construction of two classroom blocks with adjoined office for katchitsa primary school |
implementation
|
construction |
construction of two classroom block, adjoined office and a toilet at Katchisa primary school |
To provide conducive learning and teaching environment for school going children and teachers |
2023-01-25 |
2023-05-31 |
MWK |
70000000.00 |
|
|
405 |
MW-MCDC-318594-CW-RFB [LOT NO.2] |
Mbingwa Livestock market |
implementation
|
construction |
Construction of Mbingwa livestock market |
To provide platform for selling livestock |
2023-02-08 |
2023-06-08 |
MWK |
10924350.40 |
|
|
406 |
KK DC/DDF/2022-2023-02 |
Lozi Market Shed |
implementation
|
construction |
Construction of market shed and toilets |
To boost local revenue |
2022-12-15 |
2023-03-15 |
MWK |
26987257.83 |
|
|
407 |
procurement number |
Mphanthi Primary school block |
implementation
|
construction |
construction of a primary school block , furnished with classroom desks and furnished staff room |
The project will improve education stands in the district as well as increased enrolment. |
2023-02-14 |
2023-05-15 |
MWK |
59951427.68 |
|
|
409 |
MW-KDC-311884-CW-RFQ |
construction of Kasikizi Bridge |
implementation
|
construction |
Construction of Kasikizi bridge |
construction of Kasikizi bridge to provide connectivity between Mtunthama communities and Chilowamatambe communities |
2022-12-01 |
2023-05-31 |
MWK |
54000000.00 |
|
|
410 |
MoE_2023_001 |
Construction of 3 TTCs |
implementation
|
construction |
The Project involves the construction of Three Teacher Training Colleges (TTCs), one in each of the following districts: Mchinji, Chikwawa, and Rumphi; and the project has two lots with a total project cost of MK42 billion with BADEA, Saudi Fund for Development, and OPEC Fund for International Development providing 70% of the resources and Malawi Government providing counterpart funding of 30%. |
To increase enrolment of primary school student teachers and improve equitable access to quality education in primary schools |
2018-01-01 |
2024-03-31 |
MWK |
42000000000.00 |
|
|
408 |
RA/DEV/RU/2021-22/01 |
Upgrading of 20 Kilometres of Rumphi - Nyika - Road (Lot 2) (Chikwawa-Bembe section) |
implementation
|
construction |
Pursuant to the Malawi Growth and Development Strategy (MGDSIII), 2018 and the Transport Master Plan, 2018 that are both recent policy documents that articulates issues related to both economic growth and development in the Transport Sector, the Government of the Republic of Malawi is upgrading the 20Km (Chikwawa Bembe Section) part of Rumphi Nyika road. |
The Rumphi Nyika road was initially constructed to an earth road, reshaped over several years by Graders to form a well drained all weather road with several ring culverts along the entire length. The scope of work includes upgrading of the existing earth road to Class I bitumen standard i.e. 6.8m carriage width and 1.5m sealed shoulders on both sides. Both the Base and Sub-base layers will be constructed from locally sourced natural gravel materials of 150mm thick each. Surfacing is 50mm thick Hot Mix Asphalt. The project will have many benefits to the people along the road and to the country as a whole. Some of the benefits will include; Reduced road maintenance costs, vehicle operating and passenger travel costs, ease problems of transporting farm inputs and produce to and from various markets, reduce the occurrence of dust and mud along the project area, employment creation, business boosting and boost tourism. |
2022-08-24 |
2023-08-23 |
MWK |
7694092436.93 |
|
|
411 |
MW-MCDC-318596-CW-RFB [LOT NO.6] |
Chithumba Bridge |
implementation
|
construction |
Construction of chithumba bridge |
To ease road access |
2023-04-08 |
2023-07-07 |
MWK |
29055192.75 |
|
|
413 |
procurement number |
Namakasu police Unit |
implementation
|
construction |
Construction of a police unit with a double VIP latrine |
The project will improve the level of security in the area as well as increasing the presence of police officers to assist reducing crime. |
2023-02-14 |
2023-05-14 |
MWK |
79516094.42 |
|
|
414 |
MW-KDC-311883-CW-RFQ |
construction of Tchesa EPA office |
implementation
|
construction |
construction of Tchesa EPA office |
To enhance agricultural extension services |
2022-12-01 |
2023-05-31 |
MWK |
55000000.00 |
|
|
415 |
MW/SADC/DDF/60601 |
Thundu Teachers House |
completed
|
construction |
Construction of 1 teachers house and 1 VIP Toilet |
The project is trying to address issues of High Illiteracy rate in the locality. |
2021-12-21 |
2022-04-03 |
MWK |
23846827.80 |
|
|
416 |
MW-MCDC-318596-CW-RFB [LOT NO.5] |
Chizeze/Kalulu Bridge |
implementation
|
construction |
Construction of Chizeze Kalulu Bridge |
To ease road access and transportation |
2023-04-09 |
2023-07-08 |
MWK |
11423650.00 |
|
|
400 |
MW/SADC/DDF/60601 |
Kamphinda Police unit |
implementation
|
construction |
Construction of Office Block, 1 staff house and 1 double VIP pit latrine |
The project is trying to address issues of high crime rate in the locality. |
2021-12-12 |
2022-03-31 |
MWK |
52498096.79 |
|
|
418 |
procurement number |
Chinkombero Health centre |
implementation
|
construction |
Construction of 2 staff houses, 2 VIP latrines completion of Maternity wing, rehabilitation of the dispensary |
The project will improve health service delivery in area through provision of maternity service which are not available in the area |
2023-02-13 |
2023-05-14 |
MWK |
181825019.70 |
|
|
419 |
MW-KKDC-310960-CW-RFB |
Benga Market Shed |
implementation
|
construction |
Construction of Market Shed and Toilets |
To boost local revenue |
2023-02-21 |
2023-05-22 |
MWK |
39585393.00 |
|
|
391 |
BLK-GESD-2-7 |
Construction of Nkaya Health Post |
implementation
|
construction |
Construction of Nkaya Health Post with 3 Toilets and Furniture |
Improve access to health services at community level |
2022-04-01 |
2023-03-30 |
MWK |
92725850.56 |
|
|
412 |
MW-KDC-311880-CW-RFQ |
construction of Kapelula Police Unit |
implementation
|
construction |
construction of Police unit office and pit latrine; one staff house with pit latrine |
To enhance security in Kasungu east constituency |
2022-12-01 |
2023-05-31 |
MWK |
90000000.00 |
|
|
381 |
BLK-GESD-2-9 |
Mulunguzi Health Post |
implementation
|
construction |
Construction and rehabilitation of health centres |
Improve access to health services at community level |
2022-04-01 |
2023-03-30 |
MWK |
92913274.25 |
|
|
422 |
MW-MCDC-318594-CW-RFB [LOT NO. 10] |
Double VIP toilet at kamwendo |
implementation
|
construction |
Construction of Double VIP toilet |
To promote sanitation at the market |
2023-03-18 |
2023-06-16 |
MWK |
3963125.00 |
|
|
286 |
MW-DDC-316277-CW-RFB |
Construction of Nalunga Police Senior Staff House |
implementation
|
construction |
Construction of Staff House at Nalunga Police Unit |
Construction of a House |
2023-02-21 |
2023-05-20 |
MWK |
71585854.44 |
|
|
423 |
MW-KKDC-310959-CW-RFB |
Mwansambo Maternity Ward |
implementation
|
construction |
Construction of new maternity ward |
To improve health services and reduce maternal death |
2023-02-21 |
2023-06-21 |
MWK |
112170755.22 |
|
|
424 |
MW-KDC-311880-CW-RFQ |
construction Chisinga police staff houses |
implementation
|
construction |
construction of two staff houses at Chisinga police unit |
to enhance security in Kasungu north west constituency |
2022-12-01 |
2023-05-31 |
MWK |
75600000.00 |
|
|
425 |
procurement number |
Lombodzi primary school block |
implementation
|
construction |
Construction of 2 classroom blocks and a staff room equiped with teachers chairs and desks for the learners |
the project will improve the education status in the area as well as increasing primary school enrolment |
2023-02-13 |
2023-05-14 |
MWK |
46330959.55 |
|
|
426 |
MW-KKDC-310961-CW-RFB |
Nkhunga Wards |
implementation
|
construction |
Construction of New Male and Female wads |
To improve health services |
2023-02-21 |
2023-06-21 |
MWK |
268132249.29 |
|
|
427 |
MW-MCDC-340785-CW-RFB |
Boma Community Ground |
implementation
|
construction |
Construction of stadium |
For income generation and recreation Centre |
2023-03-11 |
2023-07-09 |
MWK |
65780039.00 |
|
|
428 |
procurement number |
Katongole primary school block |
implementation
|
construction |
Construction of a 2 classrooms, plus staff room, furnished with learners desks as well as teachers chairs |
the school block with improve the education delivery in the area as well as increase enrolment of primary school learners |
2023-02-13 |
2023-05-14 |
MWK |
58885455.74 |
|
|
430 |
MW-DDC-316466-CW-RFB |
Completition of Chibanzi Health post |
completion
|
construction |
Construction of Health Post |
Provision of Health Services |
2023-02-06 |
2023-05-17 |
MWK |
39396474.61 |
|
|
432 |
procurement number |
Kamtambo Teacher House |
implementation
|
construction |
The project will construct 1 teacher house with 2 VIP latrines |
the staff houses will health in the education delivery through improving the welfare of the teachers. |
2023-02-13 |
2023-05-14 |
MWK |
59219001.25 |
|
|
435 |
MW-DDC316466-CW-RFB |
Completion of Kawangi Girls Hostel |
completion
|
construction |
Completion of Kawangi Girls Hostel in TA chiwere |
Provision of Education Services |
2023-02-06 |
2023-05-31 |
MWK |
24174680.55 |
|
|
437 |
procurement number |
Madzumbi Health unit |
implementation
|
construction |
construction of a health unit with 2 VIP latrines |
The project will improve the health service delivery in the area through improved staff welfare at the health facility |
2023-02-13 |
2023-05-14 |
MWK |
89294486.58 |
|
|
436 |
RA/DEV/CP/2022-23/01 |
UPGRADING OF CHITIPA – ILOMBA (T301/D002) ROAD IN CHITIPA |
implementation
|
construction |
The project road is approximately 31km of road section from Chitipa to Ilomba (Tanzania Border). The project will be executed in three (3) Lots.
• The first lot (Lot 1) covers a distance of 10km from Chitipa, km 0+000 to km 10+000;
• The second lot (Lot 2) covers a distance of 10km from km 10+000 to km 20+000; and
• The third lot (Lot 3) covers a distance of 11km from km 20+000 to km 31+000. |
The scope of works involves upgrading works from earth to bitumen standard with improvements to horizontal and vertical alignments. The works will also include construction of bridges, box culverts and installation of numerous pipe culverts.
Reduction in Vehicle Operating Costs
Upgrading of the road will result in reduction of vehicle operating costs which constitutes the major benefit attributable to such new projects.
Reduction in Travel Time and Cost
The project will help reduce travel time from the agricultural areas.
Passengers will now be paying less and spending less time on travel. Availability of buses and minibuses will greatly improve.
Agriculture
The area where the road passes is an agricultural area for mainly Irish potatoes and maize. The upgrading of the road will ease problems of transporting farm inputs and produce to and from various markets.
Environmental and Health
The upgrading will reduce the occurrence of dust and mud along the project area and thereby improving sanitation which means reduction in the spread of diseases which are airborne or waterborne. This will reduce the cost of medicines which would have been required to treat the people affected. The upgrading of the road will allow the communities good access to health facilities in town especially for referral cases. |
2022-12-08 |
2024-06-08 |
MWK |
34482770777.05 |
|
|
441 |
MW-DDC316277-CW-RFB |
Construction of Madisi Rest House Fence |
completion
|
construction |
Construction of Madisi Rest House Fence |
Provision of Economy |
2023-02-06 |
2023-05-17 |
MWK |
26999400.60 |
|
|
443 |
MW-MCDC-318597-CW-RFB [LOT NO. 20] |
Boma Taxi Ranking Rehabilitation |
implementation
|
rehabilitation |
Rehabilitation of Boma Taxi Rank |
To improve drainage system and condition of the taxi rank |
2023-03-03 |
2023-06-01 |
MWK |
5996016.17 |
|
|
444 |
MW/SADC/GESD/60601 |
Electrification of Mnema Health Centre |
completed
|
expansion |
Connection of electricity to the maternity block |
The project is trying to address issues of maternal deaths hence reduce mortality rate in the locality. |
2022-09-14 |
2022-12-15 |
MWK |
1449996.27 |
|
|
447 |
MW/SADC/DDF/60601 |
Operationalise a paying ward at Salima District Hospital |
implementation
|
rehabilitation |
Refurbishment, carpentry, plumbing, painting and electrical works |
To address the issue of low revenue collection and improve of social amenity |
2022-09-14 |
2022-12-20 |
MWK |
20000000.00 |
|
|
379 |
NS/IPDAC/GESD/WKS/2021-22/01-LOT 7 |
Rehabilitation of Chandawe Health Post- Maternity Wing |
completed
|
rehabilitation |
The project sought to rehabilitate the maternity wing at Chandawe Health Post |
Reduce Mother and Infant mortality rate,
through provision of conducive environment for
child delivery. |
2021-12-29 |
2022-03-31 |
MWK |
23000000.00 |
|
|
380 |
NS/IPDAC/GESD/WKS/2021-22/01 LOT 2 |
Staff House at Mzandu Health Centre |
completion
|
construction |
Construction of One Staff House at Mzandu Health Centre |
To increase number of staff accommodation |
2021-12-29 |
2022-03-31 |
MWK |
29110800.00 |
|
|
386 |
NS/IPDAC/GESD/WKS/2021-22/01-LOT 6 |
Rehabilitation of Maternity wing at Sambakusi Health Center. |
completed
|
construction |
To rehabilitate the maternity wing at Sambakusi Health post. |
To reduce Mother and Infant mortality rate,
through provision of conducive environment for
child delivery |
2021-12-29 |
2022-03-31 |
MWK |
17000000.00 |
|
|
398 |
NS/IPDAC/GESD/WKS/2021-22/01 |
Solar water System at Kandodo Village |
completed
|
construction |
Drilling & Installation of Mechanized Solar Water System |
To improve access to water which is essential for hygiene and sanitation. |
2021-12-29 |
2022-03-31 |
MWK |
18000000.00 |
|
|
292 |
NS/IPDAC/NCB/22/GESD/WK/02 |
Construction of Chinkhande Maternity wing |
implementation
|
construction |
Construction of Maternity Wing and associated external works |
Support towards health delivery |
2023-02-20 |
2023-06-30 |
MWK |
237972400.00 |
|
|
392 |
NS/IPDAC/22/RFQ/WKS/01 |
Construction of kansonga police staff house |
completed
|
construction |
Construction of 1t staff house for Kansonga Police Unit |
To increase police staff accommodation, that will allow the increased presence of police staff in the community |
2022-03-01 |
2022-04-30 |
MWK |
29000000.00 |
|
|
448 |
MoE_2023_002 |
Construction of Girls Hostel Project - Phase III |
implementation
|
construction |
Construction of twelve (12) Girls’ Hostels in selected Community Day Secondary schools |
To increase access and equity to secondary education for all eligible students, with particular focus on girls, vulnerable groups and other categories of students that find access difficult, including those travelling longer distances in rural areas. |
2018-07-01 |
2019-06-30 |
MWK |
12500000000.00 |
|
|
449 |
MoE_2023_003 |
Construction of Primary Schools and Rehabilitation of Education facilities |
implementation
|
construction |
Construction of 14 Urban Primary Schools in Blantyre, Lilongwe, Mzuzu and Zomba |
To decongest some of the highly populated urban primary schools |
2018-07-01 |
2019-06-30 |
MWK |
10000000000.00 |
|
|
450 |
MoE_2023_004 |
Construction of Laboratory / Library blocks in 29 Selected Community Day Secondary Schools. |
implementation
|
construction |
Construction of Laboratory and Library blocks |
To increase access and equity to secondary education for all eligible students, with particular focus on girls, vulnerable groups and other categories of students that find access difficult, including those travelling longer distances in rural areas. |
2017-04-01 |
2017-10-01 |
MWK |
5000000000.00 |
|
|
451 |
LDC/GESD/2022-2023/CDB/01GLOT6 |
CONSTRUCTION OF KAPANGALIKA CONCRETE DECK AT NAMBUMA RIVER |
implementation
|
construction |
CONSTRUCTION OF KAPANGALIKA CONCRETE DECK AT NAMBUMA RIVER |
TO IMPROVE QUALITY OF TRANSPORTATION OVER NAMBUMA RIVER |
2023-01-13 |
2023-04-13 |
MWK |
45000000.00 |
|
|
452 |
MoE_2023_005 |
EQUITY WITH QUALITY AND LEARNING AT SECONDARY (EQUALS) PROJECT |
implementation
|
construction |
The EQUALS Project is a Ministry of Education intervention which seeks to improve the quality of mathematics and science instruction in CDSSs and increase access to secondary education in remote areas. The Project emanates from a background of acute secondary education subsector’s challenges such as: persistently low learner achievement levels in Mathematics and Science subjects; inadequate enabling strategic policy reform agenda; low primary to secondary learner transition rate; inadequate and underqualified teachers; inadequate purposely built and resourced science learning space; unavailability or inadequate quantities of learner core textbooks, Teachers’ Guides, supplementary reading materials; and disparities in resource allocation.
The EQUALS Project is funded by the World Bank through an initial $90million credit facility and later an Additional Financing (AF) through a Grant of $5.0million for mitigating the impact the COVID-19 pandemic. The total financing is therefore $95.0 million with a life span of six years running from October, 2019 to December, 2025. |
The EQUALs project has a primary objective of improving the quality of mathematics and science instruction in CDSS and increase access to secondary education in selected remote areas. |
2019-10-01 |
2025-12-31 |
USD |
95000000.00 |
|
|
456 |
RA/MAI/SR/2022-2023 |
The Road and Bridge Maintenance Programme for the 2022/23 South |
implementation
|
rehabilitation |
The Road and Bridge Maintenance Programme for the 2022/23 Financial Year works consist of Sectional Periodic Maintenance, Rehabilitation, Retainer Pothole Patching, Emergency and Urgent works, Routine Term Maintenance; Grading and Reshaping of Trunk, Urban and District Roads and Associated Drainage Works |
Sectional Periodic Road Maintenance |
2022-12-01 |
2023-10-01 |
MWK |
3966375520.85 |
|
|
457 |
MoE_2023_006 |
SKILLS FOR VIBRANT ECONOMY (SAVE) PROJECT |
preparation
|
construction |
The Government of Malawi with support from World Bank is implementing a five year Skills for Vibrant Economy (SAVE) Project through the Ministry of education in collaboration with the Ministry of Labour, The total cost of the project is $100 million. The overall project objective is to increase equitable access to market relevant skills in priority areas of the economy, especially for the females and vulnerable youths in the targeted institutions.
The SAVE project became effective on 14th October 2021 and is expected to close on 30 June 2026. |
The purpose of the project is to increase equitable access to market relevant skills in priority areas of the economy, especially for the females and vulnerable youths in the targeted institutions. |
2021-10-14 |
2026-06-30 |
USD |
100000000.00 |
|
|
459 |
MoE_2023_007 |
SECONDARY EDUCATION EXPANSION FOR DEVELOPMENT (SEED) PROJECT |
implementation
|
construction |
The Ministry through the Secondary Education Expansion for Development (SEED) Project is constructing 250 secondary schools across the country. The overall Project objective is to increase access to secondary education through expanding schools in urban areas and establishing new schools in rural areas. The total Project cost is USD90 million and is funded by the Government of the United States of America. |
The purpose of the project is to increase access to secondary education through expanding schools in urban areas and establishing new schools in rural areas |
2018-06-01 |
2023-06-30 |
USD |
90000000.00 |
|
|
460 |
MoE_2023_008 |
SECONDARY EDUCATION IN MALAWI (ISEM II) PROJECT |
preparation
|
construction |
ISEM II Project aims at upgrading and expanding secondary school infrastructure, and expanding technical vocational education facilities in secondary schools, including improved WASH facilities and climate resilient infrastructure. The upgrading and expansion of secondary schools, focuses on infrastructure works for selected CDSSs in the original six (6) ISEM I demonstration districts and six (6) additional districts. The Project will run from 2021 to 2025. |
aims at upgrading and expanding secondary school infrastructure, and expanding technical vocational education facilities in secondary schools, including improved WASH facilities and climate resilient infrastructure |
2021-07-01 |
2025-12-31 |
EUR |
55000000.00 |
|
|
463 |
MoE_2023_010 |
MALAWI EDUCATION REFORM PROGRAM (MERP) |
preparation
|
construction |
This Programme is co-financed by the Government, World Bank and Global Education Partners (GPE). The main objective of the programme is to improve learning environments for students in lower primary in public schools. The duration of the programme is 4 years, which will run from December 2021 to December 2025. The programme consists of five components namely: Expanding and reforming primary school improvement grants; Improving learning environments in lower primary to support learning recovery after COVID-19; supporting girls‟ learning; School leadership; and Project coordination and capacity building. |
The main objective of the programme is to improve learning environments for students in lower primary in public schools |
2021-12-01 |
2025-12-01 |
USD |
210500000.00 |
|
|
462 |
MoE_2023_009 |
INKOSI YA MAKHOSI M'MBELWA UNIVERSITY |
preparation
|
construction |
The project involves construction of a new University that shall have four schools and a high-tech Livestock Industrial Centre as follows: School of Basic Sciences; School of Animal Sciences with an Animal Farm; School of Veterinary Medicine with a Veterinary Clinic; School of Human Health Sciences; and a High-tech Livestock Industrial Centre with 4 hubs. |
To increase enrolment |
2014-07-01 |
2025-10-15 |
USD |
535000000.00 |
|
|
466 |
KUMC/RDB/2022-2023/ |
RENOVATION OF MAIN BUS DEPOT |
implementation
|
replacement |
The project involves laying concrete in the bus depot |
The purpose of the project is to improve the overall outlook of the depot and the manoeuvrability of vehicles |
2022-07-06 |
2024-03-31 |
MWK |
24500000.00 |
|
|
390 |
06/2008 |
Infrastructure Rehabiliotation and Expansion at Malawi College of Health Sciences |
implementation
|
construction |
Construction of one Auditorium, two hostels, two classrooms, one Library and administration block |
To increase teaching and learning space. To increase accommodation space, Increase office space and increase library space |
2009-06-29 |
2013-03-29 |
MWK |
624271476.65 |
|
|
442 |
091/NUDC/GESD/WORKS/NAMITENGO SCHOOL BLOCK/21/22FY/05 |
CONSTRUCTION OF NAMITENGO SCHOOL BLOCK |
implementation
|
construction |
The project will involve construction of a primary school block. It will involve a complete double classroom block and furniture. |
The project aims at addressing very high enrolment rates. |
2022-01-10 |
2022-04-10 |
MWK |
23105985.00 |
|
|
434 |
091/NUDC/GESD/WORKS/MANJAWIRA HEALTH STAFF HOUSE/21/22FY/07 |
CONSTRUCTION OF MANJAWIRA HEALTH STAFF HOUSE |
implementation
|
construction |
The project will involve construction of the complete house, sanitary fittings, soil. Waste & vent services, cold water services and electrical installation. |
The project will provide accommodation near the health facility for quick health service delivery to the patients. |
2022-01-10 |
2022-04-10 |
MWK |
39193241.00 |
|
|
439 |
001/NUDC/GESD/WORKS/CONSTRUCTION OF SCHOOL BLOCK/BWANJE NORTH |
CONSTRUCTION OF NANYANGU SCHOOL BLOCK |
implementation
|
construction |
The project will involve construction of a primary school block. It will involve a complete double classroom block and furniture. |
The project aims at addressing very high enrollment rates. |
2023-01-10 |
2023-04-10 |
MWK |
30428485.50 |
|
|
471 |
KUMC/RR/7/2022-2023/12 |
ROAD RESHAPING FROM MIKAYA'S RESIDENCE TO JEHOVAH'S WITNESS CHURCH |
completion
|
construction |
The project involved forming a road camber and drainage systems using labour intensive |
To improve accessibility within the ward |
2022-07-06 |
2024-03-31 |
MWK |
1000000.00 |
|
|
477 |
KUMC/CFPB/9/2022-2023/17 |
CONSTRUCTION OF FOOTPATH BRIDGE AT KAVUNGUTI WARD |
implementation
|
construction |
The project involves excavations ,concrete works,masonry works,steel work |
To improve accessibility between Mtondo area and Kavunguti Area |
2022-07-06 |
2024-03-31 |
MWK |
16500000.00 |
|
|
383 |
091/NUDC/GESD/WORKS/MPHIKA SCHOOL BLOCK/21/22FY/04 |
CONSTRUCTION OF MPHIKA SCHOOL BLOCK |
implementation
|
construction |
The project will involve construction of a primary school block. It will involve a complete double classroom block and furniture. |
The project aims at addressing very high enrolment rates. |
2023-01-10 |
2022-03-30 |
MWK |
26680120.00 |
|
|
478 |
RA/MA/CR/2022-2023 |
The Road and Bridge Maintenance Programme for the 2022/23 CENTRAL REGION |
implementation
|
rehabilitation |
The Road and Bridge Maintenance Programme for the 2022/23 Financial Year works consist of Sectional Periodic Maintenance, Rehabilitation, Retainer Pothole Patching, Emergency and Urgent works, Routine Term Maintenance; Grading and Reshaping of Trunk, Urban and District Roads and Associated Drainage Works |
Sectional Periodic Road Maintenance |
2022-12-01 |
2023-10-02 |
MWK |
3194341003.35 |
|
|
481 |
70263/19850 |
Construction of Mponela Community Hospital |
implementation
|
construction |
To Construct a community hospital with the following structures an administration block, an outpatient Department, Maternity block, X- Ray block, Paediatrics, Nutrition and rehabilitation unit, Kitchen and Laundry, Laboratory, Maternal and child health, Mortuary, Ten professional houses, Thirty-five standard houses |
To improve the provision of Health Services at Mponela Trading Centre which has a growing population that can not be supported by the existing Mponela Health Centre |
2018-07-01 |
2023-12-30 |
MWK |
7593622080.13 |
|
|
482 |
70263/15700 |
Construction of Domasi Community Hospital |
implementation
|
construction |
The Project involves the Construction of a community Hospital at Domasi in Zomba with the following blocks an administration block, an Outpatient Department, Maternity block, X- Ray block, Paediatrics, Nutrition and rehabilitation unit, Kitchen and Laundry, Laboratory, Maternal and child health, Mortuary, Ten professional houses, Thirty-five standard houses and External works like incinerators |
To improve the provision of Health Services at Domasi which has a growing population that can not be supported by the existing Health Centre. Domasi Community Hospital will also support and help decongest Zomba Central Hospital |
2013-07-01 |
2023-12-31 |
MWK |
6994011641.44 |
|
|
483 |
091/NUDC/DDF/MPAMADZI BRIDGE/2021 - 2022 FY |
Construction of Mpamadzi Bridge |
completed
|
construction |
Project involved construction of a 10 metre single span concrete deck bridge |
The project aimed at improving accessibility between two areas in order to provide economic benefit to the people. |
2021-08-02 |
2021-11-01 |
MWK |
30000000.00 |
|
|
454 |
RA/MAI/NR/2022-2023 |
The Road and Bridge Maintenance Programme for the 2022/23 NORTH |
implementation
|
rehabilitation |
The Road and Bridge Maintenance Programme for the 2022/23 Financial Year works consist of Sectional Periodic Maintenance, Rehabilitation, Retainer Pothole Patching, Emergency and Urgent works, Routine Term Maintenance; Grading and Reshaping of Trunk, Urban and District Roads and Associated Drainage Works |
Sectional Periodic Road Maintenance |
2022-12-01 |
2023-12-01 |
MWK |
4912390954.35 |
|
|
328 |
CPDC/29/11/22c |
Construction of Market Shed at Chitipa Boma |
completion
|
construction |
The project will construct a market shed at Chitipa Boma |
The project will provide conducive trading place for vendors to ply their trade and reduce roadside accidents due to trading along the streets |
2022-11-29 |
2023-03-29 |
MWK |
26931265.00 |
|
|
323 |
MDC/NCB/GESD/2022-23/Milala |
Construction of a laboratory at Milala CDSS |
implementation
|
construction |
Construction of a laboratory at Milala CDSS |
To improve educational standards in the area. |
2023-02-19 |
2023-05-20 |
MWK |
86596270.75 |
|
|
480 |
70263/12030 |
Construction of National Cancer |
implementation
|
construction |
The Project involves the construction of a Cancer Treatment centre with a Chemotherapy suite, an administration block, a consulting block,
3 wards, 4 Radiotherapy, 2 Brachytherapy Bunkers, nuclear medicine block, Treatment and imaging block, waiting hostels, laboratory, a theatre and other supporting amenities. |
To construct a National Cancer Centre with Radiotherapy bunkers |
2017-08-01 |
2023-12-30 |
USD |
22450000.00 |
|
|
320 |
KADC/DDF/W/DC'S-OFC/2020-2021/01 |
Construction of Karonga DCs Office |
implementation
|
construction |
Construction of the DCs Office in Karonga District |
Provision of office space for the District Commissioner and other officer, since the old office was set on fire. |
2022-12-22 |
2023-04-10 |
MWK |
99979939.00 |
|
|
319 |
KADC/GESD |
Ngerenge Dispensary |
completion
|
construction |
Construction of Ngerenge Dispensary in Karonga district. |
Providing health services to the community |
2022-12-21 |
2023-04-30 |
MWK |
97238676.00 |
|
|
312 |
KADC/GESD/W/ZGEBACDSS/22-23/05 |
Construction of Zgeba Secondary School |
completed
|
construction |
Completed |
Provide education to the community |
2022-12-21 |
2023-04-20 |
MWK |
69043760.93 |
|
|
316 |
KADC/GESD/IPONGA STAFF HOUSE/2022-23/03 |
Construction of Iponga CDA Staff House |
completed
|
construction |
Construction of Iponga CDA Staff house in Karonga District |
Provision of Accommodation for the Community development Assistant |
2022-12-21 |
2023-04-20 |
MWK |
46032665.00 |
|
|
314 |
KADC/GESD/W/MLARE MAT-WING/2022-23/07 |
Construction of Mlare Maternity Wing |
completion
|
construction |
Construction of Mlare Maternity Wing in Karonga District |
Provide health services to expectant mothers |
2022-12-21 |
2023-04-10 |
MWK |
91968950.00 |
|
|
317 |
MDC/NCB/GESD/2021-22/05 |
Mkunguni Primary School Block |
completed
|
construction |
Construction of a standard classroom block using cement blocks at Mkunguni. |
To improve pupil-teacher ratio by easing congestion at the school. |
2021-12-19 |
2022-02-28 |
MWK |
22042284.00 |
|
|
315 |
MDC/NCB/GESD/2021-22/01 |
Construction of Luweya Bridge |
completed
|
construction |
Construction of a 25 metre 3 span concrete deck bridge on Luweya river |
To promote access to socio-economic services |
2021-12-28 |
2022-02-26 |
MWK |
47134990.00 |
|
|
307 |
NB/DDF/2122/1 |
Chisangawe School Block |
completion
|
construction |
Construction of Chisangawe School Block at Kandoli ward |
To provide conducive learning environment for learners |
2022-02-02 |
2023-02-02 |
MWK |
24184950.00 |
|
|
476 |
KUMC/ICR/7/2022-2023/26 |
INSTALLATION OF CULVERT RINGS AND RIVER CHANNELLING AT CHIMBUNA WARD |
completion
|
construction |
The project involved excavation works concrete works, masonry works, plastering, backfilling |
To improve accessibility and drainage systems |
2022-07-06 |
2024-03-31 |
MWK |
1000000.00 |
|
|
469 |
KUMC/ICR/7/2022-2023/12 |
CONSTRUCTION OF FOOTPATH BRIDGE ON KASWALIMBA RIVER AT BUNDA WARD |
completion
|
construction |
The project involves excavations, concrete, Carpentry and joinery, plastering |
The purpose of the project is to improve accessibility between communities within the ward |
2022-07-06 |
2024-03-31 |
MWK |
14500000.00 |
|
|
420 |
KUMC/CCPR/7/2022-2023/9 |
CONSTRUCTION OF COMMUNITY POLICE ROOM AT CHITETE WARD |
implementation
|
construction |
The project involves excavations, brickwork, concrete works, roofing and plastering |
The main purpose is to improve security within the ward |
2022-07-06 |
2024-03-31 |
MWK |
7500000.00 |
|
|
363 |
ZCC/DFLA/SHOPS/ENG-SHOPSBUS-DEPORT/2022-2023/3 |
CONSTRUCTION OF SHOPS OPPOSITE NEW MPUNGA TAXI RANK |
implementation
|
construction |
Construction of shops in Zomba City Bus Depot opposite New Mpunga Taxi Rank |
Provide business environment to the residents |
2023-03-24 |
2023-09-20 |
MWK |
281104455.85 |
|
|
337 |
BT-DDF 2023/005 |
Sukali Bridge |
completed
|
construction |
Construction of a Bridge |
to facilitate accessibility to social services |
2022-11-15 |
2023-03-23 |
MWK |
12500000.00 |
|
|
388 |
BLK-GESD-2-6 |
Construction of Nkasi CDSS School Blocks |
implementation
|
construction |
Construction of Nkasi CDSS School Blocks (1) with three (2) Toilets |
Improve access to Secondary Education |
2023-02-23 |
2023-09-22 |
MWK |
97647278.50 |
|
|
355 |
EGC 595/RFP/BESS/FY2022-23-temp |
4.5 Wovwe Hydropower Plant Expansion Project |
preparation
|
expansion |
EGENCO intends to take advantage of the available capacity at Wovwe to increase the generation output of the station |
To increase the generated power output at Wovwe Power Station |
2018-01-01 |
2027-12-31 |
MWK |
20000000000.00 |
|
|
354 |
EGC 595/RFP/BESS/FY2022-23 |
10MW SCALABLE SOLAR PHOTOVOLTAIC POWER WITH BATTERY ENERGY STORAGE SYSTEM(BESS), AUXILIARY EQUIPMENT AND ASSOCIATED WORKS AT NANJOKA IN SALIMA- PHASE II |
preparation
|
expansion |
EGENCO is in the process of implementing a solar project at Nanjoka in Salima, which has been planned to be done in phases. The first phase of the project is already underway and involves installation of 10MW of solar with 5MWh battery energy storage system (BESS). It is against this background that EGENCO intends to implement the second phase of the 10MW Solar Photovoltaic (PV) electricity generation at Nanjoka in Salima |
The main goal of the project is to increase power supply in the country and improve energy generation mix. |
2023-02-01 |
2026-09-30 |
MWK |
0.00 |
|
|
350 |
EGC 202/RFP/SOLAR/FY2018-19 |
Design, Supply, Installation and Commissioning of 10MW Scalable Solar Photovoltaic Power, Auxiliary Equipment and Associated Works at Nanjoka in Salima. |
preparation
|
construction |
EGENCO intends to install 10MW Solar PV Power Plant with battery at Nanjoka Salima |
The purpose is to add generation capacity to the national grid but also increase EGENCO's generation mix to reduce reliance on Hydro power plants cascaded along the Shire river which are prone to compounding devastation in case of dire irregularities in the flow of the Shire and any disasters. This in turn will help in the stability of the national grid. |
2018-01-01 |
2025-06-30 |
USD |
18000334.86 |
|
|
341 |
ZDC006 |
CHINSEU POLICE UNIT |
implementation
|
construction |
construction of police unit involving construction of office building, toilet and staff house |
for community security |
2023-03-01 |
2023-06-30 |
MWK |
122211094.66 |
|
|
397 |
BLK-GESD-2-8 |
Construction of Concrete Refuse Bins |
implementation
|
construction |
Construction of Concrete Refuse Bins (10) |
Improve sanitation at Balaka Town and other trading centres |
2022-04-01 |
2023-03-30 |
MWK |
32886362.50 |
|
|
336 |
BC494/1 |
Construction of 16 No. E2-72 semi-detached House at Ngumbe and 12 No. flats (2 Blocks) at BCA Hill in Blantyre City by Fargo |
completed
|
construction |
Semi detached of Houses |
To provide affordable houses to the Malawians |
2019-04-15 |
2022-01-14 |
MWK |
1082134232.81 |
|
|
280 |
LDC/GESD/2022-23/CB/04G - Lot 4 |
construction of a classroom block at Dambo Primary School |
completion
|
construction |
construction of a two roomed classroom block |
to reduce the pupil to classroom ratio |
2023-01-13 |
2023-04-13 |
MWK |
42000000.00 |
|
|
282 |
LDC/GESD/2022-23/CB/04G-LOT5 |
Construction of a classroom block at Mtuwakale primary school |
completion
|
construction |
construction of classroom block at Mtuwakale primary school |
To reduce pupil to classroom ratio |
2023-01-13 |
2023-04-13 |
MWK |
41500000.00 |
|
|
300 |
ZCC/RFA/ENG/RD/2022-23/02 |
Rehabilitation of Ndola Roads |
implementation
|
rehabilitation |
Good road network and improving drainage system |
Improve mobility to CBD |
2022-11-01 |
2023-04-30 |
MWK |
8155007.70 |
|
|
309 |
NRWB/RU |
Rumphi Water Supply and Sanitation Services Improvement Project |
preparation
|
construction |
Rumphi water supply system currently provides water to 17,928. Majority of the customers are connected through 20 mm diameter pipelines resulting in very low pressures. Rumphi water supply scheme covers most of the areas of Rumphi Boma except developing areas around the Boma such as Jaghala and Mlongoti which are partly connected and having low pressures. Boundaries of the existing water supply are Mayembe and Phalasitwe Hills to the north, South Rukuru River to the south and east and Chigwere to the west. |
To construct an intake weir for Rumphi water supply system; To upgrade the water treatment plant; To upgrade the water supply transmission systems covering pumps and pipelines including installation of solar power; To upgrade and expand the distribution pipe network including construction of storage tanks; To enhance access to improved sanitation and hygiene services; To construct a sanitary landfill; To construct a liquid waste/ wastewater treatment facility; To manage the catchment area for South Rumphi River. |
2023-08-01 |
2027-07-31 |
USD |
36286000.00 |
|
|
365 |
LWB-EDFP |
LILONGWE WATER BOARD ESTATE DEVELOPER FINANCED PROJECTS |
implementation
|
expansion |
These projects are implemented to reticulate new areas upon request by various estate developers such as Malawi Housing Corporations, Ministry of Lands, etc. |
To increase access to clean water services |
2020-07-01 |
2025-07-31 |
MWK |
2000000000.00 |
|
|
417 |
MW-KDC-311887-CW-RFQ |
construction Kaluluma fish ponds |
implementation
|
construction |
construction Kaluluma two fish ponds |
To enhance the supply of protein through fish farming |
2022-12-01 |
2023-05-31 |
MWK |
15000000.00 |
|
|
421 |
MW-KDC-311881-CW-RFQ |
construction of Kamboni Police staff houses |
implementation
|
construction |
construction of Kamboni Police - two staff houses |
To enhance security in kasungu west constituency |
2022-12-01 |
2023-05-31 |
MWK |
75600000.00 |
|
|
429 |
001/4109/02/22/107 |
Construction of senior chief Lukwa house |
implementation
|
construction |
Construction of senior chief Lukwa house |
To promote local governance through provision of chief housing |
2023-01-09 |
2023-06-30 |
MWK |
62597322.30 |
|
|
433 |
001/4109/10/22/5106 |
construction of Senior chief Kapelura house |
implementation
|
construction |
construction of Senior chief Kapelura house |
To promote local governance through construction of chief houses |
2023-01-09 |
2023-06-30 |
MWK |
67551166.55 |
|
|
438 |
001/4109/10/22/510 |
Construction of Dwelling House for Chief Kaluluma |
implementation
|
construction |
Construction of Dwelling House for Chief Kaluluma |
To enhance local governance through the provision of chiefs housing |
2023-01-09 |
2023-06-30 |
MWK |
67551166.55 |
|
|
453 |
001/GESD/53089/10/21/700 |
Construction of Malosa TDC |
implementation
|
construction |
construction of Malosa TDC to improve education standards |
To support teacher's professional growth, improving teaching practices and ultimately enhancing the quality of education |
2021-12-01 |
2022-05-31 |
MWK |
25000000.00 |
|
|
455 |
001/GESD/53083/10/21/703 |
Construction of Mkhuta Bridge |
implementation
|
construction |
Construction of Mkhuta 2 span concrete bridge |
To ease mobility of the people in Kasungu west -Lifupa ward at Magwazu ADC |
2021-12-01 |
2022-03-31 |
MWK |
20000000.00 |
|
|
458 |
001/GESD/53084/10/21/704 |
completion of Mphomwa health center and construction of staff house |
implementation
|
construction |
completion of Mphomwa health center and construction of staff house |
To improve health service delivery among the popultaion in Kasungu North West - Matenje ward |
2021-12-01 |
2022-03-31 |
MWK |
30000000.00 |
|
|
461 |
001/GESD/53082/10/21/705 |
Construction of Ofesi health center OPD |
implementation
|
construction |
Construction of Ofesi Health Center OPD at Kasungu North North East - Mpeni ward |
To improve health delivery among the people living at Kasungu north north east constituency - Mpeni ward |
2021-12-01 |
2022-03-31 |
MWK |
40000000.00 |
|
|
464 |
001/DDF/53089/10/21/710 |
Construction of 2 span Chiloza bridge |
implementation
|
construction |
construction of 2 span Chiloza bridge |
To easy mobility and connectivity to people of Kasungu north east constituency - Mbongozi ward |
2021-12-01 |
2022-03-31 |
MWK |
40000000.00 |
|
|
465 |
001/DDF/53087/10/2`1/708 |
Construction of Chinyama Health center staff house |
implementation
|
construction |
construction of Chinyama Health Center staff house |
To improve health service delivery through provision of decent houses to medical personnel |
2021-12-01 |
2022-03-31 |
MWK |
15000000.00 |
|
|
467 |
001/DDF/53088/10/21/707 |
construction of Gogode Health center maternity wing |
implementation
|
construction |
construction of Gogode maternity wing in kasungu central- Chipala ward |
To improve health service delivery and reduce maternal mortality rate
To reduce congestion at Kasungu district hospital |
2021-12-01 |
2022-03-31 |
MWK |
40000000.00 |
|
|
468 |
001/DDF/53081/10/21/706 |
Rehabilitation Lodjwa Health center maternity wing |
implementation
|
rehabilitation |
construction Lodjwa Health center maternity wing |
To improve health service delivery especially among women of reproductive age group. |
2021-12-01 |
2022-03-31 |
MWK |
20000000.00 |
|
|
473 |
KUMC/RRB/7/2022-2023/16 |
ROAD RESHAPING FROM GOD IS GOOD SHOP TO PCCM CHURCH |
completion
|
construction |
The project involves forming a road camber and unlined drainage systems using labour intensive |
To improve accessibility of communities within the ward |
2022-07-06 |
2024-03-31 |
MWK |
996810.00 |
|
|
227 |
LCC/1/pw |
Drainage improvement at sese 24 ward |
completed
|
construction |
Drainage improvement at sese 24 ward |
there was construction of drains and culverts to improve drainage system |
2022-09-01 |
2023-11-30 |
MWK |
5828550.00 |
|
|
228 |
LCC/1/pw |
Construction of footbridge at mosque in area 24 |
completed
|
construction |
Construction of footbridge at mosque in area 24 |
Construction of footbridge at mosque in area 24 |
2023-02-23 |
2023-04-24 |
MWK |
13525475.25 |
|
|
305 |
DADC/MLG/CNGCSA/W/2021-2022 |
Completion of social amenities( community ground, hall, library and bus depot) |
implementation
|
construction |
construct, hall library and bus depot and its associated works |
to improve the social well being of individuals at Nambuma growth center |
2022-03-04 |
2022-10-21 |
MWK |
618353349.71 |
|
|
329 |
PPDA/01/1/2022 |
Partition of JIREH house into PPDA offices electrical works |
completion
|
construction |
partitioning of building and associated works |
To provide more working space for the PPDA members of staff |
2022-05-23 |
2022-06-10 |
MWK |
45338902.50 |
|
|
384 |
NS/IPDAC/22/RFQ/WKS/02 |
Electrification of Malomo Rural Growth Centre Market |
completed
|
construction |
Constructing all infrastructure to allow for electricity connectivity. |
To have access to electricity at the trading centre for diverse businesses that cater community members. |
2022-03-26 |
2022-04-15 |
MWK |
16500000.00 |
|
|
395 |
NS/IPDAC/WKS/2021-22/01-LOT 3 |
Masangano Classroom block |
completed
|
construction |
Construction of a classroom block at Masangano to cater to 120 students |
To increase the number of classrooms and reduction in Pupil
congestion. |
2021-12-29 |
2022-03-31 |
MWK |
32815617.00 |
|
|
484 |
70263/24320 |
Improved Access of Primary Health Service Delivery Project (Construction of 55 Health Posts) |
implementation
|
construction |
Involves the construction of a Health Post OPD Building and 2 Staff houses with solar system and water reticulation |
The Project was designed to improve the accessibility of primary level health services to the underserved people. |
2022-04-01 |
2025-12-31 |
MWK |
12800000000.00 |
|
|
485 |
XXXXX |
Renovate laboratories to allow molecular testing (Conventional PCR) |
preparation
|
rehabilitation |
The Project involves the renovation of laboratories in 3 District Hospitals to allow allow molecular testing (Conventional PCR) |
The Project will improve diagnostic capacity of District Hospitals to allow molecular testing |
2022-03-01 |
2025-12-31 |
USD |
150000.00 |
|
|
487 |
RA/MAI/NR/2022-2023 |
The Road and Bridge Maintenance Programme for the 2022/23 NORTH 2 |
implementation
|
rehabilitation |
The Road and Bridge Maintenance Programme for the 2022/23 Financial Year works consist of Sectional Periodic Maintenance, Rehabilitation, Retainer Pothole Patching, Emergency and Urgent works, Routine Term Maintenance; Grading and Reshaping of Trunk, Urban and District Roads and Associated Drainage Works |
Sectional Periodic Road Maintenance |
2022-12-01 |
2023-12-01 |
MWK |
4912390954.35 |
|
|
488 |
0011 |
Construction of Phalombe District Hospital |
completed
|
construction |
The project involves the construction of a 250-bed capacity hospital with different structures like an administration block, an Outpatient Department, Maternity block, X- Ray block, Paediatrics, Nutrition and rehabilitation unit, Kitchen and Laundry, Laboratory, Maternal and child health, Mortuary, Staff houses, External works like incinerators, Gas plant, amongst other structures. |
improve access to health care services |
2011-01-01 |
2022-10-11 |
USD |
22756242.83 |
|
|
489 |
002 |
Construction of the Lilongwe Institute of Orthopedic and Neurosurgery (LION) |
completed
|
construction |
The project involved the construction of an orthopedic and Neurosurgery centre at the Kamuzu Central Hospital. The LION Trust is responsible for sourcing funds for the facility. |
improve health service delivery |
2016-01-01 |
2023-04-28 |
USD |
32000000.00 |
|
|
490 |
RA/CON/2019-20/02 |
Multinational Nacala Road Corridor Development Project Phase V: Feasibility Study, Detailed Engineering Design for the Rehabilitation of Mangochi - Chiponde Road |
implementation
|
rehabilitation |
Design for the Rehabilitation of Mangochi - Chiponde Road |
The development and growth of the economy |
2022-08-18 |
2023-06-07 |
USD |
421506.50 |
|
|
491 |
P-MW-DB0-022 |
Multinational Nacala Road Corridor Development Project Phase V: Consultancy Services for Design Review and Supervison of Nsipe - Chingeni - Liwonde Road Rehabilitation |
implementation
|
rehabilitation |
Consultancy Services for Design Review and Supervison of Nsipe - Chingeni - Liwonde Road Rehabilitation |
The development and growth of the economy |
2022-09-26 |
2023-05-21 |
USD |
263050.00 |
|
|
492 |
"DODMA/WOR/2019/05A (Design Phase)" |
Detailed Engineering Design and Construction Supervision Services of Selected Bridges on Mangochi – Makanjira Road |
implementation
|
rehabilitation |
Design Phase |
To produce a safe bridge that is elegant and satisfies all functionality requirements. |
2022-06-28 |
2022-12-31 |
USD |
254299.53 |
|
|
493 |
RA/DEV/RU-CP/2021-22/06w |
Consultancy Services for Feasibility Study and Detailed EngineeringDesign for Upgrading of Rumphi- Nyika - Chitipa (M009) Road - LOT 1: Gamba Gate - Chitipa |
implementation
|
rehabilitation |
Detailed Engineering Design for Upgrading of Rumphi- Nyika - Chitipa (M009) Road - LOT 1: Gamba Gate - Chitipa |
Roads open up more areas and stimulate economic and social development |
2022-11-04 |
2023-11-09 |
MWK |
324438000.00 |
|
|
494 |
RA/DEV/BT-LL/2021-22/10 |
Consultancy Services for Feasibility Study and Detailed Engineering Design for Capacity Improvement of Blantyre - Lilongwe (M001) Lot 2: Lunzu - Junction with M002 Road |
implementation
|
rehabilitation |
Feasibility Study and Detailed Engineering Design for Capacity Improvement of Blantyre - Lilongwe (M001) Lot 2: Lunzu - Junction with M002 Road |
Roads open up more areas and stimulate economic and social development |
2022-12-02 |
2023-04-21 |
MWK |
1180342.50 |
|
|
496 |
MDC/GESD/MAKILINDENI/2022-23/006 |
Construction of Water Supply at Makilindeni |
implementation
|
construction |
Construction of a Solar Powered Water Supply at Makilindeni to supply nearby Schools |
To provide clean portable water to the schools |
2023-02-07 |
2023-04-08 |
MWK |
18275008.36 |
|
|
498 |
CPDC/15/12/2022 |
Construction of Teacher's House at Namutegha Primary School |
completion
|
construction |
Construction of the modern teacher's house at Namutegha Primary School |
To provide a conducive habitable dwelling residence for teachers hence reducing the pupil-teacher ratio and consequently improving the educational attainment of learners |
2022-12-22 |
2023-03-22 |
MWK |
30422465.36 |
|
|
499 |
Chintheche |
Chintheche Kiosks |
completion
|
construction |
Construction of chintheche kiosks for the business operations |
for commercial activities |
2023-01-14 |
2023-06-14 |
MWK |
23000000.00 |
|
|
503 |
MDC/GESD/EKWENDENI P UNIT/2022-23/002 |
Construction of Ekwendeni Police Unit |
implementation
|
construction |
The project involves construction of a police unit and provision of furniture |
To provide security to Ekwendeni and surrounding communities and the general public |
2023-03-07 |
2023-05-06 |
MWK |
63042539.21 |
|
|
506 |
MCC/ROADS/PP/23/01/26 A LOT 1 |
POTHOLE PATCHING AND ASSOCIATED DRAINAGE WORKS |
implementation
|
rehabilitation |
The project shall involve pothole patching which consists of pothole cuttings, pinning, backfilling with subbase or base material and asphalt and also culvert cleaning and drain cleaning. |
The Council would like to recondition the status of the roads and improve some drainage system. |
2023-03-15 |
2023-06-15 |
MWK |
36024950.00 |
|
|
508 |
MDC/NCB/GESD/2021-22/02 |
Construction of Khosolo Police Unit Block |
completed
|
construction |
Construction of a police unit at Khosolo. |
To improve security levels around Kholoso. |
2021-12-19 |
2022-03-19 |
MWK |
23203057.56 |
|
|
510 |
CPDC/11/02/2023 |
Construction of teachers house at Kavumulo Primary School |
implementation
|
construction |
Construction of a modern teachers' house |
The project will provide decent accomadtion to a teacher which will in turn improve the learning outcome of learners as the pupil-teacher ratio gets reduced |
2023-01-17 |
2023-05-17 |
MWK |
30422000.00 |
|
|
514 |
CPDC/29/11/22d |
Construction of a teacher's house at Nkhanga Primary School |
implementation
|
construction |
The project will involve the construction of a modern teacher's house |
The project will accord a teacher with a conducive dwelling unit which will not only motivate the teacher but also aid in improving the learning outcomes at the school by learners |
2022-12-06 |
2023-03-06 |
MWK |
26702567.80 |
|
|
517 |
Slaughter House |
Construction of Slaughter house at Nkhata-bay |
completion
|
construction |
There was no animal slaughter at the Nkhata-bay Boma |
to improve on the animal health and tract animal-human communicable diseases |
2023-01-14 |
2023-06-14 |
MWK |
45000000.00 |
|
|
518 |
Kamwala |
Construction of Kamwala under-5 clinic and staff hous |
completion
|
construction |
Construction of staff house and completion of under five clinic at Kamwala in upper Zilakoma |
to improve health service delivery |
2023-01-14 |
2023-06-14 |
MWK |
48084566.66 |
|
|
519 |
MDC/NCB/GESD/2021-22/09 |
Renovation of clinic and staff house completion at Wateleka Health Post |
completed
|
rehabilitation |
Rehabilitation of an existing health post building and completion of a staff house. |
Improve health outcomes of people in the area by reducing the distance Mzimba district hospital. |
2021-12-20 |
2022-02-18 |
MWK |
15478603.00 |
|
|
521 |
Bugano CDSS Staff house |
Completion of Bungano staff house |
completed
|
rehabilitation |
Completion of Bungano staff house |
To improve service delivery in education sector |
2023-01-14 |
2023-06-14 |
MWK |
4500000.00 |
|
|
523 |
Chiwisi School Block |
completion of Chiwisi School brock |
completed
|
replacement |
the school block was reaped off due to heavy rains |
to improve the welfare of the students at the institution |
2022-01-14 |
2022-06-14 |
MWK |
4500000.00 |
|
|
526 |
MCC/ROADS/CUL/IDF/2022/10/01 |
CULVERT LINE CONSTRUCTION AND MAINTANANCE IN ZOLOZOLO WARD, CHIBANJA, NKHORONGO AND MCHENGAUTUBA WEST WARD |
implementation
|
construction |
Contruction and Maintenace of various culverts in the aforementioned areas |
To improve connectivity and mobility |
2023-01-25 |
2023-06-25 |
MWK |
38173850.00 |
|
|
527 |
MDC/NCB/GESD/2021-22/010 |
High Yielding Borehole Drilling |
completed
|
construction |
Bore hole drilling, pump installation and related civil works at Yachema Chirwa Village, Kadozo-Mguntha Village, Watereka Health Post, Vibangalala Health Post and Wateleka Health post. |
To provide easy access to portable water people of Yachema Chirwa Village, Kadozo-Mguntha Village, Watereka Health Post, Vibangalala Health Post and Wateleka Health post. |
2022-01-18 |
2022-02-02 |
MWK |
14853875.00 |
|
|
528 |
MCC/ROADS/GRAV/IDF/10/03 |
SPOT GRAVELLING AND DRAINANAGE IMPROVEMENT IN CHIPUTULA, CHIBAVI EAST, AND CHIBANJA WARD |
preparation
|
rehabilitation |
Execution of spot gravelling and drainage improvement in the aforementioned areas |
To improve mobility and transportation of agricultural produce and merchandise. |
2023-01-25 |
2023-06-25 |
MWK |
33593250.00 |
|
|
530 |
Mpamba |
Mpamba additional market sheds |
completed
|
construction |
construction of market sheds at Mpamba |
to improve commercial activities |
2021-03-16 |
2021-08-16 |
MWK |
19268328.77 |
|
|
532 |
Chintheche |
Construction of Brick Perimeter Fence, 2 Market Sheds, Refuse Bank and Kiosks at Chintheche Market |
completed
|
construction |
Construction of Brick Perimeter Fence, 2 Market Sheds, Refuse Bank and Kiosks at Chintheche Market |
To improve commercial activities |
2022-01-14 |
2022-06-14 |
MWK |
40000000.00 |
|
|
525 |
MDC/NCB/GESD/2021-22/09 |
Installation of solar and grid powered pumping system at Vibangalala and Wateleka Health Posts |
completed
|
construction |
Installing solar and grid powered pumping system at Vibangalala and Wateleka Health Posts. |
To improve water supply at Vibangalala and Wateleka Health posts. |
2021-12-19 |
2022-02-17 |
MWK |
16066443.21 |
|
|
515 |
MDC/NCB/GESD/2021-22/08 |
Construction of Mbalachanda Police Unit Block |
completion
|
construction |
Construction of police unit and double hole pit latrine using cement blocks. |
Improving security levels in the surrounding area. |
2021-12-19 |
2022-02-27 |
MWK |
23203057.56 |
|
|
511 |
MDC/NCB/GESD/2021-22/04 |
Njuyu EPA Office |
completed
|
construction |
Construction of an EPA office at Njuyu |
To improve agricultural extension service delivery in the area. |
2021-12-19 |
2022-02-17 |
MWK |
21500000.00 |
|
|
500 |
MDC/NCB/GESD/2021-22/07 |
Construction of Vibangalala Maternity Wing |
completed
|
construction |
Construction of a maternity wing at Vibangalala in TA Vibangalala. |
The project focusses on reducing the distance thereby improving the accessibility of maternal health services. |
2021-12-21 |
2022-03-21 |
MWK |
49188877.22 |
|
|
509 |
MDC/GESD/LUWELEZI/2022-23/009 |
Construction of Maternity Wing at Luwelezi Health Centre |
implementation
|
construction |
The project involves construction of maternity block, incinerator, placenta pit and provision of furniture |
To improve health delivery services |
2023-02-07 |
2023-06-07 |
MWK |
124237098.88 |
|
|
516 |
MDC/GESD/CHIPHO/2022-23/011 |
Construction of School Block at Chipho Primary School |
implementation
|
construction |
The project involves construction of a double classroom block and double VIP toilet |
To improve teaching and learning environment |
2023-02-07 |
2023-04-08 |
MWK |
43371919.47 |
|
|
534 |
Mzenga |
Mzenga foot bridge |
completed
|
construction |
Construction of Mzenga foot bridge connecting Mzenga and Chiwawani |
To prmote trade by facilitating easy transportation |
2021-12-07 |
2022-03-07 |
MWK |
11799814.00 |
|
|
535 |
Makumbo |
Construction of Makumbo satff house |
completion
|
construction |
The constrcution of the satff house at Makumbo will facilitate easy service delivery as the community will have readily available health personnel |
It is meant to reduce avoidable death which are often due to long distance traveled in accessing the health services. |
2021-12-14 |
2022-04-01 |
MWK |
27699975.81 |
|
|
536 |
Usingini-Usisya |
Installation of Usingini-Usisya water pipe line |
cancelled
|
expansion |
The project was meant to improve safe , potable and hygiene water accessibility among households in Usisya |
To promote accessibility to safe, potable and hygiene water accessibility among households in Usisya |
2023-01-14 |
2023-06-14 |
MWK |
35237075.00 |
|
|
537 |
Chituka |
Chituka Dispensary equipment |
completed
|
replacement |
The community will have no more problem of traveling long distance to acquire the health services |
The community will have no more problem of traveling long distance to acquire the health services |
2022-05-05 |
2022-06-05 |
MWK |
8059460.00 |
|
|
497 |
Mpamba |
Mpamba market sheds |
completion
|
construction |
there is construction of market sheds at mpamba market in order to promote commercial activities |
to promote commercial activities |
2023-01-14 |
2023-06-14 |
MWK |
60000000.00 |
|
|
542 |
BCC/W/Chi-Mpe-Bypass/2017-18 |
Upgrading to Asphalt Surface of Chigumula to Mpemba By pass |
implementation
|
construction |
Upgrading to Asphalt Surface of Chigumula to Mpemba By pass |
Transportation |
2018-02-28 |
2021-10-20 |
MWK |
4662335485.00 |
|
|
543 |
Construction of North Road |
Construction of North Road- Market street (Behind Limbe Escom) 0.5 Km- LOT 5 |
implementation
|
construction |
Construction of North Road- Market street (Behind Limbe Escom) 0.5 Km- LOT 5 |
Transportation |
2021-04-21 |
2022-03-15 |
MWK |
465423689.06 |
|
|
544 |
Rehabilitation of Kapeni road- Mahatma Ghandi |
Rehabilitation of Kapeni road- Mahatma Ghandi in Blantyre City (0.8 km)- Lot 4 |
completed
|
construction |
Rehabilitation of Kapeni road- Mahatma Ghandi in Blantyre City (0.8 km)- Lot 4 |
Trasportation |
2021-04-21 |
2022-02-14 |
MWK |
454670253.00 |
|
|
545 |
BCC/RFA- |
Construction of Chilobwe- Stella maris Road in Blantyre City-Lot 6 |
completed
|
construction |
Construction of Chilobwe- Stella maris Road in Blantyre City-Lot 6 |
Transportation |
2021-04-21 |
2022-02-14 |
MWK |
758792250.30 |
|
|
547 |
Construction of Namiwawa-Sunnyside (Bank road and Smythe road (2Km)) |
Construction of Namiwawa-Sunnyside (Bank road and Smythe road (2Km)) |
implementation
|
construction |
Construction of Namiwawa-Sunnyside (Bank road and Smythe road (2Km)) |
Transportation |
2022-02-21 |
2022-08-20 |
MWK |
1862160202.88 |
|
|
548 |
Construction of Lali Lubani road across Masauko Chipembere highway via Malawi Polytechnic Village-Kenyatta drive (1.7 Km)) |
Construction of Lali Lubani road across Masauko Chipembere highway via Malawi Polytechnic Village-Kenyatta drive (1.7 Km)) |
implementation
|
construction |
Construction of Lali Lubani road across Masauko Chipembere highway via Malawi Polytechnic Village-Kenyatta drive (1.7 Km)) |
Transportation |
2022-02-21 |
2022-08-20 |
MWK |
1791304627.80 |
|
|
549 |
Construction of Chipatala Avenue-Kamba (1.2Km) |
Construction of Chipatala Avenue-Kamba (1.2Km) |
implementation
|
construction |
Construction of Chipatala Avenue-Kamba (1.2Km) |
Transportation |
2022-02-21 |
2022-08-20 |
MWK |
1343621469.75 |
|
|
550 |
Construction of Newlands-Manje via Chiwembe Road (2Km) |
Construction of Newlands-Manje via Chiwembe Road (2Km) |
implementation
|
construction |
Construction of Newlands-Manje via Chiwembe Road (2Km) |
Construction of Newlands-Manje via Chiwembe Road (2Km) |
2022-02-21 |
2022-08-20 |
MWK |
1635220587.63 |
|
|
551 |
BCC/CDF- |
Construction of Michiru road-Likhubula (Black box) (1.5 Km) |
implementation
|
construction |
Construction of Michiru road-Likhubula (Black box) (1.5 Km) |
Transportation |
2022-02-21 |
2022-08-20 |
MWK |
1375922853.90 |
|
|
552 |
PSIP 2216 |
Kholongo Multipurpose Dam (Water Supply and Irrigation) for Mponela Town and surrounding areas |
implementation
|
construction |
The project involves the construction of a multipurpose dam, development of a water supply system, development of an irrrigation system and development of fish farms. The Multi-Purpose Dam shall be a source of water for domestic and industrial consumption, irrigation, fish farming, tourist activities and as well as maintaining environmental flows. The areas that are earmarked to be supplied with potable water by the Dam construction include Mponela Town and other surrounding areas including Mtiti, Madisi, Kanyungu, Kawele, Chimungu, Ndiliro Trading Centres. |
The purpose of the project is to increase access to potable water supply to over 153,000 people in Mponela town and surrounding areas, improve water reliability to 24 hours a day in Mponela town and surrounding areas, and Improve food security and community livelihood to 4,400 households around the project area through irrigation and fish farming |
2023-02-23 |
2026-02-24 |
MWK |
67444214703.95 |
|
|
512 |
Council Rest house |
Rehabilitation of Nkahata-Bay council Rest house |
completion
|
rehabilitation |
The rehabilitation of Coucil Rest house |
increase the profit of the enterprise |
2023-01-14 |
2023-06-14 |
MWK |
41746806.00 |
|
|
553 |
PSIP 2216 |
Construction of Kholongo Multipurpose Dam (Water Supply and Irrigation) for Mponela Town |
implementation
|
construction |
The project involves construction of a multipurpose dam, development of a water supply system, development of an irrigation system and development of fish farms. The Multi-Purpose Dam shall be a source of water for domestic and industrial consumption, irrigation, fish farming, tourist activities and as well as maintaining environmental flows. The areas that are earmarked to be supplied with potable water by the Dam construction include Mponela Town and other surrounding areas including Mtiti, Madisi, Kanyungu, Kawele, Chimungu, Ndiliro Trading Centres. |
The purpose of the project is to increase access to potable water supply to over 153,000 people in Mponela town and surrounding areas, improve water reliability to 24 hours a day in Mponela town and surrounding areas, and Improve food security and community livelihood to 4,400 households around the project area through irrigation and fish farming. |
2023-02-23 |
2026-02-24 |
MWK |
67444214703.95 |
|
|
554 |
PSIP 2108 |
Dowa Supply and Sanitation Project |
preparation
|
construction |
The project will involve the upgrading and expansion of the existing water supply system in Dowa Town and surrounding areas and provide access to improved potable water supply and sanitation services. |
The purpose of the project is to contribute to the economic development of the country by improving the health and livelihoods of the residents of Dowa Town and its surrounding areas. The main objective is, by 2035, to increase access to reliable and sustainable potable water supply and improved sanitation services for the socio-economic growth of over 150, 120 people of Dowa Town and surrounding areas |
2023-08-01 |
2025-07-31 |
USD |
32000000.00 |
|
|
559 |
ZCC/DFLA/SHOPS/ENG-FLEA-MARKET/2022-2023/1 |
CONSTRUCTION OF FLEA MARKET SHOPS |
implementation
|
construction |
Construction of Shops at Flea Market |
Increase City Revenue base and economic activities |
2023-03-24 |
2023-09-20 |
MWK |
204016347.27 |
|
|
560 |
06/2020 |
Construction of 10,000 Houses for Security Institution Phase 1 |
implementation
|
construction |
The 10,000 housing for security institutions project is a national initiative by the Government of Malawi, through the Ministry of Lands, Housing and Urban Development, to provide decent accommodation for the members of the Malawi Police Service, the Malawi Defence Force, the Malawi Prison Service and the Department of Immigration and Citizenship Services. |
The 10,000 housing for security institutions project is a national initiative by the Government of Malawi, through the Ministry of Lands, Housing and Urban Development, to provide decent accommodation for the members of the Malawi Police Service, the Malawi Defence Force, the Malawi Prison Service and the Department of Immigration and Citizenship Services. |
2021-04-01 |
2025-03-31 |
MWK |
3500000000.00 |
|
|
561 |
06/2020 |
Construction of 10,000 Housing Units Phase 2 |
preparation
|
construction |
The 10,000 housing for security institutions project is a national initiative by the Government of Malawi, through the Ministry of Lands, Housing and Urban Development, to provide decent accommodation for the members of the Malawi Police Service, the Malawi Defence Force, the Malawi Prison Service and the Department of Immigration and Citizenship Services. |
The 10,000 housing for security institutions project is a national initiative by the Government of Malawi, through the Ministry of Lands, Housing and Urban Development, to provide decent accommodation for the members of the Malawi Police Service, the Malawi Defence Force, the Malawi Prison Service and the Department of Immigration and Citizenship Services. |
2021-04-01 |
2025-03-31 |
MWK |
3500000000.00 |
|
|
595 |
MAZA |
Malawi-Zambia Transmission Interconnection Project |
preparation
|
construction |
The 400kV Malawi-Zambia Interconnector Project will involve constructing a 400kV power line from the 400/132kV Nkhoma Substation in Lilongwe in Malawi to the existing Chipata West 330/132kV substation in Zambia. The total line distance is approximately 184 km out of which 40km is in Zambia and 144km is in Malawi. ZESCO has indicated its intention to upgrade the Chipata substation to 400kV |
To strengthen security of supply through Reginal power interconnection |
2018-01-01 |
2020-05-30 |
USD |
1000000.00 |
|
|
597 |
EPC Plus F-Government of Malawi/ESCOM |
132kV Eastern Backbone Overhead line Project |
preparation
|
construction |
1. Construction of a 293km 132kV line from the 400/132kV Nkhoma Substation in the Central Region through 132/33kV Nanjoka Substation (Salima), 132/66/33kV Nkhotakota Substation, and 132/33kV Dwangwa Substation to 132/66/33/11kV Chintheche Substation in the Northern Region.
2. Construction of an 83km 132kV line from Nkhotakota substation to Chinyama substation to replace the existing 66kV line which is on wooden structures and uses very small conductor leading to high losses and poor quality of supply. Among other customers, Chinyama substation supplies Shayona Cement Company who have applied for additional load of 6MW and it is impossible to supply them with the existing line, hence the need for upgrading. Chinyama substation will be upgraded from 66/33kV to 132/33kV.
3. Construction of a 43 km 132kV line from Chinyama substation to Kanyika and construction of a 25MVA, 132/33kV substation at Kanyika to supply an 18 MW Niobium mine. The substation will also be connected to the existing 33kV network in the area to improve power quality and operational flexibility.
4. Upragding of Nanjoka 132/33kV substation capacity from 15 MVA to 50 MVA to accommodate a 22MW water pumping project from Lake Malawi in Salima to Lilongwe City. The substation is currently loaded up to more than 80% of its capacity at peak. Apart from the water pumping project, the substation will also supply several other step loads from customers who applied for power such as the Salima Sugar factory which will require 12MW additional load from Nanjoka substation. Apart from the JCM 60MW Solar PV plant which is connected to this substation, the substation is also earmarked to be the connection point for two more independent power producers namely, a 20MW Solar PV plant by EGENCO and a 75MW Multi-Fuel Powered generation thermal plant by AZA. |
This project aims to upgrade the existing Transmission network which carries power from the Southern to the Central and Northern Regions. This network can no longer sustain growth in Power and Energy demand due to its current condition.As one of the measures to increase power transfer capacity and propel economic growth, a project to construct a new single circuit 132kV Transmission Line on the Eastern Corridor of the country from the Central to the Northern Region to replace an existing single circuit Wooden Pole 132kV Transmission line has been initiated. |
0202-01-01 |
2026-06-30 |
USD |
101000000.00 |
|
|
596 |
LLW-JICA |
Project for the improvement of substations In Lilongwe city |
implementation
|
expansion |
The Governments of Japan and Malawi signed a Grant Agreement where the Japanese Government, through Japan International Cooperation Agency (JICA), is financing a project to rehabilitate and upgrade Kanengo (Lilongwe B) and Old town (Lilongwe A) transmission substations in the Central Region. At Kanengo 132/66/33/11kV substation, several transformers with their attendant switchgear will be replaced by new and higher rated ones and a new 11kV control room will be constructed. At Old town 66/33/11kV substation, a new substation will be constructed with a new control room and switchgear to replace the existing substation. |
To increase capacity of Transformers at kanengo and old town substations thereby allowing an increase on customers. |
2022-06-01 |
2024-12-30 |
JPY |
2610000000.00 |
|
|
594 |
MEAP |
Malawi Electricity Access Project |
implementation
|
expansion |
With financing from World Bank, ESCOM is undertaking the on-grid connection of additional 180,000 customers in 4 years. This would bring the Malawi on- Grid electricity access rate to around 30% by 2030, from 12% as at the start of the project in 2020. |
The main objective aims at increasing on-Grid electricity access to 30% by 2030, thereby bringing the total electricity access rate for the Country to 50% by 2030. |
2020-01-01 |
2024-06-30 |
USD |
65000000.00 |
|
|
600 |
ESSP-PERI URBAN |
PERI URBAN NETWORK REINFORMENT PROJECT |
preparation
|
expansion |
The project will extend Distribution network to mushrooming peri urban settlements |
To expand the distribution network and increase access to electricity |
2024-01-01 |
2026-01-31 |
MWK |
34500000000.00 |
|
|
601 |
ZCC/DFLA/SHOPS-SHOPRITE/2022/2023/2 |
Construction of Commercial Shops along Namiwawa Road |
implementation
|
construction |
Construction of single storey commercial shop located opposite Old shoprite |
Expanding revenue base as well as increasing trade surface to ensure continued local economic activity. |
2023-05-28 |
2023-09-24 |
MWK |
424759399.25 |
|
|
593 |
MOMA |
Mozambique-Malawi 400KV Transmission Line Interconnection Project (MOMA) |
implementation
|
construction |
Mozambique-Malawi 400KV Transmission Line Interconnection Project (MOMA) |
The aim is to establish a power transmission link between Mozambique and Malawi to meet increasing electricity demand in Malawi, and to create opportunities for trading in the Southern African Power Pool (SAPP). |
2021-11-03 |
2023-12-31 |
USD |
24704085.00 |
|
|
598 |
ESCOM OFFICE COMPLEX |
Detailed Design and Construction of ESCOM office complex |
preparation
|
construction |
Architectural designs, conceptual designs, preliminary engineering designs and detailed designs for Construction of ESCOM office Complex in Blantyre. |
To execute architectural designs, conceptual designs, preliminary engineering designs and detailed designs |
2021-06-01 |
2022-01-31 |
MWK |
775000000.00 |
|
|
602 |
WC/UNIMA/03/01/23 |
Construction of Prefabricated Classrooms Blocks |
implementation
|
expansion |
Construction of Prefabricated Classroom Block and Associated External Works |
To cater for double cohort admission undertaken as a mitigation measure against Covid-19 |
2023-08-31 |
2024-03-05 |
MWK |
3000000000.00 |
|
|
541 |
BCC/W/Dual Carriageway/2017-18 |
Dualisation of Clock Tower to Kameza Roundabout |
implementation
|
construction |
Dualisation of Clock Tower to Kameza Roundabout |
Transportation |
2006-10-09 |
2031-06-20 |
MWK |
11411957489.70 |
|
|
608 |
BCC/Projects |
Construction of drainage System and Associated Works in Blantyre City |
implementation
|
construction |
Construction of drainage System and Associated Works in Blantyre City |
Drainage improvement |
2023-05-05 |
2023-10-06 |
MWK |
1415757289.91 |
|
|
609 |
BCC/RFA- |
Construction of Ndirande - Nkolokoti (Makheta) Road to Asphalt Surface in Blantyre City - Lot 3 |
implementation
|
construction |
Construction of Ndirande - Nkolokoti (Makheta) Road to Asphalt Surface in Blantyre City - Lot 3 |
Provide access |
2022-08-03 |
2023-11-10 |
MWK |
3042438188.79 |
|
|
611 |
BCC/RFA- |
Pothole Patching and Associated Routine Maintenance Works on Selected Urban Paved Roads in Blantyre City -Limbe Area-LOT 2 |
completed
|
rehabilitation |
Pothole Patching and Associated Routine Maintenance Works on Selected Urban Paved Roads in Blantyre City -Limbe Area-LOT 2 |
Improve road condition |
2023-02-13 |
2023-06-12 |
MWK |
150654137.81 |
|
|
615 |
SRWB/ICB/BP/2022-23 |
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF WATER BOTTLING PLANT AND RELATED ACCESSORIES |
implementation
|
construction |
Supplying of the treatment and bottling equipment and the construction of the building to accommodate the equipment and offices |
To supply bottled water in the country |
2023-04-27 |
2023-10-26 |
USD |
2066683.17 |
|
|
616 |
ZCC/RFA/ENG/BRI/2022-2023/01 |
CONSTRUCTION OF NAPHAMBO BRIDGE |
implementation
|
construction |
Construction of 32 metre TWO Span Concrete Bridge |
Connecting communities from Thundu and sorrounding area to ThomAllan Matawale area across Likangala river for trade, social and health services |
2023-06-13 |
2023-12-10 |
MWK |
469063787.50 |
|
|
622 |
BDC/RFQ/DDF/2020-2021 |
Construction of Kwitanda Maternity Wing |
completed
|
construction |
Construction works of Kwitanda Maternity Wing block and construction of a placenta pit |
to improve health service delivery |
2021-06-03 |
2022-10-31 |
MWK |
59452412.20 |
|
|
627 |
P165704 |
Mpatamanga Hydropower Project |
preparation
|
construction |
The Government of Malawi through the Ministry of Energy and EGENCO as implementing agencies is targeting the development of a 350 megawatt (MW) hydropower project (HPP) at Mpatamanga Gorge on the Shire River in southern Malawi. |
The objective is to increase Hydro Power generation capacity through a Public Private Partnership in Malawi. |
2024-04-01 |
2029-03-31 |
USD |
0.00 |
|
|
629 |
EGC315/EOI/CS/FY2023-2024 |
CHIZUMA AND CHASOMBO HYDROELECTRIC PROJECT |
preparation
|
construction |
EGENCO intends to explore combining Chizuma and Chasombo into one power plant with an aggregate capacity of 83MW. |
Increase Hydro Power capacity of Malawi and diversify away from the Shire River Cascade. |
2023-01-01 |
2033-03-31 |
MWK |
0.00 |
|
|
631 |
MW-MDC 318973-CW-RFQ |
Construction of Boma Shops |
completed
|
construction |
Constructing 5 shops and completing toilet block that was at window level. |
Revenue generation for the council |
2023-01-18 |
2023-05-18 |
MWK |
60699999.76 |
|
|
632 |
SRWB/W/22/01 |
REHABILITATION AND MAINTENANCE OF NEW SOUTHERN REGION WATER BOARD HEAD OFFICE |
implementation
|
rehabilitation |
Rehabilitating and maintaining of new Southern Region Water Board head Office |
Office accommodation |
2022-08-22 |
2023-02-23 |
MWK |
789155952.23 |
|
|
599 |
BESS |
Utility Scale Battery Energy Storage System |
preparation
|
expansion |
The project entails the design, procurement, installation and commissioning of a BESS facility to be used primarily for frequency control, ancillary services and other grid support applications.
The project will also include integration of the BESS into ESCOM’s system operations. |
The goal of this project is to enable integration of variable renewable energy sources into Malawi’s national grid and therefore improve electricity access to about six hundred thousand (600,000) households and industries connected to the national grid. |
2023-01-01 |
2024-12-31 |
USD |
20245000.00 |
|
|
640 |
MW-ZADC-316656-CW-RFB |
MWAMBO YOUTH CENTER |
implementation
|
construction |
Construction of Mwambo Youth Center in Chilunga 2 VDC T/A Mwambo |
to create a conducive environment for youth |
2023-04-01 |
2023-07-30 |
MWK |
58773913.00 |
|
|
642 |
175d493d |
Chang’ambika Girls hostel and supply of furniture |
implementation
|
construction |
Construction of Girls hostel |
To improve Girls access to education |
2023-02-03 |
2023-05-04 |
MWK |
83914116.00 |
|
|
643 |
52579d5c |
Mitondo HSA House |
implementation
|
construction |
Construction of Mitondo HSA House |
To improve health service delivery through provision of staff houses to accommodate health workers |
2023-02-02 |
2023-05-03 |
MWK |
33266851.00 |
|
|
644 |
3e9b93fb |
Chapananga Police Unit |
implementation
|
construction |
Construction of Chapananga Police Unit |
Improve security for the area and community |
2023-02-01 |
2023-05-02 |
MWK |
79994226.06 |
|
|
646 |
bce2094d |
Njereza CDSS Classroom block and procuring of furniture |
implementation
|
construction |
Construction of Njereza CDSS Classroom block and procuring of furniture |
Improve quality education services through construction of classroom block to accommodate learners |
2023-02-03 |
2023-05-04 |
MWK |
60000000.00 |
|
|
648 |
a89cf1d6 |
Konzere CDSS Classroom Block and Supply of Furniture |
implementation
|
construction |
Construction of Konzere CDSS Classroom Block and Supply of Furniture |
Improve quality education services through construction of a classroom block |
2023-02-03 |
2023-05-04 |
MWK |
66047461.81 |
|
|
650 |
017a8186 |
Tizola Martenity Wing and Supply of furniture |
implementation
|
construction |
Construction of Tizola Martenity Wing and Supply of furniture |
Improve primary health service delivery |
2023-02-03 |
2023-05-04 |
MWK |
120000000.00 |
|
|
651 |
LMC/IPDC/2023-24/W/002 |
COMPLETION OF FIVE KIOSKS AT CRAFT CENTRE |
implementation
|
construction |
we are remaining with the following activities: roofing, B- Filling, wiring and electrification,plastering, cementing and painting |
commercialization |
2023-09-17 |
2023-12-16 |
MWK |
12433547.50 |
|
|
655 |
d0a8b04a |
Makala Teachers House |
implementation
|
construction |
Construction of Makala Teachers House |
Improved education service delivery through construction of a teachers house |
2023-02-03 |
2023-05-04 |
MWK |
37034265.10 |
|
|
656 |
MW-ZADC-316656-CW-RFB |
CHINGALE MATERNITY WING |
implementation
|
construction |
Construction of a maternity wing |
Construction of a maternity wing with aim to host expecting mothers |
2023-03-01 |
2023-06-30 |
MWK |
140104498.67 |
|
|
657 |
MW-MJDC-316546-CW-RFB |
Construction of Chanunkha CDSS School Blocks and furnishing with students desks and teachers chairs and desks |
completed
|
construction |
The project involved construction of a classroom block furnished with desks |
To enable students learning in a contusive environment |
2022-11-07 |
2023-01-08 |
MWK |
58940486.46 |
|
|
659 |
b46e74ad |
Chikwawa Community Ground Fence |
implementation
|
construction |
Construction of Chikwawa Community Ground Fence |
Improve sports development
Increase Council revenue generation |
2023-02-02 |
2023-05-03 |
MWK |
98000000.00 |
|
|
662 |
3ff0e6a8 |
Chilongoma Primary School Classroom Block and Supply of furniture |
implementation
|
construction |
Construction of Chilongoma Primary School Classroom Block |
To improve education service delivery through construction of classroom block |
2023-02-16 |
2023-05-17 |
MWK |
58761957.75 |
|
|
666 |
RFQ/ZADC/DDF/2022/2023/03 |
NACHUMA MARKET SHADE |
implementation
|
construction |
Construction of a market shade |
to create a conducive environment for trading |
2023-03-01 |
2023-05-30 |
MWK |
34268280.75 |
|
|
668 |
BDC/DDF/W/2023-2024/055 |
Construction of Mgomwa Market Shed |
implementation
|
construction |
Construction of the market Shed, and double hole VIP Toilet |
Improve Market Infrastructure, sanitation and hygiene |
2023-06-19 |
2023-09-19 |
MWK |
25319254.50 |
|
|
669 |
NEDC/DDF/W/2223-03 |
Completion of Mchacha 58 under five Clinic and a double door latrine |
completion
|
construction |
Completion of Mchacha 58 under five Clinic and a double door latrine |
Delivery of health services |
2023-03-28 |
2023-06-28 |
MWK |
13938800.21 |
|
|
671 |
MW-ZADC-316658-CW-RFB |
REHABILITATION OF MAPHANDA NAPHALI ROAD |
implementation
|
construction |
Rehabilitation and spot graveling of Maphanda Naphali road via matiya |
leveling and graveling of a 10km stretch for easy transportation |
2023-06-01 |
2023-08-31 |
MWK |
114876104.76 |
|
|
672 |
MW-MJDC-353803-CW-RFQ |
Construction of Cassava cooperative flour Factory |
implementation
|
construction |
The project will involve the Construction of Cassava factory & installation of Cassava Processing Machine |
To increase agricultural productivity and adding value chain to famers agricultural produce |
2022-11-07 |
2023-01-31 |
MWK |
83827731.14 |
|
|
673 |
MNDC/W/06/22-23/62 |
Construction of Boma market flush toilet |
completed
|
construction |
The project involves construction of a flush toilet at Boma market |
To improve sanitation at the market |
2022-06-18 |
2022-08-24 |
MWK |
15956640.00 |
|
|
674 |
NEDC/DDF/W/2223-03 |
Mbenje water reticulation |
implementation
|
construction |
Mbenje water reticulation |
Water resource |
2023-03-27 |
2023-06-27 |
MWK |
202107.07 |
|
|
677 |
MW-MJDC-316542-CW-RFB |
Construction of Makazombo Bridge |
completed
|
construction |
The project involved the Construction of Box Culvert at Makazombo river |
To ease transportation of goods and also ease the access to socio amenities. |
2022-11-07 |
2023-01-31 |
MWK |
36976798.00 |
|
|
680 |
NEDC/DDF/W/2223-05 |
Bangula market 2 (Double door toilets) |
implementation
|
construction |
Zondola SchoolDouble door toilets |
Provide sanitation to market users |
2023-01-08 |
2023-03-08 |
MWK |
10450671.25 |
|
|
679 |
BDC/DDF/W/2023-2024/056 |
Construction of Balaka DHO Guardian Shelter |
implementation
|
construction |
Construction of a Gurdian Shelter structure at Balaka District Hospital |
Improve delivery of Health Facilities |
2023-06-20 |
2023-09-19 |
MWK |
38141832.00 |
|
|
681 |
MW-ZADC-316658-CW-RFB |
CONSTRUCTION OF MATANDANI BRIDGE 1 & 2 |
implementation
|
construction |
construction of Matandani bridge 1 & 2 |
constructing concrete deck for easy passing of the streams |
2023-03-01 |
2023-06-30 |
MWK |
93028732.50 |
|
|
676 |
MW-MDC318986-CW-RFQ |
Construction of Kabango market shade |
completed
|
construction |
The project will involve the construction of a new market shade. |
Revenue generation for the council |
2023-01-18 |
2023-04-18 |
MWK |
36791582.90 |
|
|
683 |
NEDC/DDF/W/2223-06 |
Lulwe Market (2 Single door toilets) |
implementation
|
construction |
Lulwe Market (2 Single door toilets) |
Market services |
2023-01-08 |
2023-03-08 |
MWK |
10450671.25 |
|
|
685 |
MW-NEDC-316442-CW-RFB |
Construction of 2 market shades at Tengani market |
implementation
|
construction |
Construction of 2 market shades at Tengani market |
Market shelter |
2023-01-07 |
2023-03-07 |
MWK |
43960835.65 |
|
|
687 |
MW-CZDC-316514-CW-RFB |
Construction of Ng'omba HealthPost |
implementation
|
construction |
Roofed |
To improve Health Services Delivery |
2023-03-02 |
2023-06-02 |
MWK |
59954838.00 |
|
|
689 |
MW-NEDC-316455-CW-RFB |
Construction of fully furnished Alufandika Secondary School Classroom Block (Semidetached) |
implementation
|
construction |
Construction of fully furnished Alufandika Secondary School Classroom Block (Semidetached) |
Education services |
2023-01-07 |
2023-03-07 |
MWK |
48051130.84 |
|
|
690 |
NLGFC-MoH-Works/2/2022 |
Rehabilitation of Balaka District Hospital OPD |
implementation
|
rehabilitation |
Rehabilitation of existing structure that include modification of rooms, painting and ceiling, sanitary fittings and external works |
Improve access to health service |
2023-06-14 |
2024-03-14 |
MWK |
183784405.73 |
|
|
691 |
MW-NEDC-316641-CW-RFB |
Construction of fully furnished Mbenje Police Unit |
implementation
|
construction |
Construction of fully furnished Mbenje Police Unit |
Security services |
2023-03-28 |
2023-06-28 |
MWK |
46331963.66 |
|
|
693 |
RFQ/ZADC/DDF/2022/2023/02 |
REHABILITATION OF COUNCIL CHAMBER |
implementation
|
rehabilitation |
rehabilitation of council chamber at Zomba District Council offices |
to create a conducive environment for hosting meetings |
2023-03-01 |
2023-05-30 |
MWK |
25209391.19 |
|
|
694 |
MW-NEDC-316442-CW-RFB |
Installation of piped water at Sorgin Trading Centre (1Km with 5 Kiosks) |
implementation
|
construction |
Installation of piped water at Sorgin Trading Centre (1Km with 5 Kiosks) |
Water sanitation |
2023-03-27 |
2023-06-27 |
MWK |
35571066.68 |
|
|
697 |
MNDC/W/02/2021-22/457 |
Construction of Border Flush Toilet |
completed
|
construction |
Construction of 4 toilet rooms and 2 shower rooms |
Sanitation and revenue for the council |
2022-03-15 |
2023-06-09 |
MWK |
15930071.21 |
|
|
699 |
MW-NEDC-316452-CW-RFB |
Completion of fully furnished Mcherenje Primary School Classroom Block |
completion
|
construction |
Completion of mcherenje fully furnished classroom block |
To provide a conducive environment for learning |
2023-03-28 |
2023-06-25 |
MWK |
33606010.46 |
|
|
700 |
ZDC/GESD/DDF/W/2021/2022/4 |
CONSTRUCTION OF NAMADIDI MARKET SHADE |
implementation
|
construction |
Construction of market shade |
to create a conducive environment for trade |
2023-03-01 |
2023-05-30 |
MWK |
41342733.80 |
|
|
702 |
RFQ/MNDC/W/2021-22/28 |
Completion of Thambani Police staff house |
completed
|
construction |
This project invlves completion of police staff housing at Thambani police unit which failed to completed year ago |
To reduce housing challenges among police officers |
2022-10-01 |
2022-12-30 |
MWK |
5500000.00 |
|
|
703 |
MW-NEDC-316454-CW-RFB |
Tengani Market Butchery and Slaughter house |
completed
|
construction |
Construction of Tengani Market Butchery and Slaughter house |
To provide improved environment for business activities |
2023-01-07 |
2023-03-07 |
MWK |
47277913.50 |
|
|
704 |
MW-CZDC-316517-CW-RFB |
Construction of Yasini Market Shed at Likoswe |
implementation
|
construction |
Construction of Market Shed |
To increase Council local revenue |
2023-02-16 |
2023-06-02 |
MWK |
33653700.00 |
|
|
638 |
MW - MDC 318994 - CW - RFQ |
Construction of Kalanga market shade |
completed
|
construction |
The project will involve a new construction of a market shade |
This project is expected to provide conducive business environment for people around Kalanga and other business persons at the same time expanding the base for local revenue collected hence improving council economic sustainability |
2023-01-18 |
2023-04-18 |
MWK |
37609872.93 |
|
|
705 |
MW-CZDC-3353700-CW-RFB |
Construction of Nyandule Primary Classroom block |
implementation
|
construction |
Construction of classroom block and toilet |
to reduce classroom-pupil ratio |
2023-03-08 |
2023-07-08 |
MWK |
62094784.00 |
|
|
706 |
MW-CZDC-335910-CW |
Chimwalira Health Post |
implementation
|
construction |
Construction of health post |
provision of health service delivery |
2023-03-08 |
2023-06-08 |
MWK |
57969156.00 |
|
|
708 |
MW-MJDC-316546-CW-RFB 2 |
Construction of Waluma CDSS School Block 2 and furnishing it with students desks and teachers chairs and desks |
completion
|
construction |
The project will involve the Construction of Waluma School block 2 and furnishing it with Desks |
To ease access to education to learners within the surrounding community. |
2022-11-07 |
2023-01-31 |
MWK |
58940486.46 |
|
|
709 |
MW-MJDC-316948-GO-RFB 1 |
Operationalization of Ndanga Maternity Wing |
completion
|
expansion |
The project will involve the Supply and delivery of Medical equipment and supplies to Ndanga Maternity Wing for operationalization |
To ease access to care and health service delivery within the surrounding community |
2022-11-07 |
2023-01-31 |
MWK |
46999738.95 |
|
|
710 |
MW-MJDC-316542-CW-RFB |
Construction of Makala Concrete pads |
completed
|
construction |
The project will involve the Construction of Concrete Pads on either sides of Makala road |
To ease transportation and communication |
2022-11-07 |
2023-01-10 |
MWK |
31488785.00 |
|
|
711 |
MW-MJDC-316541 |
Construction of (5) market toilets at Mizimu, Mwanakhu, Lauderdale and Chikuse and Chimbalanga |
completed
|
construction |
The project involved the Construction of (1 ) double-hole market toilet at Mizimu, Mwanakhu, Chikuse, Lauderdale and Chimbalanga |
To enhance sanitation within the markets and also to increase revenue generation for the Council |
2022-11-07 |
2023-01-31 |
MWK |
23395840.00 |
|
|
712 |
MW-MJDC-316529-CW-RFB |
Rehabilitation of Tcherekere Irrigation Scheme intake weir 1 |
completed
|
rehabilitation |
The project was involving the Rehabilitation of Tcherekere Irrigation Scheme and the intake weir |
To increase crop production and crop diversification among surrounding communities |
2022-11-07 |
2023-01-31 |
MWK |
24738302.93 |
|
|
713 |
MW-MJDC-316534-CW-RFQ |
Construction of Ndanga Maternity Staff House , VIP toilet, Placenta pit, ash-pit and Incinerator 1 |
completion
|
construction |
The project is involving the Construction of a staff house, Pit latrine, Placenta, Incinerator and ash-pit at Ndanga Maternity Wing |
To ease access to health services to the surrounding community and also to make it full operational |
2022-11-07 |
2023-01-31 |
MWK |
52110550.40 |
|
|
618 |
RFQ/ZADC/DDF/2022/2023/01 |
NATCHENGWA SCHOOL BLOCK |
implementation
|
construction |
Construction of Natchengwa School Block at Namalima VDC T/A Ngwelero |
To provide a conducive environment for learning |
2023-03-01 |
2023-05-30 |
MWK |
51490069.82 |
|
|
707 |
MW-CZDC-337730-CW-MW |
Completion of Mbunda Health Post |
completed
|
construction |
Completion of Health Post and Construction a toilet |
to improve health services |
2023-03-21 |
2023-06-10 |
MWK |
9458437.00 |
|
|
653 |
CZDC/DDF/NAMAPALE/2022-23/01 |
Construction of Namapale Concrete Pad |
completed
|
construction |
Construction of Concrete Slab Road Pad |
To provide access |
2023-02-01 |
2023-05-01 |
MWK |
15957007.00 |
|
|
698 |
031/MDC/DDF/HEALTH/HOSPITAL SECTOR/REFUBISHMENT/MACHINGA DISTRICT HOSPITAL KITCHEN |
Machinga DHO- Kitchen rehab |
implementation
|
rehabilitation |
Fixing wall and floor tiles, ceiling, sanitary and electrical works |
improve access to health care services. |
2023-08-21 |
2023-10-20 |
MWK |
37947378.00 |
|
|
692 |
091/MHGDC/DDF/PUBLIC WORKS/NAMPEYA MARKET SHED |
Nampeya Market shed. |
implementation
|
construction |
construction of a market shed. |
improve access to market. |
2022-04-16 |
2022-06-15 |
MWK |
37604189.37 |
|
|
686 |
MHGDC/GESD/32457/CW/RFB |
Mkwinda under 5 clinic |
implementation
|
construction |
construction of Mkwinda under 5 clinic |
improve access to health care services. |
2022-04-16 |
2022-06-15 |
MWK |
37971750.00 |
|
|
695 |
031/MDC/DDF/HEALTH/HOSPITAL SECTOR/REFUBISHMENT/MACHINGA DISTRICT HOSPITAL MORTUARY |
Machinga District Hospital-mortuary rehab |
implementation
|
rehabilitation |
Supply and installation of two cold rooms of capacity of 6 bodies each |
improved access to health care services |
2023-08-21 |
2023-10-20 |
MWK |
61501260.00 |
|
|
658 |
MHGDC/GESD/32451/CW/RFB |
Mgonachawi School Block |
completion
|
construction |
Construction of double classroom block, 2 double Toilets and supplying of 60 desks |
To improve learners perfomance |
2023-01-16 |
2023-03-17 |
MWK |
49006850.00 |
|
|
524 |
MW-RDA-320756-CW-RFB |
CONTRUCTION OF CHIWETA EPA OFFICE BLOCK |
completion
|
construction |
The project involves construction of an office block for Chiweta EPA |
To create a conducive environment for working. this will ease access of for the office to people |
2023-02-10 |
2023-05-10 |
MWK |
39575230.46 |
|
|
531 |
MW-RDA-320752-CW-RFB |
CONSTRUCTION OF BOMA YOUTH CENTRE |
completed
|
construction |
the project involves construction of a youth centre |
to create an environment for youth to interact |
2023-02-09 |
2023-06-18 |
MWK |
62105702.35 |
|
|
502 |
MW-RDA-320757-CW-RFM |
CONSTRUCTION OF JUNJU GIRLS HOSTEL |
implementation
|
construction |
The project involves construction of hostel to accommodate girls at Junju CDSS. The hostel will accomadate80 female learners. It will also carter for beds and mattresses. |
difficulty to access secondary education after completion of primary education, leads more teanergers in hard to reach areas drop out of school. as a result there are a lot of teenage pregnancies and early marriages. the hostel will provide accommodation for girls thereby, eliminating walking distances from home to school. girls will have enough time to study, discuss school work and rest after studies. this will in-turn improve pass rate and reduce drop out rate among girl child learners. |
2023-02-09 |
2023-06-18 |
MWK |
90423987.56 |
|
|
546 |
Upgrading to Asphalt Surface of Nthukwa via Hema to Mboni (0.8km) |
Upgrading to Asphalt Surface of Nthukwa via Hema to Mboni (0.8km) |
implementation
|
construction |
Upgrading to Asphalt Surface of Nthukwa via Hema to Mboni (0.8km) |
Transportation |
2021-12-06 |
2022-05-05 |
MWK |
459000000.00 |
|
|
529 |
MDC/NCB/GESD/2021-22/011 |
Chitokoto-Zakeyo Solar Powered Drip Irrigation Scheme |
completed
|
construction |
Design and building Chitokoto solar powered irrigation scheme covering an area of 5ha. |
Improving food security in the surrounding area through installation of mechanized solar powered irrigation scheme. |
2021-12-20 |
2022-02-18 |
MWK |
30009183.93 |
|
|
520 |
CPDC/01/11/22f |
Construction of girls Hostel at Misiku CDSS |
completed
|
construction |
The project will construct an eighty-bed hostel |
To promote girl child education as they are provided with decent accommodation within the school premises hence averting other social and physical distractors on their education |
2022-01-01 |
2022-04-01 |
MWK |
51624823.65 |
|
|
501 |
MCC/ROADS/RESF/23/01 A LOT 2 |
Reshaping and associated drainage works on selected roads in Mzuzu City |
implementation
|
rehabilitation |
Reshaping and associated drainage works on selected roads in Mzuzu City |
To rehabilitate some roads that are in bad shape as well as clearing of drainage system. This will help ease challenges road users face when using such roads. The drainage part is a measure to control unnecessary run off. |
2023-03-15 |
2023-06-15 |
MWK |
2624375.00 |
|
|
533 |
MW-RDA-320753-CW-RFB |
CONSTRUCTION OF MDIMWA PRIMARY CLASSROOM BLOCK |
implementation
|
construction |
CONSTRUCTION OF CLASSROM BLOCK FOR PRIMARY SCHOOL |
THE SCHOOL IS LOCATED IN VERY REMOTE AREA, VERY HARD TO REACH DUE TO TOPOGRAPHY. THIS PROJECT WILL EASE ACCESS TO PRIMARY EDUCATION |
2023-04-05 |
2023-08-05 |
MWK |
43036415.50 |
|
|
555 |
PSIP 2130 |
Rehabilitation and Expansion of Dwangwa, Salima, Nkhota-kota and Ntchisi Schemes |
implementation
|
expansion |
The project involves rehabilitating aged infrastructure which has outlived its design life, upgrading and expanding existing water supply systems to meet the growing demand in Dwangwa, Salima, Nkhotakota and Ntchisi |
The purpose of the project is to increase access to potable water in Dwangwa, Salima, Nkhotakota and Ntchisi by increasing water supply coverage and improving water supply reliability |
2019-07-01 |
2025-03-31 |
MWK |
136683000000.00 |
|
|
592 |
ZCC/GOV/RD/ENG/2021-22/03 |
Upgrading of Chinamwali-Ndelemani Road |
implementation
|
construction |
2.3km Road Upgrading to Asphalt
class 2 road with 8 meters wide and masonary drainage |
Connect local markets and people |
2023-04-14 |
2023-10-11 |
MWK |
980904125.00 |
|
|
522 |
MCC/ROADS/BRG/IDF/22/10/02 |
MAINTANANCE OF TIMBER BRIDGES IN CHIBAVI, MCHENGAUTUBA WEST, AND GAGDAD BRIDGES |
implementation
|
rehabilitation |
To maintain the bridges in the selected wards |
To ease mobility in the selected areas |
2023-02-06 |
2023-07-06 |
MWK |
3490625.00 |
|
|
562 |
BTDC/W/BT/NORTH/052/2022 |
MTANAMGALA TWO SPAN CONCRETE REHAB(MATERIALS) |
completed
|
rehabilitation |
Rehabilitation of a concrete |
rehabilitation |
2022-10-22 |
2022-12-22 |
MWK |
7260000.00 |
|
|
563 |
BTDC/W/CDF/W/091/2022 |
CONSTRUCTION OF CHITUNDU SCHOOL BLOCK |
implementation
|
construction |
CONSTRUCTION OF CHITUNDU SCHOOL BLOCK |
Provide conducive learning environment |
2022-01-23 |
2022-02-23 |
MWK |
33845548.14 |
|
|
564 |
BTDC/W/BT/SW/050/2022 |
CONSTRUCTION OF NTAYAMWANA 2 CONCRETE BRIDGE |
completed
|
construction |
CONSTRUCTION OF NTAYAMWANA 2 CONCRETE BRIDGE |
to facilitate accessibility to social services |
2022-10-22 |
2022-12-22 |
MWK |
35847554.00 |
|
|
565 |
BTDC/W/CDF/NORTHEAST/089/2022 |
MAONI SCHOOL BLOCK REPAIRS |
completion
|
rehabilitation |
REPAIRING A SCHOOL BLOCK |
Provide conducive learning environment |
2022-07-22 |
2022-08-22 |
MWK |
12700000.00 |
|
|
566 |
W/045/2012 |
CONSTRUCTION OF BENCHES AT DZIWE MARKET |
implementation
|
construction |
BENCHES CONSTRUCTION |
BENCHES FOR VENDORS |
2012-09-22 |
2012-10-22 |
MWK |
5524152.00 |
|
|
567 |
W/MPEMBA/MARKET/003/2022 |
COMPLETION OF MPEMBA MARKET |
implementation
|
construction |
MARKET CONSTRUCTION |
MARKET CONSTRUCTION |
2022-06-22 |
2022-10-22 |
MWK |
100000000.00 |
|
|
568 |
BTDC/W/DDF/06/2022 |
NAKAZIMU SCHOOL BLOCK |
completed
|
construction |
SCHOOL BLOCK CONSTRUCTION |
Provide conducive learning environment |
2022-12-22 |
2023-03-23 |
MWK |
36000000.00 |
|
|
569 |
W/BH/008/2022 |
CONSTRUCTION OF THREE BOREHOLES |
completion
|
construction |
BOREHOLE DRILING |
WATER SUPPLY |
2022-06-22 |
2022-07-22 |
MWK |
60000000.00 |
|
|
570 |
W/DDF/SW/04/2022 |
MANG'OMBA CLASSROOM BLOCK |
completed
|
construction |
CONSTRUCTION OF CLASSROOM BLOCKS |
CLASSROOM CONSTRUCTION |
2022-06-22 |
2022-08-22 |
MWK |
34950750.00 |
|
|
571 |
BTDC/W/BT/SW/051/2022 |
CONSTRUCTION OF NAMICHIMBA BRIDGE |
completed
|
construction |
BRIDGE CONSTRUCTION |
to facilitate accessibility to social services |
2022-10-22 |
2022-12-22 |
MWK |
13519097.00 |
|
|
572 |
BTDC/W/CDF-W/090/2022 |
CONSTRUCTION OF CHIGOMBE SCHOOL BLOCK |
implementation
|
construction |
SCHOOL BLOCK CONSTRUCTION |
Provide conducive learning environment |
2022-01-23 |
2022-10-22 |
MWK |
39422004.09 |
|
|
573 |
BTDC/W/CDF-W/085/2022 |
ELECTRIFICATION OF CHIKULI POLICE |
completed
|
rehabilitation |
CHIKULI POLICE ELECTRIFICATION |
TO SUPPLY ELECTRICITY |
2022-01-23 |
2022-02-23 |
MWK |
3234000.00 |
|
|
574 |
BTDC/W/CDF-W/084/2022 |
MAITENANCE OF CHIKOWA HEALTH CENTRE |
completion
|
rehabilitation |
HEALTH CETRE MAINTENANCE |
TO IMPROVE THE CONDITION OF THE HEALTH CETRE |
2022-01-23 |
2022-03-23 |
MWK |
14500000.00 |
|
|
575 |
W/051/2022 |
CONSTRUCTION OF KHUNGULU SCHOOL SEMI-DETACHED HOUSE |
implementation
|
construction |
HOUSE CONSTRUCTION |
HOUSE CONSTRUCTION |
2022-06-22 |
2022-11-22 |
MWK |
10000000.00 |
|
|
576 |
W/048/2022 |
CONSTRUCTION OF MICHILU SCHOOL SEMI DETACHED HOUSE |
implementation
|
construction |
HOUSE CONSTRUCTION |
dwelling house for a primary school teacher |
2022-03-22 |
2022-11-22 |
MWK |
10000000.00 |
|
|
577 |
BTDC/W/CDF-RURA LEAST 082/2022 |
CONSTRUCTION OF NAMATANU BRIDGE |
completed
|
construction |
BRIDGE CONSTRUCTION |
TO PROVIDE ACCESS TO SOCIAL SERVICES |
2022-01-23 |
2022-02-23 |
MWK |
20932250.25 |
|
|
578 |
BTDC/W/CDF-RURAL 079/2022 |
MLOMBOZI SCHOOL BLOCK MAITENANCE |
completed
|
rehabilitation |
BLOCK REHABILITATION |
Provide conducive learning environment |
2022-01-23 |
2022-02-23 |
MWK |
27200000.00 |
|
|
579 |
BTDC/W/CDF-RURAL EAST/082/2022 |
NAMIKATE SCHOOL BLOCK MAITENANCE |
completed
|
rehabilitation |
BLOCK REHABILITATION |
Provide conducive learning environment |
2022-01-23 |
2022-02-23 |
MWK |
11800000.00 |
|
|
580 |
BTDC/W/CDF/RURAL EAST/089/2022 |
MAINTENANCE OF MAKOMANO CONCRETE BRIDGE |
completed
|
rehabilitation |
CONCRETE MAITENANCE |
to facilitate accessibility to social services |
2022-12-22 |
2023-01-23 |
MWK |
4072845.00 |
|
|
582 |
BTDC/W/45/2021/22 |
CHILINGANI SCHOOL BLOCK |
completed
|
construction |
CONSTRUCTION OF A SCHOOL BLOCK |
to accommodate more students and to Provide conducive learning environment |
2021-10-22 |
2022-02-23 |
MWK |
13991600.00 |
|
|
583 |
BTDC/W/WSF/04/2023 |
CONSTRUCTION OF FOUR BOREHOLES |
completed
|
construction |
BOREHOLE CONSTRUCTION |
WATER SUPPLY |
2022-09-22 |
2022-10-22 |
MWK |
17954000.00 |
|
|
584 |
BTDC/W/WSF/05/2023 |
CONSTRUCTION OF 6 BOREHOLES |
completed
|
construction |
BOREHOLE CONSTRUCTION |
WATER SUPPLY |
2022-11-22 |
2023-03-23 |
MWK |
26080000.00 |
|
|
585 |
BTDC/W/BT/CDF/051/2022 |
ELECTRIFICATION OF MADZIABANGO HEALTH CENTER |
completed
|
rehabilitation |
ELECTRIFICATION |
TO SUPPLY POWER ON THE HEALTH CENTER |
2022-07-22 |
2022-10-22 |
MWK |
20405694.65 |
|
|
586 |
BTDC/W/BT/NORTH/086/2022 |
MAINTENANCE OF NDALAPA CLASSROOM BLOCKS |
completed
|
rehabilitation |
BLOCK MAIINTENANCE |
Provide conducive learning environment |
2022-03-22 |
2022-06-22 |
MWK |
676700.00 |
|
|
587 |
BTDC/W/BT/N/001/2022 |
CONSTRUCTION OF CHINAMVUWU PRIMARY SCHOOL BLOCK |
completed
|
construction |
BLOCK CONSRUCTION |
Provide conducive learning environment |
2022-07-22 |
2022-09-22 |
MWK |
1750000.00 |
|
|
588 |
BTDC/W/BT/N/053/2023 |
LINJIZI BRIDGE RECONSTRUCTION |
completed
|
construction |
BRIDGE RECONSTRUCTION |
to facilitate accessibility to social services |
2022-10-22 |
2022-12-22 |
MWK |
33500000.00 |
|
|
589 |
BTDC/W/BT/NORTH EAST/006/2022 |
CHIKABVUMBWA SCHOOL BLOCK |
completed
|
construction |
SCHOOL BLOCK CONSTRUCTION |
to facilitate accessibility to social services |
2022-06-22 |
2022-08-22 |
MWK |
22500000.00 |
|
|
590 |
BTDC/W/CDF/RURAL EAST/005/2022 |
PULI UNDER FIVE CLINIC |
implementation
|
construction |
UNDER FIVE CLINIC CONSTRUCTION |
to facilitate availability of social services |
2022-06-22 |
2022-08-22 |
MWK |
16669400.00 |
|
|
591 |
BTDC/W/338/2022 |
ELECTRIFICATION OF CHAWETA PRIMARY SCHOOL |
completed
|
rehabilitation |
BRINGING ESCOM POWER |
TO SUPPLY POWER TO THE SCHOOL |
2022-07-22 |
2022-09-22 |
MWK |
17150000.00 |
|
|
603 |
BTDC/CDF/W/SOUTH WEST/006/2023/24 |
CONSTRUCTION OF INCINERATOR AND PLACENT A PIT AT SOCHE MATERNITY HEALTH CENTRE |
implementation
|
construction |
CONSTRUCTION |
TO IMPROVE THE WORKING CONDITION |
2023-09-01 |
2023-12-01 |
MWK |
20596834.57 |
|
|
604 |
BTDC/W/CDF-BT SOUTH WEST/007/23 |
CONSTRUCTION OF 10M SIGALIRA CONCRETE BRIDGE |
implementation
|
construction |
CONSTRUCTION |
TO FACILITATE ACCESSIBILITY TO SOCIAL SERVICE |
2023-08-29 |
2023-10-29 |
MWK |
27556701.00 |
|
|
605 |
BTDC/W/CDF-BT SOUTH WEST/019/2023 |
CONSTRUCTION OF NAPERI CONCRETE BRIDGE |
implementation
|
construction |
BRIDGE CONSTRUCTION |
TO FACILITATE ACCESSIBILITY TO SOCIAL SERVICE |
2023-09-01 |
2023-10-01 |
MWK |
24996502.13 |
|
|
606 |
BTDC/DDF/NORTH/005/005/2023 |
CONSTRUCTION OF VIP TOILETS AT KAMWILI HEALTHY POST |
implementation
|
construction |
TOILETS CONSTRUCTION |
TO IMPROVE THE HYGIENE |
2023-08-07 |
2023-08-22 |
MWK |
3611701.19 |
|
|
607 |
BTDC/W/CDF/BT NORTH EAST/005/2023/24 |
MAINTENANCE OF MTONDOKO CLINIC |
completed
|
rehabilitation |
MTONDOKO CLINIC |
TO IMPROVE THE CONDITION OF A CLINIC |
2023-07-26 |
2023-08-31 |
MWK |
6937179.00 |
|
|
610 |
BCC/RFA- |
Pothole Patching and Associated Routine Maintenance Works on Selected Urban Paved Roads in Blantyre City -Blantyre Area-LOT 1 |
completed
|
rehabilitation |
Pothole Patching and Associated Routine Maintenance Works on Selected Urban Paved Roads in Blantyre City -Blantyre Area-LOT 1 |
Improve road condition |
2023-02-22 |
2023-06-21 |
MWK |
132014334.38 |
|
|
612 |
BTDC/W/DDF/SOUTH WEST/006/2023 |
CONSTRUCTION OF MATANDANI BRIDGE |
implementation
|
construction |
BRIDGE CONSTRUCTION |
TO FACILITATE ACCESS TO SOCIAL SERVICES |
2023-09-01 |
2023-10-01 |
MWK |
29897628.17 |
|
|
701 |
MW-NEDC-316448-CW-RFB |
Construction of Sankhulani Guardian Shelter, Kitchen, Double door toilet and 2 bathrooms |
implementation
|
construction |
Construction of Sankhulani Guardian Shelter, Kitchen, Double door toilet and 2 bathrooms |
Provision of health services |
2023-01-07 |
2023-03-07 |
MWK |
26593412.71 |
|
|
714 |
MJDHO-P1645221 |
Operationalization of Mulanje District Hospital Paying Ward 1 |
completion
|
expansion |
The project will involve the Supply and delivery of Medical equipment for the operationalization of the paying ward at Mulanje District Hospital |
To ease congestion at the hospital and providing treatment at affordable rates |
2022-11-07 |
2023-01-31 |
MWK |
32184656.98 |
|
|
715 |
MW-MJDC-316529-CW-RFB |
Rehabilitation of Chitakale Market Sheds |
completed
|
rehabilitation |
The project was involving the Rehabilitation of Chitakale Market Shed and butchery |
To increase sanity in the market and also to enhance revenue generation within the market |
2022-11-07 |
2023-01-31 |
MWK |
30779598.92 |
|
|
717 |
CZDC/DDF/NGULUDI/2022-23/01 |
Chemwenye Road Improvement |
completed
|
rehabilitation |
Chemenye road improvement |
To improve access to social and economic services |
2023-01-31 |
2023-05-31 |
MWK |
17309238.00 |
|
|
718 |
MJDCDDF001 |
Rehabilitation of District Council Administration Block Phase 1 |
implementation
|
rehabilitation |
The project will involve the rehabilitation of Mulanje District Council Administration block during the 1st Phase |
To enhance working environment for Council staff and enable sanity. |
2022-11-07 |
2023-01-31 |
MWK |
114399840.40 |
|
|
719 |
MW-CZDC-337728-CW-RFQ |
June Jnr Primary Toilet |
implementation
|
construction |
Construction of June Jnr Primary toilet |
To improve sanitation service delivery at the school |
2023-03-20 |
2023-05-31 |
MWK |
3798399.00 |
|
|
721 |
MW-CZDC-335894-CW-RFQ |
Market Toilets Lot 1 |
preparation
|
construction |
Construction of Market toilets lot 1 |
To improve access to sanitation services in the markets |
2023-02-28 |
2023-05-28 |
MWK |
21299546.00 |
|
|
722 |
MW-PDC-319443-CW-RFB |
CONSTRUCTION OF MIGOWI-MUHAWA CONCRETE DECK BRIDGE |
implementation
|
construction |
CONSTRUCTION |
ROAD NETWORK |
2023-02-16 |
2023-06-16 |
MWK |
36501979.85 |
|
|
723 |
RFQ2023-2024-04-25-2023-PCT-4-W |
Construction of Balanguzi-Likole Culvert line |
completed
|
construction |
The Project involved construction of Culvert line at Balanguzi-Likole road |
For easy communication and transportation of goods |
2023-06-08 |
2023-07-07 |
MWK |
5318022.00 |
|
|
724 |
RFQ2023-2024-06-13-PCT-21-W |
Construction of Misomali 2 Box Culverts |
completed
|
construction |
The project will involve installation of a Box Culvert at Misomali 2 village |
To ease communication and transportation |
2023-06-08 |
2023-07-07 |
MWK |
5516272.50 |
|
|
725 |
RFQ2023-2024-01-06-2023-PTC006-W-DDF |
Construction of Chisutu-Mpachika Culvert Line |
completed
|
construction |
The project involved installation of a Culvert line at Chisutu-Mpachika road |
To ease transportation and communication |
2023-06-08 |
2023-07-07 |
MWK |
2647504.80 |
|
|
727 |
MW-CZDC-335894-CW-RFQ |
Market Toilets Lot 2 |
implementation
|
construction |
Construction of market toilets Lot 2 |
To improve access of sanitation services in the market areas |
2023-03-02 |
2023-06-02 |
MWK |
22059368.00 |
|
|
728 |
CZDC/DDF/MBULUMBUZI/2022-23/01 |
Construction of Administration CDSS block |
implementation
|
construction |
Construction of CDSS Administration block |
To provide good teaching environment |
2023-03-06 |
2023-07-06 |
MWK |
31767888.00 |
|
|
729 |
RFQ2023-2024-01-06EW001 |
Construction of 600mm Culvert Line at Gululu Stream |
completed
|
construction |
The project will involve the installation of Culvert line at Gululu stream |
To ease transportation and communication |
2023-06-08 |
2023-07-07 |
MWK |
2998050.00 |
|
|
730 |
RFQ2023-2024-01-06-DG004 |
Construction of Ntata-Mtcheche Culvert Line |
completed
|
construction |
The project will involve construction of culvert line at Ntata-Mtcheche road |
To ease transport and communication |
2023-06-08 |
2023-07-07 |
MWK |
2990501.55 |
|
|
731 |
RFQ2023-2024-01-06EW002 |
Construction of Musisi-Nansomba Culvert Line |
completed
|
construction |
The project involved construction of a culvert line at Musisi-Nansomba road |
To ease transportation and communication |
2023-06-08 |
2023-07-07 |
MWK |
3106477.50 |
|
|
732 |
RFQ2023-2024-PCT-004-W-DDF |
Construction of Chetsani-Matekenya Culvert Line |
completed
|
construction |
The project involved construction of a Culvert line at Chetsani-Matekenya road |
To ease transportation and communication |
2023-06-08 |
2023-07-07 |
MWK |
2990501.55 |
|
|
733 |
RFQ-2023-2024-01-06-DW006 |
Construction of Juma Culvert Line |
completed
|
construction |
The project involved construction of culvert line at GVH Juma |
To ease communication and transportation |
2023-06-08 |
2023-07-07 |
MWK |
2990501.55 |
|
|
734 |
CZDC/DDF/THUMBWE/2022-23/01 |
Decking of Masalani Concrete bridge |
completed
|
replacement |
Replacement of timber deck to concrete decking |
To provide access |
2023-01-31 |
2023-05-05 |
MWK |
10507040.00 |
|
|
735 |
RFQ2023-2024-01-06GD007 |
Construction of Chetsani-Matekenya Culvert Line 2 |
completed
|
construction |
The project involve construction of a culvert line at Chetsani-Matekenya 2 |
To ease communication and transportation |
2023-06-08 |
2023-07-07 |
MWK |
2998583.25 |
|
|
736 |
MW-CZDC-316515-CW-RFB |
Nankuyu Concret bridge |
implementation
|
construction |
construction of Nankuyu concret bridge |
To easy access social and economic services |
2023-01-07 |
2023-05-31 |
MWK |
28115296.00 |
|
|
737 |
RFQ2023-2024-PCT-008-WDDF |
Construction of Ngwezuthoto Culvert Line |
completed
|
construction |
The project involved construction of a culvert line at Ngwezuthotho road |
To ease communication and transportation |
2023-06-08 |
2023-07-07 |
MWK |
2994080.25 |
|
|
738 |
RFQ2023-2024-01-06-2023-PCT-001-W-DDF |
Construction of Nanthwatchwa Culvert Line |
completed
|
construction |
The project involves construction of culvert line at Nanthwatchwa village road |
To ease transport and communication |
2023-06-08 |
2023-07-07 |
MWK |
2971814.10 |
|
|
739 |
RFQ2023-2024-01-06EW002 |
Construction of Namijingo-Ng'oma Culvert Line |
completed
|
construction |
The project involved construction of culvert line at Namijingo-Ng'oma road |
To ease communication and transportation |
2023-06-08 |
2023-07-07 |
MWK |
2998050.00 |
|
|
740 |
RFQ2023-2024-01-06-DW006 |
Construction of Muruwane Culvert Line |
completed
|
construction |
The project involved construction of culvert line at Muruwane road |
To ease communication and transportation |
2023-06-08 |
2023-07-07 |
MWK |
3098916.00 |
|
|
741 |
RFQ2023-2024-PCT-002-W-DDF |
Construction of Mutanthe Culvert Line |
completed
|
construction |
The project involved construction of culvert line at Mutanthe road |
To ease communication and transportation |
2023-06-08 |
2023-07-07 |
MWK |
2998583.25 |
|
|
742 |
MW-CZDC-335913-CW-RFQ |
PIM TDC |
implementation
|
construction |
Construction of PIM TDC |
To improve education standards |
2023-03-08 |
2023-06-08 |
MWK |
37862920.00 |
|
|
748 |
BC/494/3 |
Construction of 88 No 2 bedroomed semi detached at Area 49/5 in Lilongwe |
completed
|
construction |
Construction of 88 No 2 bedroomed semi detached houses |
Providing shelter and affordable houses for the nation |
2019-03-29 |
2020-01-15 |
MWK |
2101693601.94 |
|
|
726 |
BC/494/5 |
Construction of 66 No.E3-72 semi detached Houses in Blantyre |
completed
|
construction |
66 No. Semi-detached Houses |
Providing Safety, Safety and Comfort to the Nation |
2019-03-23 |
2021-12-21 |
MWK |
1699762525.38 |
|
|
744 |
BC/494/4 |
Construction of 3 No. Block of 2 bedroom Flats at Nandolo in Zomba |
cancelled
|
construction |
3 No. 2 bedroom Flats |
Providing Safety ,Comfort and affordable to the Nation |
2019-03-28 |
2020-05-30 |
MWK |
739244998.15 |
|
|
745 |
BC/494/1 |
Construction of 8 No.2 Bedroom Houses & One Block of Flats at Chasefu in Mzuzu |
completed
|
construction |
8 No.2 Bedroom Houses & Flat |
providing Shelter ,Safety & affordable Houses to the Nation |
2019-03-27 |
2020-01-13 |
MWK |
551329929.67 |
|
|
763 |
BCC/WORKS/03/02/12/IDF/2023-2024 |
CONSTRUCTION OF POLICE UNIT NEAR BANGWE YOUTH CENTRE |
implementation
|
construction |
CONSTRUCTION OF POLICE UNIT NEAR BANGWE YOUTH CENTRE |
ENHANCE SECURITY |
2024-03-25 |
2024-05-07 |
MWK |
6983641.88 |
|
|
764 |
BCC/WORKS |
Construction of VIP toilet at Makhetha Market in South Lunzu |
completed
|
construction |
Construction of VIP toilet at Makhetha Market in South Lunzu |
Enhance sanitation |
2020-09-21 |
2020-10-12 |
MWK |
3233108.00 |
|
|
765 |
BCC/WORKS |
Construction of VIP toilet at Likotima Market in Chigumula |
completed
|
construction |
Construction of VIP toilet at Likotima Market in Chigumula |
Enhance sanitation |
2020-09-18 |
2020-10-09 |
MWK |
3191401.00 |
|
|
766 |
BCC/WORKS |
Construction of Kizito-Mudi Concrete Foot Bridge in Blantyre City East Constituency |
completed
|
construction |
Construction of Kizito-Mudi Concrete Foot Bridge in Blantyre City East Constituency |
Ease of mobility. |
2021-01-08 |
2021-02-07 |
MWK |
10934457.00 |
|
|
767 |
BCC/WORKS |
Construction of Kizito-Mudi Concrete Foot Bridge in Blantyre City East Constituency |
completed
|
construction |
Construction of Kizito-Mudi Concrete Foot Bridge in Blantyre |
Ease of Mobility |
2021-01-08 |
2021-02-08 |
MWK |
15734664.75 |
|
|
768 |
BCC/WORKS |
Rehabilitation of Kapeni-Mahatma Ghandhi Road in Blantyre City |
completed
|
rehabilitation |
Rehabilitation of Kapeni-Mahatma Ghandhi Road in Blantyre City |
Ease of transportation |
2021-02-10 |
2021-10-10 |
MWK |
454670253.00 |
|
|
770 |
BCC/RFA- |
Construction of Chilobwe -Stella Maris Road in the City of Blantyre |
completed
|
construction |
Construction of Chilobwe -Stella Maris Road in the City of Blantyre |
Enhance mobility |
2021-02-11 |
2021-10-11 |
MWK |
758792250.30 |
|
|
771 |
BCC/RFA- |
Construction of North Road -Market Street behind Limbe ESCOM in Blantyre city |
completed
|
construction |
Construction of North Road -Market Street behind Limbe ESCOM in Blantyre city |
Enhace mobility |
2021-02-11 |
2021-08-11 |
MWK |
465423689.06 |
|
|
773 |
BCC/WORKS |
Rehabilitation of Mbayani Health Centre roof in Blantyre Kabula Constituency |
completed
|
construction |
Rehabilitation of Mbayani Health Centre roof in Blantyre Kabula Constituency |
Promotion of good health |
2021-01-08 |
2021-02-08 |
MWK |
9624065.00 |
|
|
774 |
BCC/WORKS |
Provision of Insurance Service for the period 2021-2023 |
completed
|
construction |
Provision of Insurance Service for the period 2021-2023 |
Insurance |
2021-09-30 |
2023-09-30 |
MWK |
22393640.60 |
|
|
775 |
BCC/RFA- |
Construction of Michiru-Likhubula Road ( 1.5km) - Lot 6 |
implementation
|
construction |
Construction of Michiru-Likhubula Road ( 1.5km) - Lot 6 |
Enhance transportation |
2022-02-02 |
2022-09-30 |
MWK |
1375922853.90 |
|
|
776 |
BCC/RFA- |
Construction of Lali Lubani Road (1.7km) - Lot 2 |
completed
|
construction |
Construction of Lali Lubani Road (1.7km) - Lot 2 |
enhance transportation |
2022-02-02 |
2022-08-01 |
MWK |
1791304627.80 |
|
|
777 |
BCC/RFA- |
Construction Namiwawa-Sunnyside Road (2km) - Lot 1 |
completed
|
construction |
Construction Namiwawa-Sunnyside Road (2km) - Lot 1 |
Enhance transportation |
2022-02-02 |
2022-08-01 |
MWK |
1862160202.88 |
|
|
778 |
BCC/RFA- |
Construction of New Lands-Manje Road (2km) - Lot 7 |
completed
|
construction |
Construction of New Lands-Manje Road (2km) - Lot 7 |
Enhance transportation |
2020-04-04 |
2020-10-01 |
MWK |
1635220587.63 |
|
|
779 |
BCC/RFA- |
Construction of Chipatala - Kamba Road (1.2km) - Lot 5 |
completed
|
construction |
Construction of Chipatala - Kamba Road (1.2km) - Lot 5 |
Enhance mobility |
2022-02-04 |
2022-08-03 |
MWK |
1343621469.75 |
|
|
780 |
BCC/WORKS |
Rehabilitation of Angelogoveya Primary School |
completed
|
construction |
Rehabilitation of Angelogoveya Primary School |
To promote education |
2021-12-21 |
2022-01-20 |
MWK |
14218220.00 |
|
|
781 |
BCC/WORKS |
Provision of Insurance Services for the period 2021-2023 |
completed
|
construction |
Provision of Insurance Services for the period 2021-2023 |
Insurance |
2022-03-18 |
2024-03-18 |
MWK |
21441000.00 |
|
|
784 |
BCC/WORKS |
Supply and Delivery of Two 18m³ Compactors |
completed
|
construction |
Supply and Delivery of Two 18m³ Compactors |
Enhance mobility |
2022-07-20 |
2022-12-17 |
MWK |
377740000.00 |
|
|
797 |
P158805 |
Shire Valley Transformation Programme-1 (Construction of Remainer of Main Canal 1 and part of Main Canal 2) |
implementation
|
construction |
Construction of the remainder of main canal 1 and part of main canal 2 (from 6km to 42kms in Lengwe) |
Promotion of irrigation services to smallholder farmers and other farmers in the Shire Valley. 43,370 hectares to be irrigated through the project. |
2021-11-12 |
2024-12-31 |
USD |
78421122.08 |
|
|
798 |
P158805 |
Shire Valley Transformation Programme-1 (Construction of Secondary Pipelines) |
implementation
|
construction |
Construction of secondary pipelines to 13 irrigation blocks under phase 1 of the Shire Valley Transformation Programme |
Promotion of irrigation services to smallholder farmers and other farmers in the Shire Valley. 43,370 hectares to be irrigated through the project. |
2024-04-02 |
2026-04-02 |
USD |
48300000.00 |
|
|
746 |
CZDC/DDF/MITUMBIRA/2022-23/01 |
Mitumbira Concrete bridge |
completed
|
construction |
Mitumbira Concrete bridge |
easy access to social and economic services |
2023-03-01 |
2023-05-01 |
MWK |
17313442.00 |
|
|
716 |
P1641055 |
Rehabilitation of Chambe Gravity Fed Piped Water System |
completed
|
rehabilitation |
The project involved rehabilitation of Chambe Gravity Fed Piped water system from the intake to various communities within its catchment |
To ease access to portable water within the surrounding communities. |
2022-11-07 |
2023-01-31 |
MWK |
120780280.69 |
|
|
747 |
BC493A |
Construction of 6No Blocks of 2bedroomed House at Ngumbe |
completed
|
construction |
6No semi detached blocks of 2 bedrooms |
Providing shelter, safety and affordable houses to the nation |
2018-05-02 |
2018-11-02 |
MWK |
210206316.85 |
|
|
759 |
BTDC/W/DDF/0010/2024 |
MAINTEANCE OF CHIPANDE PRIMARY SCHOOL BLOCK |
implementation
|
rehabilitation |
MAITENANCE OF A SCHOOL BLOCKS |
PROVIDE CONDUCIVE LEARNING ENVIRONMENT BY MAINTAINING A 2 CLASSROOMSCHOOL BLOCK |
2024-03-13 |
2024-06-13 |
MWK |
16995744.00 |
|
|
760 |
BTDC/W/DDF/007 |
MZAMBA 1 BRIDGE |
implementation
|
construction |
BRIDGE |
TO PROVIDE ACCESS TO SOCIAL SERVICES |
2023-12-13 |
2024-02-13 |
MWK |
24060828.41 |
|
|
761 |
BTDC/W/DDF/006 |
MATANDANI BRIDGE |
implementation
|
construction |
CONSTRUCTION OF MATANDANI BRIDGE |
TO PROVIDE ACCESS TO SOCIAL SERVICE |
2023-08-18 |
2023-10-22 |
MWK |
29897629.17 |
|
|
762 |
BTDC/W/WATER/BOREHOLE/05/2023 |
CONSTRUCTION OF BOREHOLE AT KAMWIRI HEALTH POST |
implementation
|
construction |
BOREHOLE CONSTRUCTION |
TO PRIVIDE CLEAN WATER TO THE SOCIETY |
2023-07-26 |
2023-08-10 |
MWK |
4943812.50 |
|
|
769 |
BCC/RFA- |
Construction of Slip Lanes at Kamba,Kapeni, Keza and Southend School junction in Blantyre City |
completion
|
construction |
Construction of Slip Lanes at Kamba,Kapeni, Keza and Southend School junction in Blantyre City |
Enhance mobility |
2021-02-11 |
2021-04-12 |
MWK |
250216128.00 |
|
|
772 |
BCC/WORKS |
Drilling of two bore holes in Blantyre South East Constituency |
completed
|
construction |
Drilling of two bore holes in Blantyre South East Constituency |
Enhance sanitation |
2021-01-08 |
2021-02-08 |
MWK |
7906622.00 |
|
|
782 |
BCC/RFA- |
Construction of Ndirande -Nkolokoti (Makhetha Road) |
completed
|
construction |
Construction of Ndirande -Nkolokoti (Makhetha Road) |
Ease of mobility |
2022-07-27 |
2023-03-24 |
MWK |
3042438188.79 |
|
|
783 |
BCC/RFA- |
Detailed Engineering Design & Construction Supervision |
completed
|
construction |
Detailed Engineering Design & Construction Supervision |
Design supervision |
2022-07-13 |
2024-01-04 |
MWK |
301670340.00 |
|
|
785 |
BCC/WORKS |
Consultancy Services for Cadastral Survey for Area 11 Plots |
completed
|
construction |
Consultancy Services for Cadastral Survey for Area 11 Plots |
Sustainable town development |
2022-07-28 |
2022-09-26 |
MWK |
27492500.00 |
|
|
786 |
BCC/RFA- |
Pothole Patching and associated drainage works covering Limbe and Blantyre paved roads in Blantyre city (Lot 1, Blantyre area) |
implementation
|
rehabilitation |
Pothole Patching and associated drainage works covering Limbe and Blantyre paved roads in Blantyre city (Lot 1, Blantyre area) |
Road improvement works. |
2023-02-09 |
2023-05-10 |
MWK |
132014334.38 |
|
|
787 |
BCC/RFA- |
Pothole Patching and associated drainage works covering Limbe and Blantyre paved roads in Blantyre city (Lot 2, Limbe area) |
implementation
|
rehabilitation |
Pothole Patching and associated drainage works covering Limbe and Blantyre paved roads in Blantyre city (Lot 2, Limbe area) |
Road improvement works |
2023-03-06 |
2023-06-04 |
MWK |
150654137.81 |
|