Extension and Alteration of the Teaching Hospital at Malawi University of Science and Technology (MUST)

        Return back Please wait...
image

Extension and Alteration of the Teaching Hospital at Malawi University of Science and Technology (MUST)

The proposed works shall include the construction of a three-storey structure to match the existing number of floors for the existing building, purposefully designed to work and function as a hospital, with special consideration to all technical requirement for a Hospital Building to make sure it is accessible by all groups of people regardless of their physical ability. Ideally, the teaching hospital extension shall be used for the following purposes but not limited to the same, as such the consultant shall do their own research to enhance a functional approach for the facility. The floor matrix combination is that one desired by the client as annotated by Ground floor (GF), First floor (FF) and Second Floor SF). If, however, there is a strong design challenge to the preferred floor matrix as proposed by the client, the consultant shall liaise with the client and propose an alternative combination.

-Restore the University’s facilities outlook -Operationalise the teaching hospital as learning facility -offer specialized critical medical care to the public - Increase income generating capacity for the University -Reduce medical tourism for specialized medical services

Start date: 2022-07-01 Due date: 2025-06-30
4,500,000,000.00   MWK
Total Funding
2022-04-01
Approval date
2023-09-08
Last updated
expansion
Project Type
Implementaion
Project Status

Locations

DESCRIPTION DISTRICT REGION ADDRESS

completion